  • The second-quarter 2026 deck labels commitment rate as row 3 over row 1, pre-commitment rate as row 4 over row 2, and utilisation as row 5 over row 1; at 30 June 2026 all three recompute from printed areas to 92.4 per cent, 89.2 per cent and 79.2 per cent.
  • The same page prints MSR of RMB1,936 per square metre per month with no stated divisor; of the bases printed there, only the average of the 31 March and 30 June occupied areas reproduces it, while end-of-quarter occupied area and area in service do not.

The table tells you which rows it divided

Most operating tables ask the reader to trust a percentage. The market-summary table in GDS's 2Q26 earnings presentation, dated the same day as the results, prints the sum beside the number: total area committed is marked "(3 + 4)", commitment rate "3 / 1", pre-commitment rate "4 / 2", utilisation rate "5 / 1" (GDS 2Q26 earnings presentation). It is a small piece of typography with a large consequence, because a reader can now check every rate without knowing a definition.

Check them at 30 June 2026. Area in service, row 1: 684,977 sqm. Area under construction, row 2: 170,355 sqm. Area committed, row 3: 632,853 sqm. Area pre-committed, row 4: 151,948 sqm. Area utilized, row 5: 542,236 sqm. Then 632,853 divided by 684,977 is 92.39 per cent, printed as 92.4. And 151,948 divided by 170,355 is 89.19 per cent, printed as 89.2. And 542,236 divided by 684,977 is 79.16 per cent, printed as 79.2. All three divisions resolve to the decimal the company printed.

The row references also settle a question that the percentages alone would leave open. Commitment and utilisation divide by the same base, area in service: the first asks how much of the running floor is signed, the second how much is occupied. Pre-commitment divides by a different base, the floor still under construction, and asks how much of what is being built is already spoken for. So 89.2 per cent and 92.4 per cent are not two readings of one thing, and the row numbers say so before a reader has to guess.

One period further back, the deck prints 91.5 per cent, 74.7 per cent and 77.5 per cent for 2Q25 on the same labels, against 92.4, 89.2 and 79.2 now (GDS results release, 13 August 2026; the same release filed with the SEC). The pre-commitment rate has moved furthest of the three, from 74.7 to 89.2, across a year in which the floor under construction went from 132,235 sqm to 170,355 sqm. That is a rate rising on a base that itself grew by 28.8 per cent, which is the sort of movement a signed-but-unbuilt portfolio produces and a filled portfolio does not.

What RMB1,936 was divided by

Beside the KPI table sits a chart headed "Move-In & MSR By Quarter", with its axis labelled "MSR (Rmb / Sqm / Month)" and five values: 2,052 for 2Q25, 1,992 for 3Q25, 1,964 for 4Q25, 1,909 for 1Q26 and 1,936 for 2Q26 (GDS 2Q26 earnings presentation). On the pages read, the acronym is not expanded and no denominator is stated beside the series.

So test it. GDS prints service revenue of RMB3,086,667 thousand for the quarter, against total net revenue of RMB3,087,950 thousand, the last thousand-and-a-bit of which is equipment sales of RMB1,283 thousand (statement of operations; the highlights round total net revenue to RMB3,088.0 million in the release). Take that service revenue and put it over each base the deck prints for 30 June 2026, dividing by three for a monthly figure.

Over area in service, 684,977 sqm, it gives RMB4,506.2 per square metre for the quarter, or RMB1,502.1 a month. Over area utilized at the quarter-end, 542,236 sqm, it gives RMB5,692.5, or RMB1,897.5. Neither is 1,936. Over the average of the two printed occupied areas — 520,929 sqm at 31 March 2026 and 542,236 at 30 June, giving 531,582.5 sqm — it gives RMB5,806.6 for the quarter, or RMB1,935.5 a month. Against a printed RMB1,936 that is an agreement to within half a renminbi.

That arithmetic is mine, and one quarter of it proves less than a definition would. What it does establish is a shape: the printed MSR is consistent with service revenue per occupied square metre per month, averaged over the period, and it is not consistent with revenue per square metre in service, which is 28.9 per cent lower. The difference between those two denominators is not a rounding matter. It is the difference between asking what the estate earns per square metre it owns and what each occupied square metre pays.

The deck does not print the average occupied area the series appears to use. It prints two endpoints, five columns apart in one table, and a reader who wants the divisor has to build it. A publication that states its rates as row references and leaves its revenue per square metre as a figure to be reverse-engineered is not concealing a number; it is handing over the sum and withholding the instruction.

Three growth rates that point the same way

The printed changes are enough to say which way the per-square-metre figures moved, whichever base is used. Net revenue grew 6.5 per cent year over year. Area in service grew 10.8 per cent, to 684,977 sqm from 618,060. Area utilized grew 13.2 per cent, to 542,236 sqm. Put the revenue rate over either floor rate and the quotient falls: 3.9 per cent over the service base, 5.9 per cent over the occupied base. The printed MSR fell 5.65 per cent across its four-quarter run, from 2,052 to 1,936. Three measures, one direction, and no document read here decomposes the movement into price and mix.

Two square metres that go missing

The components do not always add to the printed totals. Area committed of 632,853 sqm plus area pre-committed of 151,948 sqm is 784,801 sqm against a printed total area committed of 784,802. Area in service of 684,977 plus area under construction of 170,355 is 855,332 against a printed total capacity of 855,331. Each residue is one square metre, in opposite directions, and each is the arithmetic of separately rounded components. The same identities close exactly in 2Q25, 3Q25 and 4Q25 for total capacity, and in 2Q25, 4Q25 and 1Q26 for total committed, so the residue reads as rounding rather than as a line the table forgot to print (GDS 2Q26 earnings presentation).

The last complete picture before the next one

The figures above are the quarter ended 30 June 2026, published on 13 August 2026. At the time of reading, the company's quarterly-results library still listed 2026 Q2 as its most recent package (GDS quarterly results library), and the third-quarter numbers were scheduled for 25 November 2026, after the Hong Kong close and before the U.S. open (results-date release, 11 November 2026; Form 6-K, 12 November 2026). The Hong Kong notice puts the board meeting that approved those unaudited results on 23 November 2026 (HKEXnews, date of board meeting). So the table examined here is the last complete operating picture before a fresh one lands, and the next release is the first clean test of whether the MSR series acquires a stated base.

Two companies behind one card

One entity note, because the numbers and the name on our directory card are not the same company. The figures belong to GDS Holdings Limited, incorporated in the Cayman Islands, listed on Nasdaq as GDS and on the Hong Kong exchange as 9698, filing with the SEC as a foreign private issuer on Form 20-F and reporting interim results through Form 6-K under Commission File Number 001-37925 (Form 6-K, 12 November 2026). Our card is GDS (Hong Kong) Limited, an APNIC public member record with a small-member tier and Hong Kong jurisdiction, and that card states plainly that it records a number-resource footprint rather than proof of what the company sells. No document read for this piece states whether the card holder is a subsidiary of the listed group, or which legal entity holds which data centre, so neither is asserted here.

What the deck lets you audit, and what it makes you build

The deck gives a reader three rates with receipts and one revenue figure without a denominator. That is the finding, and it survives the obvious objection: the missing denominator is recoverable, because the same table prints five quarters of occupied area and five quarters of MSR side by side. The recovery is the catch. A reader who checks the rates needs only the row above. A reader who wants to know what an occupied square metre earns a month has to notice that the series is not divided by the floor at the end of the quarter, run the divisions, and label the result as theirs.