Skip to main content

North America Datacenter Trends

North America Datacenter Trends

Datacenter trend intelligence tracks data centre market trends, AI-driven capacity demand, power availability, colocation growth, interconnection strategy, and regional campus investment in North America, giving readers a fuller view of the demand shifts, capacity constraints, platform strategies, capital timing, regulatory pressure, and operating assumptions behind the market.

North America Datacenter Trends signal visual
North America Datacenter TrendsNorth America Datacenter Trends

Latest Coverage

Latest from North America Datacenter Trends

369 articles

Editorial still life: a wall of identical grey archive storage boxes and steel shelving on the left, a data-centre cold aisle of closed black cabinets on the right, and on a raw concrete plinth between them a machined brass and steel measuring scale with four uneven horizontal notches.

North America Datacenter

Iron Mountain Prices Its Debt With One Ratio and Tests It With Another

A credit agreement, an amendment and a bond indenture each answer the question 'how levered is this borrower?' — and the readable text prints the pricing ladder, the covenant's inputs and the dividend condition as three separate instruments. One runs the price. One runs the…

Nov 21, 2026
An unfinished data-centre hall with empty, plastic-wrapped server racks and a live electricity meter already turning on the wall

North America Datacenter

Digital Realty Sold the Space. The Rent Arrives in 2027.

Digital Realty's third quarter prints two dates against the same square metre: the day a lease was signed and the day the rent starts. Across the quarter's new signings those two dates sat 17 months apart, and the company now publishes a schedule that puts every dollar of that…

Nov 20, 2026
An empty concrete plant room with a wide ungraduated steel measuring bar bolted across the far wall and a single blank brass nameplate holder beneath it, with no plate fitted.

North America Datacenter Trends

PJM gave the data centre a name. The number was already fixed.

On 9 October 2026 the US Federal Energy Regulatory Commission accepted PJM's register of large loads and refused every instrument that would have let those loads leave, or shrink, the capacity obligation they feed. The quantity they pay on had been posted more than a year earlier…

Nov 18, 2026
A cast-steel laboratory metering bench: a chart recorder printing only a shaded grey band between brass end-stops, beside a geared brass converter whose 50 per cent dial drives a graduated output dial carrying no unit letters, above two brass plates both stamped 2014 with different numerals and an open empty drawer.

North America Datacenter Trends

The 74–132 GW data-centre band is a division, not a measurement

Lawrence Berkeley National Laboratory prints 176 TWh for 2023 and a 325–580 TWh envelope for 2028. The gigawatt figure beside it is that envelope divided by 4,380 assumed full-load hours — and the same edition carries two different baselines for 2014.

Nov 18, 2026
A heavy brass ratio meter on a dark steel bench: its lower counter drum is finely engraved with even graduations, while the upper drum is missing entirely, leaving a clean rectangular void with two empty bearing blocks, under a printed percentage scale whose needle rests just below ninety-five.

North America Datacenter Trends

Constellation's 94.7% Capacity Factor Has No Printed Numerator

A commentary page dated only by its own address puts 22 gigawatts and a 94.7% capacity factor side by side for 2025 and never prints a megawatt-hour. BTW's record of the legal person carrying that name still says no operator is confirmed.

Nov 18, 2026
Two galvanised gate lanes set into a chain-link fence at a high-voltage equipment yard; the left lane stands open onto a bare concrete apron running toward a row of grey transformer cabinets, the right lane is held shut by a heavy chain and padlock, and a small unengraved brass plate is bolted to the nearer gatepost.

North America Datacenter Trends

The class that skips the allocation was issued on a borrowed deadline

ERCOT sorted its large-load queue into two working classes this autumn, and only one of them has to compete for transmission capacity. The class that does not compete holds 66.4 GW across 204 projects. The class that does holds 127.9 GW across 158. Neither class's selection…

Nov 17, 2026
Heavy galvanised steel access gate standing half open in a chain-link perimeter fence, with a small blank brass plate bolted to the gate post and a large grey power transformer in soft focus behind it.

North America Datacenter Trends

Seventy-Five Megawatts Is a Door, Not a Promise

Texas has attached one number to the phrase large load and left firmness undefined. The labels that sound firm are written in a different document, and the instruction to cut consumption arrives in three instruments of three different statuses.

Nov 13, 2026
Conceptual unoccupied data-centre corridor with blank lease papers and sealed equipment crates.

North America Datacenter Trends

WhiteFiber's Cloud Growth Came From a Cancellation Fee. Its Leases Kept Growing.

Cloud-services revenue edged up 0.4% in the third quarter. A $3.4 million customer termination fee did the lifting, while the company took on about $54.5 million of new data-centre lease assets and matching liabilities across its international expansion. The bill for space is…

Nov 13, 2026
A high-voltage transmission tower fully erected on a freshly gravelled substation pad, with a tied contract folio still sealed on a low steel table nearby and a surveyor's chain running from the tower footing to lie loose beside it.

North America Datacenter Trends

Dominion's Data-Centre Load Has a Start Date and No Megawatt Count

A Virginia utility has told its regulator exactly when the biggest new customers stop being a forecast. January 2027. What the same filing will not tell you is how many megawatts have actually signed.

Nov 13, 2026
A precision measurement bench: a quarter-arc cam with one index mark drives a toothed multiplier drum four times its arc, turning a threaded shaft against a fixed millimetre scale, while beside it a machined contract holder stands completely empty, clips gripping nothing.

North America Datacenter

HPE's Run-Rate Is a Quarter Times Four. Its Own Filing Says So.

HPE's favourite number has no term, no cancellation schedule and no committed life. It is one quarter multiplied by four, and the filing that defines it tells you not to combine it with revenue.

Nov 13, 2026
Cutaway of a data-centre hall with three measuring instruments mounted on the near wall, each on a different scale and joined by no cable

North America Datacenter

Core Scientific's backlog is measured in megawatts. The $24 billion lives in a press release.

Its September-quarter filing defines the measure behind “contracted backlog” as power committed under executed customer contracts: 1,120 MW leased against 485 MW billable. The only dollar schedule of future customer receipts is an undiscounted lease-maturity table that leaves out…

Nov 13, 2026
Dense row of high-port-count data-centre Ethernet switches with hundreds of copper and optical cables converging toward racks of AI servers

North America Datacenter

Two of Arista's Three AI Numbers Cannot Fall

Arista says it will book at least $3.5 billion in AI fabrics revenue this year. Around that figure sit a customer tally that only goes up and a concentration disclosure delivered as a range. Read all three before you size anything against them.

Nov 12, 2026
A steel process flare burning at dusk on a gravel well pad, with two white containerised generator enclosures and gas piping running from a wellhead manifold beside it.

North America Datacenter

The Flare Argument Was Real. It Was Also Two Engines Wide.

Crusoe built a business on gas that would otherwise burn at the end of a flare boom. Permits in Montana, North Dakota and New Mexico describe exactly that equipment, site by site. Then the biggest campus filed for pipeline-quality gas — and the 220,000-tonne climate headline…

Nov 12, 2026
A single fibre patch lead runs from a switch port into a cable manager inside a dim Honolulu data-centre interconnection hall, with a blank equipment label frame out of focus in the foreground and a narrow band of pale sea-and-sky light at a high window.

North America Datacenter

Hawaii's Internet Exchange Registers One Port, and It Belongs to Somebody Else

Hawaii's Internet Exchange Registers One Port, and It Belongs to Somebody Else intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that may…

Nov 10, 2026
Conceptual substation beside bare ground with a translucent outline of a future data hall.

North America Datacenter Trends

Core Scientific Paid $444m for a Power Gate. The Data Hall Comes Later.

The Polaris purchase put an Oklahoma substation and rights to develop against up to 440 MW of gross utility capacity inside Core Scientific. Its balance sheet assigns more value to those rights than to the land and electrical plant combined. Getting paid for a new data hall is…

Nov 9, 2026
Conceptual vacant Ontario plot with a translucent outline of a proposed modular data-centre shell.

North America Datacenter Trends

PowerBank Has the Land for an AI Data Centre. It Still Needs a Customer.

An Ontario site lease gives PowerBank a place to build a small data centre. The advertised C$2 million annual rent sits on the other side of a tenant contract, permits, financing and a building that has yet to exist.

Nov 9, 2026
Isometric diagram of three unlabeled slab buildings on a dark field, joined by thin luminous fibre strands that converge on a ring of routing nodes hanging between them, tethered to all three but attached to none.

North America Datacenter

PIT-IX Reports Three Buildings. The Record Won't Say Which.

An internet exchange is a building problem in a routing costume. The Pittsburgh Internet Exchange now tells the world it runs across three facilities, counts thirty-six member networks and has imported forty-one networks from its IX-F feed — and it does not name one of the three.

Nov 4, 2026
Fictional household electricity bill and data-centre meter on opposite sides of a window, joined by a conceptual line of light.

North America Datacenter Trends

Dominion Wants Four Years of $10 Credits. Some Data Centres Would Lose Their Cut.

A merger can offer customers a large cheque and still leave the hard question in the small print: whose name comes off the list? Dominion and NextEra's revised Virginia offer would keep a $10 monthly residential bill credit running for four years by redirecting credits otherwise…

Nov 3, 2026
An invented unfinished data-centre hall with cable trays, switchgear, a substation and boxed equipment awaiting installation.

North America Datacenter Trends

Cipher Has $3.36bn in Unfinished Halls. Builders Still Have $1.61bn of Orders.

The data-centre pitch counts megawatts and future rent. Cipher Digital's September accounts count steel already under construction and another round of supplier obligations. The distance between those ledgers is where the cash risk lives.

Nov 3, 2026
Unbranded GPU racks, three blank acceptance cards, a copper clock and a separate guarantee emblem in a cold data-center hall.

North America Datacenter Trends

IREN’s GPU lender gets a 9% clock with every funded batch

IREN can borrow against accepted GPUs at Mackenzie. The lender takes first claim on the equipment, while the parent promises to pay if the borrowing subsidiary cannot. The gear arrives in batches; the debt does too.

Nov 3, 2026