Skip to main content

Topic

Wholesale Access Economics

Within the Topic facet, Wholesale Access Economics topic intelligence connects articles that share a specific subject, signal focus, or monitoring theme. The page gives readers a richer path through related reporting, source evidence, market actors, and infrastructure implications, with enough context to understand why the topic matters across company movements, governance decisions, regional exposure, and operational risk. Readers can compare recurring signals, affected organisations, public evidence, market context, service continuity, procurement, competition, compliance, and strategic planning questions behind the subject instead of stopping at a thin list of matching articles. It explains what the topic covers, which infrastructure actors or policies are involved, what evidence supports the coverage, and why the subject may matter for operators, customers, investors, and policy readers.

A continuous duct and cable corridor running across a sharp dividing line, one side lit in teal and the other in slate grey, with no text or numerals.

Europe and Middle East National Telecom

Telefonica de Espana: public remedy, unreadable access price

Spain's competition and telecom regulator keeps a public file on the wholesale market where rivals buy the use of an incumbent's network. The file, the regulator's press page and the operator's own results page were all retrieved. None of them yielded a price, a volume or a…

Oct 18, 2026
Wide panoramic editorial illustration: one shared wholesale broadband capacity pipe runs from a plainly engineered wholesaler building on the left, past three small retail kiosks, to terraced houses with amber-lit windows on the right; a circular brass gauge with a blank tick-marked face hangs mid-transfer in an overhead carrying frame, while a bare circular recess sits empty in the retail control cabinet behind it.

Asia-Pacific National Telecom

NBN Co is closing the capacity dial its retailers spent a decade turning

For years the wholesale tariff priced two different things: a monthly charge per service and a separate charge per megabit of busy-hour capacity. The record available to this desk on 18 October 2026 says the second is being folded into the first. That is reported rather than…

Oct 18, 2026
An aerial dusk view of a submarine cable landing station on a tropical coast, where a single armoured cable rises from the surf into a low grey equipment building, while inland a narrow road lined with transmission pylons carries a bright band of light toward a distant land border.

Asia-Pacific National Telecom

The Overland Majority: What Bangladesh's Submarine Capacity Numbers Do Not Measure

On 18 October 2026 the operator's own September figures put roughly 7.2 Tbps of submarine capacity at its disposal and roughly 3.2 Tbps of that unsold, while the last measured national split, dated March, put its two cable systems at about 4.2 Tbps combined against consumption…

Oct 18, 2026
An unmarked data-centre building at dusk beside a high-voltage substation and pylons, with a buried conduit route running along the perimeter fence toward a distant treeline.

Latin America and Caribbean Datacenter

Ascenty: The Megawatt That Travels Without Its Basis

Brazil's data-centre buildout is routinely described in megawatts, but the documents gathered for this report on 18 October 2026 contain no megawatt figure for Ascenty Data Centers e Telecomunicações S/A at all — and that gap is the story, because the unit itself is doing work…

Oct 18, 2026
Conceptual city-street cross-section showing an underground fibre conduit linked to a continuing chain of access agreements and a relocation worksite.

North America National Telecom Trends

Ottawa’s 2008 access agreement kept relocation costs with Videotron

A 2008 municipal access agreement continued to govern Ottawa transmission equipment after a chain of corporate transfers brought it under Videotron. The CRTC’s decision shows why ownership records and right-of-way contracts need to travel together through an acquisition.

Oct 18, 2026
Editorial illustration of a mobile-number portability hub between a host carrier’s radio towers and a full MVNO’s core network, with regulator and consortium panels.

North America National Telecom Trends

Canada opens wireless number-porting systems to full MVNOs

The CRTC has let registered full mobile virtual network operators port numbers through the shared system directly. Its ruling separates that right from ownership of the radio network and leaves the consortium responsible for the rule changes that make access workable.

Oct 18, 2026
Conceptual illustration of passive fibre from a Morocco point of mutualisation branching to one home and a mobile antenna, with an unconnected gap between service areas.

Africa National Telecom Trends

Morocco’s first non-licensee FTTH offer sets terms, not coverage

Morocco’s regulator has approved a passive fibre access offer from Uni Fiber, a joint venture outside the licensed operators themselves. The decision makes the reach of access rules more important than the label on the network owner: it governs infrastructure Uni Fiber…

Oct 18, 2026
Canada let mobile challengers sell first. Now it wants to see the build.

North America National Telecom Trends

Canada let mobile challengers sell first. Now it wants to see the build.

Freedom Mobile offered Manitobans a new provider before announcing plans for its own local network. Canada now wants to know how far its mobile challengers have travelled from selling service to building the infrastructure behind it.

Oct 18, 2026
AI illustration of a green utility cabinet and black conduits overlooking fields, rural homes and distant water.

North America National Telecom Trends

SWIFT built the fibre. Who gets to sell a service over it?

Thousands of interconnection points and a public stake in the infrastructure sound like a recipe for competition. A Canadian ruling shows why the ingredients still need putting together.

Oct 17, 2026
AI illustration of lattice telecom towers on a dark ridge at dusk, with four bright rectangular panels beside the nearest tower.

CASE FILE

China Tower has new customers. Its profits still owe a debt to old towers

Delivery riders and forest-monitoring services are expanding the tower owner's business. But a jump in profit owes much to a quieter change: old assets reaching the end of their depreciation.

Oct 17, 2026
An unmarked router on a sunny kitchen counter, with three houses visible beyond the window.

North America Regional ISP Trends

EarthLink can reach the house. Winning the customer is another job.

The broadband company's acquisition announcement puts 68 million reachable homes beside more than 500,000 customers. A network partnership in Florida helps explain why those numbers tell different stories.

Oct 17, 2026
Two wooden trays hold red-and-blue blocks; four ochre spheres sit in the left tray. Model houses and a telecom cabinet stand behind.

Europe and Middle East National Telecom

Telecom Italia: the takeover ended, but the cash question did not

TIM's chief executive joined the takeover offer as a shareholder too. But this was not a simple cash exit: part of the price was a stake in the buyer. Behind that exchange sits a business whose network, debts and cash receipts have already changed profoundly.

Oct 17, 2026
Paper ribbons cross a layered blue sea from a cream building toward two miniature cities.

Asia-Pacific National Telecom

Bangladesh's bandwidth has a direction, not just a total

BSCPLC's own annual report describes busy capacity towards Singapore and spare holdings farther west. That distinction changes how Bangladesh's submarine-cable numbers should be read.

Oct 17, 2026
A hand holds a small blank card above a handset at a workbench; network equipment and a meeting table stand behind it.

Africa National Telecom Trends

Nigeria's MVNO draft puts a clock on the deal, not the first call

A proposed 120-day deadline would limit how long a host can take to conclude an agreement. The argument at Nigeria's public inquiry was also about what the host must agree to—and which costs come out before revenue is shared.

Oct 17, 2026
A miniature telecom mast stands on a workbench beside separate panels, metal sections and fasteners.

North America National Telecom Trends

Canada's mobile-network test starts with an old tower

A new antenna on a shared mast counts as expansion in the CRTC's latest inquiry. The harder question is whether temporary access to a rival's network is helping regional carriers build something that lasts.

Oct 17, 2026
Волоконные каналы идут от улицы небольшого города к шкафу доступа у дороги.

Europe and Middle East National Telecom Trends

State Aid Builds Fibre. Wholesale Access Still Has to Work.

Public funding can build fibre networks, but a formal wholesale-access obligation does not guarantee that competing providers can order, receive and use a suitable input. BEREC’s draft report examines the distinction between required products and practical access, against a…

Oct 17, 2026
A 1990s Honduran telecom operations room with routers, servers and distinct paths for leased circuits and dial-up users.

History

Honduras Opened Internet Service to ISPs, but Kept Leased-Line Sales

Hondutel said five internet service providers and four organisations were directly connected in March 1996. A year later, one provider said private firms could sell dial-up but not dedicated service—an opening shaped by who controlled the circuit.

Oct 17, 2026
Редакционная иллюстрация коммутатора мобильного ядра, символа телефонного номера и отдельных радиосайтов.

North America National Telecom Trends

Canada lets full MVNOs move numbers without their host carrier

Canada’s wireless-porting rules long treated a mobile virtual network operator as a reseller whose host carrier had to move the customer’s number. A new CRTC decision recognizes that a full MVNO may run the mobile core switch where porting happens, even while another company…

Oct 17, 2026
Conceptual telephone-number transfer between unbranded network exchanges, with account ledgers and a two-business-day notice cue.

North America National Telecom Trends

Canada’s porting rule closes the gap after a number moves

A telephone number can move to a new provider before the old reseller’s billing and routing records catch up. Canada’s latest rule shortens that notification lag, while leaving a harder question—who may verify a residential customer when the upstream carrier’s database names the…

Oct 16, 2026
Сетевой оператор 1990-х работает рядом с оборудованием телефонного доступа; за окном видна спутниковая антенна.

History

Public Dial-Up, UUNET by Satellite: Gulfnet Kuwait, 1994–97

Three messages from Gulfnet’s director trace two access layers: a satellite connection reported in 1994, public UNIX dial-up in 1995, and a 1997 account of satellite backhaul to UUNET/AlterNet beside domestic modem access. These are operator snapshots, not proof of a continuous…

Oct 16, 2026