The figure that keeps getting drafted into the wrong story

Ask anyone who was there and the shorthand arrives fast: by the end of 1992, IP was carrying 90% of JANET's traffic, and that is why Britain built SuperJANET. The first half is a genuine finding from a genuine paper. The second half is a join the evidence never makes. SuperJANET was already planned, funded and contracted before the 90% figure was written down — and the paper that reports it uses the number to justify something narrower and far more interesting: making IP native in JANET's own backbone.

That distinction is not antiquarian tidiness. It is the difference between a plan, a running deployment and actual adoption — three things that get collapsed into one sentence every time a network's history is retold.

Two projects, one calendar

SuperJANET's planning began in 1989. The Universities Funding Council approved first-phase funding in December 1991. JIPS, the JANET IP Service, became available in October 1991 — carrying IP over the existing X.25 network rather than replacing it. The 1994 project account and a contemporary OECD report trace SuperJANET's own funding and deployment path, running alongside the IP service on the old backbone rather than springing from it.

Line the dates up and the causal story falls apart on its own. The high-speed project was two years into planning and a month past its funding decision when JIPS opened for business. The famous percentage was still three years away from being computed.

What 90% actually counted — and what it did not

Crowcroft and colleagues, writing in 1993, describe a service that had grown quickly: JIPS was using about one third of the 2 Mb/s backbone at the time. Two years later, Kim, Simpson, Hutchison and Scott looked back to the end of 1992 and reported IP-carrying X.25 traffic at 90% of total JANET traffic. Their brief historical passage does not define the unit.

So the two percentages are not points on a single graph. One measures JIPS against a 2 Mb/s pipe. The other measures IP carried over X.25 against everything JANET moved. Ninety percent does not mean a link ran at 90% of capacity, and it does not mean 90% of universities had migrated. It means the traffic mix had flipped — and that flip, the authors say, is what supported native IP in JANET's backbone and encouraged more users to switch.

The exit nobody scheduled for a single day

The 1995 authors put the spread of local-area networks at the centre of IP's growth. The change showed up in campus computing, not in a central plan handed down. They also record that UKERNA offered services to keep applications still dependent on X.25 working. The backbone was downgraded and withdrawal was intended, but the paper gives no final retirement date.

That is a phased transition, not a flag day — and the difference is the whole point. Growth on one side and a survivable exit on the other were two workstreams with two sets of owners, and neither one was waiting for a percentage to cross a line.

SuperJANET took its own road

SuperJANET moved in parallel. Its 1992 BT contract covered £18 million over four years, subject to review after the pilot. The OECD report planned a six-site pilot for March 1993 and described the new service as complementing JANET rather than replacing it. By April 1994, the 1995 account describes a 34 Mb/s SMDS backbone available to 60 sites, alongside a separate 16-site PDH network for ATM research.

The high-speed research network and JANET's native-IP evolution were related. They were not interchangeable. The Follett review treats JANET and SuperJANET as research, teaching and library infrastructure — and notes, bluntly, that some institutions still lacked the internal networks needed to benefit fully.

Why the distinction survives

The sequence matters: campus use made a backbone change defensible, while support for X.25-dependent services made a safe exit possible. One created the case, the other created the runway. Confusing them turns a traffic measurement into a founding myth, and founding myths are hard to audit.

Lu Heng's Note 65 on running-code primacy offers a retrospective lens for keeping plans, running deployments and adoption in separate boxes. It is a lens, not a witness: it is not evidence of what JANET's participants believed at the time.

The 90% figure is a fine number, honestly obtained and worth quoting. It is just a rear-view mirror, not a starting gun.

Sources