Skip to main content

Market / Companies

Companies

Company intelligence maps internet infrastructure operators, cloud service providers, telecom networks, data centre companies, registries, alliances, standards bodies, and institutional market actors across global internet infrastructure markets.

GlobalNorth AmericaEurope and Middle EastAsia-PacificLatin America and CaribbeanAfrica
Companies signal visual
Market / CompaniesCompanies
StructureTaxonomy Hub

Company listings are organized to preserve sector-level browsing and profile lookup.

RegionsCross-Market Operators

Company coverage maps execution patterns across multiple infrastructure contexts.

TypesSector-led View

Cloud, telecom, datacenter, institutional, and operator profiles remain the core structure.

ProfilesCompany Profiles

Company profile pages identify the organisation, operating footprint, evidence, customer dependency, and market relevance; company-related event coverage remains separate.

Latest Coverage

Latest from Companies

4,813 articles

A wide view of a dense field of steel lattice and monopole telecom towers on a flat plain under soft overcast light.

Asia-Pacific National Telecom

Indus Towers: Control Is Settled, the Cash Is Not

Vodafone Group is out, Bharti Airtel holds about 51%, and shareholders have approved a Rs 14 dividend. But the economics of India's listed tower operator still run through a credit-stressed tenant's payment behaviour, and the accounts show where the mechanism can break.

Sep 25, 2026
Illustrative digital painting of a low, windowless concrete cable-landing blockhouse on pale Mediterranean limestone, with two dark cable conduits crossing a plain stone apron into the sea and a flat, featureless coastal plain receding behind it into late-afternoon haze.

Africa National Telecom

Libya's self-declared gateway operator does not appear in the measured record of the country's 2025 shutdown

The Libyan International Telecommunication Company presents itself as Libya's single international gateway. The independent measurement of 16 May 2025 names four Libyan access networks — none of them the gateway, and one of them under a name that matches no corporate identity the…

Sep 25, 2026
Interior of a modern colocation data hall: a row of sealed black server cabinets recedes down an aisle beside a glazed partition onto an electrical switchgear room, with overhead cable trays and a transformer section topped with insulator bushings visible through the glass.

Global Datacenter

Iron Mountain Data Centers: how 452 megawatts become $204 million a quarter — and where the chain stalls

A listed REIT's data-centre arm reports $204 million of quarterly revenue from a portfolio that is 97% leased, with 203 MW under construction and 685 MW still held for development. The interesting question is not the growth rate. It is what has to happen, in sequence, before an…

Sep 25, 2026
Stylised editorial illustration of a dense Indian metropolitan skyline at dusk, with lattice telecom tower structures above the rooftops and a thin arc of abstract spectrum bands; in the lower third, stepped bar forms descend from right to left beneath a single amber accent against a deep indigo and steel-grey palette.

Asia-Pacific National Telecom

Airtel's FY26: record operating cash flow, a 34% cut in net debt, and a mobile core that barely grew

Bharti Airtel's financial year to March 2026 reads less as a growth story than as a balance-sheet one. Consolidated revenue reached Rs 210,973 crore, up 22.0% year on year, and EBITDA Rs 121,268 crore at a 57.5% margin, 300 basis points higher ([Q4 FY26 press…

Sep 25, 2026
Editorial photograph of a small post office branch counter at daybreak: a worn laminate counter with a plain metal service bell and a wire basket holding parcels wrapped in blank brown kraft paper tied with twine, hanging bare bulbs above, a shuttered ochre-painted steel teller grille and wooden sorting shelving behind, in muted grey and ochre tones.

Africa Institutional

South African Post Office: the rescue is ending, the statutory bill is not

On 12 June 2026 the Post Office's business rescue practitioners asked the Pretoria High Court to terminate the rescue, reporting a balance sheet returned to a positive R840 million and a loss cut from R514 million to R71 million. No order had been granted by 17 August 2026, the…

Sep 25, 2026
Blue-hour aerial view of a hyperscale data-centre campus: two flat-roofed server halls carrying neat parallel rows of cooling units, with a line of high-voltage transmission pylons receding towards a low horizon under an even dusk sky

Global Cloud Services

Oracle's $664 Billion Backlog and the 1.2 Gigawatts Behind It

Oracle ended its first fiscal quarter of 2027 with $664 billion of remaining performance obligations and $7.4 billion of quarterly cloud infrastructure revenue. Between those two figures sits everything that must still be built, powered, handed over and accepted before contracted…

Sep 25, 2026
A wide dusk view over a dense Indian metropolis from a high vantage point: near rooftops in deep shadow, midground concrete apartment blocks and mid-rise towers softening into warm haze, and a broad sky graded from amber at the horizon to deep blue above; scattered lit windows, small rooftop water tanks and two or three faint distant masts appear only as tiny unreadable silhouettes.

Asia-Pacific National Telecom

Vodafone Idea: The Orders Are Placed; the Towers Are Not Yet Standing

India's third-largest mobile operator has spent two years converting a payment calendar into time. The June 2026 quarter shows what the borrowed time has bought so far: ₹9,000 crore of equipment ordered, ₹1,930 crore of capital deployed, and a ₹35,000 crore bank facility still…

Sep 25, 2026
Rows of densely packed GPU server racks in a darkened hyperscale data-centre aisle, with cabling rising above the racks toward a brightly lit far wall; one foreground rack door is closed and unlit.

Global Cloud Services

Oracle Cloud's 131,072-GPU cluster is a fabric specification, not a schedulable size

Oracle's zettascale cluster network is documented as a three-tier Clos topology that can address 131,072 GPUs, but the company's own operational documentation caps provisioning at the host capacity actually present in the RDMA network. The gap between those two statements is…

Sep 25, 2026
Abstract editorial illustration of a publicly co-funded AI research institute's transfer path: a low grey institutional building on the left linked by glowing conduits to small anonymous product silhouettes — a document, a car dashboard with a voice waveform, a ledger panel — with three separate thin ledger bands running behind the conduits.

Europe and Middle East Institutional

DFKI's Two Budgets: Testing a Public-Private AI Institute's Claim to Transfer

The German Research Center for Artificial Intelligence is usually introduced as Germany's largest AI research institute and as a non-profit public-private partnership. Both labels imply a mechanism: that public money and industrial money together push research out of the…

Sep 25, 2026
A tall lattice telecommunications tower carrying several layers of mobile antennas and microwave dishes rises over a dry African landscape at dusk, with two further towers visible on low ridges in the middle distance.

Africa National Telecom

Helios Towers: tenancy growth, a US$5.9bn backlog and the cash that arrived least

Helios Towers' H1 2026 report shows an operator winning the tenancy race and losing the cash-conversion race, and the gap between the two is where the investment case now lives. Tenancies rose 13%, revenue 11% and adjusted EBITDA 14%; cash generated from operations fell 16% and…

Sep 25, 2026
Full-bleed documentary view down a data-centre ground-floor energy room: a long bank of heavy industrial batteries in open steel racks linked by bare copper busbars and bolted terminals with cabling falling into floor cable trays, and two closed louvred uninterruptible-power-supply inverter cabinets, under a bare concrete ceiling carrying one small round smoke-detector disc and no suppression pipework or light fittings.

Europe and Middle East Cloud Services

OVHcloud's Strasbourg fire: the detection worked, the redundancy did not

At 00:35 on 10 March 2021 an alarm sounded in the security room of OVHcloud's Strasbourg campus. Two minutes later a guard reached the ground-floor energy room of building SBG2 and found thick black smoke. The building was evacuated at 00:39 and the fire service was called at…

Sep 25, 2026
A restrained screenprint-style editorial illustration of a hyperscale data-centre campus: three low windowless data-hall blocks on a flat plain, an on-site substation with transformer banks and lattice steel, and high-voltage transmission towers stepping back toward a low horizon with catenary cables between them.

North America Institutional

JPMorgan's AI data-center book: what is funded, what is only committed

A bank can announce a role, originate a loan, commit a facility and reserve against an undrawn line. Those are four different facts with four different numbers. JPMorgan Chase's public record on AI data-center finance contains all four, and collapsing them into a single exposure…

Sep 25, 2026
A single modern macro-cell mast on a flat concrete rooftop at dusk in a large Indian city, with three panel antennas around the top of a slim steel pole, neat parallel feeder cables running down into a closed grey equipment cabinet, a galvanised support frame beside it, and a hazy low-rise skyline with distant rooftop masts silhouetted behind.

Asia-Pacific National Telecom

Vodafone Idea: The Bill Was Rewritten; the Bank's Signature Has Not Arrived

The Indian state has rescheduled most of what Vodafone Idea owes it to the 2030s and written the rest down. The Rs 35,000 crore bank facility meant to pay for the network is still a sanction in prospect, not money in the account. The operating numbers have only just stopped…

Sep 25, 2026
Dark network racks and a firewall appliance at a regional telecom exchange, with a single amber emergency-call signal path severed at a closed gateway while a ghost line continues, and unattended red alarm indicators beside green status lights.

Asia-Pacific National Telecom

Optus: two planned changes, one failure path

In November 2023 a scheduled software upgrade on an international peering network preceded the collapse of a national carrier's core. Twenty-one months later, a routine overnight firewall upgrade at a single exchange blocked emergency calls for more than fourteen hours. The…

Sep 25, 2026
A half-finished hyperscale data-centre hall seen from an elevated service catwalk: lit, fully populated server racks at right, bare steel frames and empty cable trays at left, unmarked plywood crates on pallets, wall-mounted digital electricity meters with conduit runs, and cooling pipework overhead in a fully enclosed interior.

Global Cloud Services

Who pays for Oracle's AI build-out: $11.4 billion of customer prepayments against $260 billion of leases

Oracle's $664 billion backlog is not one funding story but several stacked on top of each other: money customers have already paid, hardware customers have bought themselves, leases Oracle has signed but not yet commenced, and debt it has already raised. Reading the quarter means…

Sep 25, 2026
Dusk view of a dense rooftop telecommunications antenna installation in a tropical Southeast Asian city, with several masts, panel antennas and small microwave drums in sharp foreground detail against a blue-to-amber sky and a hazy skyline.

Asia-Pacific National Telecom

Axiata grew more valuable by owning less of what earns

Axiata Group Berhad reports its best leverage in years and a doubled dividend, but the two operators that now supply most of its upstream cash are one-third stakes shared with a co-controlling partner, and its 2023 Nepal exit still lacked host-regulator recognition in 2026.

Sep 24, 2026
A hyperscale data-centre hall with two long rows of GPU server racks receding toward a bright far wall, dense amber and cool-white indicator lights, overhead coolant manifolds and cable trays, and a single technician walking the central aisle seen from behind.

Global Cloud Services

Oracle's AI fleet: 97.9% utilisation, a 20% premium on four-year-old GPUs, and three 1 GW sites still dark

For a year, Oracle's AI infrastructure story has been told as a gap — the distance between the contracts the company has signed and the electricity it has switched on. Oracle's own operating numbers now support a sharper question. In the quarter it labels Q1 FY27, the company…

Sep 24, 2026
Aerial dusk view of an AI data-centre campus where one completed module is lit and powered beside dark, unpowered building shells and staked-out empty land, with transmission pylons leading to the horizon.

Global Cloud Services

Oracle Cloud's AI build-out: contracted backlog runs ahead of energised capacity

Oracle closed the first quarter of its 2027 fiscal year with $664 billion of remaining performance obligations on its books and a statement that it had delivered 850 megawatts of AI compute capacity to customers during the same three months. Read together, those two numbers…

Sep 24, 2026
Editorial photograph: a plain unmarked grey telecom cabinet against a blank concrete wall, with two slender cables running toward the foreground — one matte-black unlit fibre cable and one thin amber-lit fibre strand.

Europe and Middle East Regional ISP

Stadtwerke München tightens control of M-net as Munich fibre becomes a shared wholesale layer

Munich's municipal utility is reported to have moved from majority owner to dominant owner of its regional carrier M-net, in the same period in which that carrier, its municipal owner and Telekom Deutschland signed a mutual wholesale arrangement over Munich's fibre. The…

Sep 24, 2026
A golden-hour view of a lattice mobile telecom tower with tiers of sector antennas and a microwave dish, a low plain colonnaded government building with a bare flagpole, and a hazy Indian mid-rise cityscape behind them.

Asia-Pacific National Telecom

Vodafone Idea's Binding Constraint Is a Creditor That Is Also Its Largest Shareholder

The Indian state owns 48.99% of Vodafone Idea and is, at the same time, the company's largest creditor. With bank borrowings down to Rs 211 crore, the network the operator can actually build now depends on whether operating cash flow can carry an announced Rs 45,000 crore…

Sep 24, 2026

Taxonomy

Company Regions

Region

Global

Multi-region operators with cross-RIR strategic footprint.

Region

North America

ARIN-region member companies and infrastructure operators.

Region

Asia-Pacific

APNIC-region member companies and operators.

Region

Africa

AFRINIC-region member companies and operators.