Global Datacenter Trends
Global Datacenter Trends
Datacenter trend intelligence tracks data centre market trends, AI-driven capacity demand, power availability, colocation growth, interconnection strategy, and regional campus investment worldwide, giving readers a fuller view of the demand shifts, capacity constraints, platform strategies, capital timing, regulatory pressure, and operating assumptions behind the market.

Latest Coverage
Latest from Global Datacenter Trends
330 articles

Global Datacenter
Equinix's AFFO deducts $68 million of capex. The build is guided in billions.
Equinix's third-quarter AFFO reconciliation walks seventeen adjustment lines to reach $1,156 million, and exactly one of them subtracts money spent on assets: recurring capital expenditures of $68 million. The same release guides 2026 non-recurring capital expenditure at…

Global Datacenter Trends
Eaton Prints Its Backlog in Dollars and Its Data Centres in Adjectives
A data hall cannot take load without switchgear, busway and a power train somebody built. Eaton sells that gear, and it tells investors about the demand for it in four entities that do not convert into one another: a dollar stock called backlog, a dollar flow called segment net…

Global Datacenter Trends
Meta's Water Goal Is Written Per Watershed. The Tables Are Not.
Meta Platforms publishes three water quantities that mean three different things — water taken, water not returned, water returned somewhere else — and states its 2030 goal as the third divided by the second, in watersheds. The documents print the numerator as one portfolio total…

Global Datacenter Trends
Google's 100% Fits in a Year. Its 65% Fits in an Hour. Only One of Them Ships With a Receipt.
The same company, the same accounting year, two clean-electricity percentages 35 points apart — and neither one is a mistake. One is a purchase match summed over twelve months. The other is an hourly, grid-by-grid share whose weights I could not find printed anywhere in the…

Global Datacenter Trends
Vertiv's book-to-bill went out at 2.9x, and the orders series with it
On 11 February 2026 Vertiv furnished a quarterly exhibit that printed a book-to-bill ratio of about 2.9x and a backlog of $15.0 billion, up 109%. On the same day's earnings call, management said it would stop reporting actual orders, orders forecast and backlog with quarterly…

Global Datacenter Trends
Three Cabinets, One Word, and a Number Nobody Can Recompute
Equinix sells cabinet space, the power that runs it and the cross-connects that hang off it, and it reports one revenue figure per cabinet. The number is not the problem. The word underneath it is: inside the same company's paperwork, 'cabinet' names three different quantities…

Global Datacenter Trends
Alphabet Backs $48bn of Data-Centre Payments. On Default, It Can Take the Lease.
Third-party operators build the halls; Alphabet carries part of the credit tail. Its September filing describes a backstop that reaches beyond a payment promise: if an underlying party defaults, Alphabet may step into the lease and use or sublet the facility.

Global Datacenter Trends
Bloom Promised Suppliers $5.8 Billion. Its Customer Schedule Has Another Clock.
Bloom Energy can lock in components faster than a customer can install a power system. Its September filing puts a large, dated number on the first clock. The second runs through deposits, project milestones, acceptance and a revenue base concentrated in two buyers.

Global Datacenter Trends
Equinix Has a $2.4bn Purchase Bill. Some Power Contracts Escape the Total.
The data-centre operator counted about $2.4 billion of non-capital purchase commitments, including power and other orders. Its SEC filing also describes multi-year power deals whose future spend cannot be put in the schedule because prices vary or volumes lack a minimum. The…

Global Datacenter Trends
Vertiv Bought the Switchboard for $1.45bn. The Faster-Power Claim Still Needs a Site.
Vertiv has completed its purchase of UtilityInnovation Group, moving from equipment around a data centre's power problem toward the controls that decide how onsite supply, storage and the grid work together. The cheque has cleared. The promised shorter wait for electricity has…

Global Datacenter Trends
Marvell’s $115bn Laser Deal Puts $3.2bn Behind the Regulator Gate
Marvell has agreed to buy Lumentum in shares, with an announced enterprise value of about $115bn. The merger agreement says who pays if a better offer pulls either company away, and when a regulator alone can leave Marvell owing $3.2bn. It also draws a line around the concessions…

Global Datacenter
Iron Mountain Booked $263m of Data-Centre Revenue. Growth Investment Reached $472m.
The former document-storage specialist has a fast-growing data-centre business and an even faster construction bill. Its June filings show who has to bridge the time between signing a megawatt and collecting its rent.

Global Datacenter Trends
Equinix Has $6.4 Billion of Construction Work on Order. Most of the Bill Comes Soon.
The new cabinets have a delivery date before they have revenue. Equinix's latest filing puts roughly $6.4 billion of contracted, unaccrued capital work in that gap, with most payments due within twelve months. The construction calendar now matters as much as the bookings chart.

Global Datacenter Trends
Meta's Borrowed Shares Hit the Market. Its $24.9 Billion Waits.
Meta has arranged a financing package for an infrastructure bill measured in years. One part closed in October: mandatory convertible preferred shares with roughly $12.5 billion of expected net proceeds. In the other part, forward sellers borrowed and sold 40 million Meta shares.…

Global Datacenter Trends
Equinix gives you ten days to answer for the connection you asked it to remove
The removal request has gone in. Traffic is still flowing. Equinix has a procedure for asking the customer about that contradiction—and for processing the original order when the answer never arrives. Someone needs to own the saving after the purchase-order screen closes.

Global Datacenter Trends
Digital Realty signed record rent; the meter waits an average 17 months
Digital Realty says its third-quarter leases carry a record $855 million of annualized GAAP base rent at 100% share. The company’s own share is $627 million. For the new leases signed in the quarter, the weighted-average gap to contractual commencement was 17 months.

Global Datacenter Trends
Caterpillar’s 75% Power-Generation Surge Leaves a Data-Centre Hole in the Scorecard
Power Generation retail sales jumped 75% year on year in Q3; Caterpillar’s own external application sales rose 30%. The business is turning data-centre demand into reported sales, but the company still gives no separate total for that end market.

Global Datacenter Trends
Equinix books the atNorth fee. The investment’s earnings run three months behind.
A closing can improve adjusted earnings before ownership supplies its slower report card. Investors should price the dealmaker’s reward separately from the asset’s return.

Global Datacenter Trends
Meta put $10.8 billion behind glass. The data-centre contracts run to 2030.
A cash-rich balance sheet can still have locked drawers. Meta moved $10.8 billion into infrastructure escrow, with release expected years after this quarter’s spending.

Global Datacenter Trends
GE Vernova has 122 GW in the queue. Five GW left the factory.
The gas-turbine pipeline grew, but its stages moved at different speeds: 8 GW of new reservations, 13 GW promoted to orders and 5 GW shipped. The gap is the manufacturing job ahead.
