Summary
- MC Digital Realty describes the same portfolio in IT power capacity, server power capacity, aggregate IT capacity and MVA of server power, and no page retrieved on 24 November 2026 defines any of the four or states a conversion.
- Digital Realty files its 50% inside an APAC equity-method carrying amount of $707,368 thousand that also covers three other joint ventures; Mitsubishi files capital and voting percentages for named affiliates with no carrying amounts and prints approximately ¥250 billion of venture-level assets under management. No reviewed document prices a share against a megawatt.
The most precise capacity figure the operator publishes about itself is a projection. Its own release, dated 7 October 2026, says KIX15 is designed for 24 MW of server power capacity, that service starts in the fourth quarter of 2028, and that opening it will bring the Japan portfolio to ten buildings with total server power capacity of approximately 220 MW (MC Digital Realty). Digital Realty's release a day earlier says the same thing in a different unit: on completion the portfolio reaches ten data centres representing approximately 220 MW of aggregate IT capacity (Digital Realty). Neither release splits the total into operating, under construction and planned capacity, and neither carries an as-at date.
Four names for one quantity
The operator's own pages do not use one vocabulary. The KIX campus page prints KIX10 at 7.6 MW and KIX11 at 25.0 MW as IT電力容量, IT power capacity, and KIX12 at 20 MW and KIX13 at 21 MW as サーバー用電源容量, server power capacity (KIX campus). The NRT page prints NRT10 at 39 MW, NRT12 at 34 MW and NRT14 at 25 MW as server power capacity, and then states a campus plan of over 120 MW of IT capacity (NRT campus). The footprint page gives Mitaka South 13.5 MW and Mitaka North 7.5 MW as IT power capacity, plans the KIX campus at over 74 MW and the NRT campus at approximately 100 MW or more, and prints no portfolio total (data centres). A July 2024 interview with the operator's president adds a fourth vocabulary: 168 MVA of server power across eight domestic buildings, rising to 200 MVA across nine under the plan then announced (Weekly BCN). That interview prints no power factor, so no megawatt figure follows from it.
Four labels, one portfolio, and not one reviewed page says whether IT power capacity, server power capacity and aggregate IT capacity count the same thing. The differences are not academic. My own addition of the nine buildings the operator calls operating comes to 192.6 MW: 13.5 and 7.5 at Mitaka, 39, 34 and 25 at NRT, 7.6, 25.0, 20 and 21 at KIX. The KIX buildings alone sum to 73.6 MW against a printed campus plan of over 74 MW, and the NRT buildings sum to 98 MW against a printed plan of over 120 MW on one page and approximately 100 MW or more on another.
Add KIX15's 24 MW to my 192.6 and you get 216.6 MW; the projection says approximately 220 MW, which leaves 3.4 MW that could be rounding on a two-significant-figure approximation, additional planned capacity, or a different perimeter. No reviewed document says which, and I am not going to pick one for it.
The money, on two different perimeters
Digital Realty's Form 10-K for the year ended 31 December 2025 puts MC Digital Realty at 50% within APAC equity-method investments, with a carrying amount of $707,368 thousand at 31 December 2025 against $615,687 thousand a year earlier — a regional figure that also covers Digital Connexion at 33%, Digital Realty Bersama at 50% and Lumen at 50% (Note 7). The note explains the treatment: no controlling interest, because major decisions require unanimous consent, and Digital Realty generally serves as managing member while performing day-to-day accounting and property management. It prints no entity-level carrying amount and no Japanese megawatt anywhere in that note. Dividing the regional total by 50% to gross up a base produces $1,414,736 thousand that attributes four ventures to one holding, which is why I print the quotient and decline to use it.
The other owner's perimeter is thinner still. Mitsubishi Corporation's FY2025 securities report, submitted 12 June 2026, lists major equity-method affiliates by segment with address, capital and voting percentage and no carrying amounts. In the Social Infrastructure segment the retrieved text names three DRI entities at ¥6,372 million and 45.92%, ¥11,520 million and 51.00%, and ¥56,148 million and 49.04%, then closes with 「その他 90社」, ninety other companies (securities report). MC Digital Realty is not named in the retrieved pages. The extraction is OCR from a 253-page PDF, so that absence is a property of the pages read; if the joint venture sits inside the ninety, it still has no printed carrying amount. Mitsubishi's Q&A from 6 February 2026 is the one document that prints a money figure for the Japan business at all: eight data centre facilities in operation, with assets under management of approximately ¥250 billion (Q&A). That is a venture-level asset figure, not an investment carrying amount, not Mitsubishi's half of it, and it prints no megawatt.
One trap sits inside the same note and deserves naming, because it is the kind of thing a hurried reader merges: Digital Realty also has a Mitsubishi joint venture in the Dallas metro, now 20% Digital Realty and 80% Mitsubishi after a $62 million contribution on 31 January 2025. That is a different entity from the Japanese 50/50, and the note's own money-plus-megawatt joins — Digital Realty Bersama's approximately $94.7 million of acquired interest against up to approximately 32 MW of IT load — belong to other ventures.
What the filings do join: land, not capacity
Two filed sentences put a money amount and a megawatt in the same line for this company, and both are land purchases. The First Quarter 2023 supplement, filed as an 8-K exhibit, states that MC Digital Realty acquired a three-acre land parcel in Osaka which could support up to 24MW of IT load, for ¥950 million or $7 million (Q1 2023). The First Quarter 2024 supplement states that it closed on five acres in Osaka which could support development of up to 18 megawatts of IT load, for approximately JPY1 billion or $7 million (Q1 2024).
Divide those and you get the only money-per-megawatt figures in the filed record: roughly ¥40 million per megawatt of supportable load in 2023 and roughly ¥56 million in 2024, both mine, both land cost for development potential. They are not build cost, not the cost of the operating portfolio, and not a carrying amount per megawatt. The same 2024 supplement carries an IT Load (MW) column in its unconsolidated joint venture table, and the metro rows in the retrieved portion — Northern Virginia, Chicago, Silicon Valley, Toronto, Hong Kong, Paris, Los Angeles, Lagos, Abuja, Chennai, Dallas — include no Japan row.
The table is truncated in retrieval, so that is a fact about the rows read, and it is a striking one either way: the parent files an IT-load column for its unconsolidated ventures and this venture does not appear in it.
The 2017 launch release is the only document read that prints a money amount and megawatt figures in one sentence for the seed portfolio: Digital Realty's Saito facility in Osaka and Mitsubishi's Mitaka facility in Tokyo, jointly worth approximately ¥40 billion, with designed IT load of 13.5 MW, 7.5 MW and 7.6 MW (launch release). Twenty-eight point six megawatts against ¥40 billion is about ¥1.4 billion per designed megawatt, mine, on a formation-stage perimeter, and it is a ratio, not a valuation. The same release states initial capital of over ¥400 million; the company's current profile states ¥200 million (company profile). Both numbers are printed. Neither document explains the other, and I am not going to invent a reduction.
The document that would end the argument
The operator publishes per-building capacity, per-campus plans and a projected portfolio total, and does not publish the thing that would make them comparable: a capacity-basis note stating what a megawatt contains, which perimeter the total counts, and as at what date. The two owners publish money on perimeters that do not match each other or the capacity, and neither publishes the number that would let a reader divide one by the other. A reader weighing a lease here can buy the megawatt. A reader weighing the venture can buy a share of a carrying amount, a venture-level asset base or a capital line.
Nobody has priced the two against each other in a document I read on 24 November 2026, and the only filed money-per-megawatt prints in existence price dirt.
That is a specification gap with two named owners, not a misstatement by anyone. The absence is a count over thirteen documents retrieved on that date, and it would end the moment any one of them stated a carrying amount for the stake or a defined megawatt for the portfolio.
One more asymmetry is worth recording because it is dated and unexplained. The operator's company history dates KIX15's construction start to May 2026; Digital Realty's release announcing commencement of construction is dated 6 October 2026. Possibly groundbreaking against announcement. No reviewed document reconciles it, so both stand.
BTW published a longform on the KIX15 announcement on 23 October 2026, describing the 24 MW and the 2028 operation date with no customer, contract or project cost. This article asks a different question, one level above a single building, and does not use that piece as corroboration.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.