Skip to main content

Europe and Middle East Datacenter

Europe and Middle East Datacenter

Datacenter company intelligence covers data centre operators, colocation platforms, hyperscale campus developers, interconnection providers, and digital infrastructure investors in Europe and the Middle East, with enough context for readers to understand how these organisations build, operate, finance, regulate, and sell the infrastructure that supports digital markets.

Europe and Middle East Datacenter signal visual
Europe and Middle East DatacenterEurope and Middle East Datacenter

Latest Coverage

Latest from Europe and Middle East Datacenter

60 articles

A printed capacity table lies out of focus on a steel workbench in front of a blurred data-centre colocation hall.

Europe and Middle East Datacenter

NTT's 1,510 megawatts and its ¥658.6bn do not describe the same buildings

Two footnotes printed by one company put different buildings inside the capacity figure and inside the revenue figure. The per-megawatt number a reader reaches for cannot be built from these pages, and the reason is printed rather than missing.

Nov 21, 2026
A dim internet-exchange network operations centre at night: a wall of faint green port-status tiles with one tile dark, and in the foreground a stopwatch stopped short of twelve beside a maintenance ledger with one time interval struck through.

Europe and Middle East Datacenter

Ninety-nine point nine nine, minus everything AMS-IX schedules

AMS-IX tells its members what its network operations centre is aiming at, in one sentence on its own quality page, and then stops. The sentence carries a number and a subject and no place to stand: nothing in it says where the 99.99% is measured or over what period it is…

Nov 21, 2026
A blank-faced server cabinet in a cool-lit data centre hall, with a single plain metal socket strip standing on bare concrete beside it and one black cable running up behind the cabinet. No labels, lettering, numerals or logos appear anywhere in the frame.

Europe and Middle East Datacenter

The Word Starts at 300 Kilowatts. The Operator Prints a Socket.

A German statute made "data centre" a word with a number inside it, and the number is one only the operator can supply. A town-owned hosting company in Lower Franconia publishes the socket in a rented cabinet and says nothing about the building behind it. That gap is the…

Nov 20, 2026
A stack of plain manila registry files and a brushed-steel asset plate on a dark desk, with a Warsaw-style office block and a lattice telecom mast visible through plate glass at blue hour.

Europe and Middle East Datacenter

The Towers Are in Towerlink. The AS Numbers Are in the Consultancy.

The Towers Are in Towerlink. The AS Numbers Are in the Consultancy. intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that may follow. The…

Nov 19, 2026
A heavy cast-iron weighbridge indicator on a steel pedestal, with two brass nameplates of different vintage riveted above one glass-covered dial face; a gloved hand rests on its crank, a smaller scale stands chained and tagged blank beside it, and a framed certificate with a red seal and an empty lower third hangs on the wall behind.

Europe and Middle East Datacenter

Equinix's 76% is a division, and the unit it divides by has two definitions

A cross connect, a cabinet and a megawatt walk into a data centre. Equinix defines the first with a cable, the second with floor space — twice, in two product documents, differently — and leaves the third, the one that actually constrains it, to a ratings agency underwriting a…

Nov 18, 2026
A grey switchgear cabinet with a small engraved nameplate reading 300 kW, an armoured cable looping from its base back into the same door, a blank circular dial with no scale, and a sealed hatch tagged 31.03.

Europe and Middle East Datacenter

Germany Wrote a Data-Centre Rule and Handed the Ruler to the Operator

EnEfG decides who is regulated from a nameplate figure nobody measures, grades the survivors against a standard it cites rather than prints, and accepts the operator's own meters and own annual filing as the public record.

Nov 18, 2026
Half-finished data-centre shell at dusk on a Dutch polder site: one half clad and sealed, the other bare steel frame and open floor slabs in scaffolding, with a wet service road and a blank delivery signboard in the foreground.

Europe and Middle East Datacenter

Amsterdam 6 Has a Registry Entry, a Postbus, and No Hall Yet

The Dutch company behind AMS6 appears in RIPE NCC's member list under its own legal name, with an Amsterdam PO box. On the operator's own site list, the hall that name points at is still under development.

Nov 18, 2026
Snow-covered Finnish data-centre hall beside a municipal heat-recovery plant, with insulated district-heating pipework entering the wall and a row of industrial heat pumps venting into the cold air

Europe and Middle East Datacenter

Mäntsälä Gets Its Datacenter Heat for Free. The Pumps Still Draw 10,100 MWh.

Nebius DC Oy can recover more than 250 GWh of server heat a year at its Finnish site and delivered 19,522 MWh in 2025. The bottleneck was never the racks. It is the town's pipes, the pumps that lift the temperature, and a supply contract nobody has published.

Nov 12, 2026
A lit interconnection hall with dense fibre patch panels in the foreground, and three separate low-rise buildings outside, each with its own cooling plant and duct entry, joined by faint luminous fibre routes.

Europe and Middle East Datacenter

Fifteen Buildings and a Cable You Have to Buy Yourself

AMS-IX is not one room, and its own engineers say so plainly. What its published record refuses to say is how many rooms it is, or which one of them keeps your traffic alive.

Nov 12, 2026
Two route-server racks joined by a dense patch-cable fabric, illustrating the physical layer behind an exchange's route-service output.

Europe and Middle East Datacenter

InterLAN-IX Refreshed Its Member List Two Minutes Ago. The Route-Server Trail Stops There.

A Bucharest internet exchange published a machine-readable record of 132 participating networks on 10 November 2026, stamped within two minutes of being read. Its own website says it hands partners two route servers. Neither page says which autonomous systems those route servers…

Nov 10, 2026
Editorial illustration of a data-centre service door carrying two conflicting name plates: an older 'e-shelter' label and the current 'NTT Global Data Centers EMEA GmbH' legal name.

Europe and Middle East Datacenter

The Register Still Files NTT's German Data-Centre Arm Under Its Predecessor's Name

NTT Global Data Centers EMEA GmbH carries NTT's European data-centre business as a legal person. The commercial register treats it as a company in its own right. The RIPE NCC member directory still reaches it through e-shelter. For anyone who has to attribute an operating…

Nov 9, 2026
Fibre patch cables converging from orange and blue bundles into a single rack of network switching equipment in a dim data-centre aisle.

Europe and Middle East Datacenter

InterLAN-IX charges the same port price in Bucharest, Frankfurt and Sofia. Who pays for the distance?

Romania's exchange told RIPE 93 that geography does not change the price of a port. The same talk explains what has to be true for that promise to hold: eleven sites stitched onto one Layer 2 fabric, redundant links the operator describes as expensive, and a transport bill that…

Nov 7, 2026
Two low-rise grey-clad data centre halls standing at the inland edge of the Westland polder beside long rows of glass greenhouses, with several separate dark fibre conduits converging across wet grass toward a single entry point; no substation or signage is visible.

Europe and Middle East Datacenter

Greenhouse Datacenters Publishes Its Interconnection Story and Leaves the Power Envelope Unstated

A Naaldwijk colocation operator has just been named an additional landing partner for the IOEMA subsea cable. Its public record is unusually detailed on connectivity partners, exchange count, certifications and a power usage ratio — and silent on the figure that decides how much…

Oct 18, 2026
A wide documentary view down a data-centre aisle with rows of carrier-grade network switches and densely patched cabling, lit port indicators visible on the faceplates, and a low city skyline visible through a window at dusk.

Europe and Middle East Datacenter

InterLAN-IX: one exchange, two sets of numbers

Romania's domestic peering fabric is operated by InterLAN Internet Exchange SRL, a Bucharest-headquartered company whose own published figures and the Romanian Network Operators Group's description of the same platform do not reconcile on members, locations or traffic. For an…

Oct 14, 2026
Abstract text-free editorial illustration: a plain white registration card with a ribbon seal and abstract grey placeholder bars beside a minimal network diagram of one hub node with three thin transit lines, set against a faint empty data-centre silhouette.

Europe and Middle East Datacenter

bit datacenters GmbH: A German Data-Centre Name That Outruns Its Registry Footprint

German commercial-register and routing records describe a young, small Gießen company whose branding implies capacity that no public source has yet evidenced.

Oct 6, 2026
Stylized illustration of a high-voltage underground grid route converging toward a data-centre campus with abstract network-routing lines and an exchange node symbol.

Europe and Middle East Datacenter

Mistral Compute's Other Layers: An AS With One Peering Port, and a Grid Line Still in the Ground

Previous BTW reporting on Mistral Compute sorted its megawatt ledgers, traced its $830 million debt structure and audited its execution evidence. Two layers remained largely untouched: how the cluster connects to the internet, and how it connects to the grid. Both now have dated…

Oct 4, 2026
Editorial infographic of a data center server hall in Bruyères-le-Châtel with two contrasting GPU rack groups: one illuminated representing financed capacity, one faint outline representing a superseded vendor claim.

Europe and Middle East Datacenter

Mistral Compute's Operational Claim, Audited: What the Fleet Numbers Actually Record

Mistral Compute's French infrastructure program has accumulated a layer of claims that outpace its dated evidence: a vendor blog calling an 18,000-GPU fleet "already operational," a registry that both energizes and does not energize the same site, and a product suite sold on the…

Oct 1, 2026
Editorial illustration of a modern data-centre hall at dusk: rows of grey server cabinets with small blue and amber indicator lights on a dark polished floor, and in the mid-ground an empty operator chair beside a bare desk holding a plain unmarked folder, with a wide window behind showing generic southern French hills and cypress silhouettes.

Europe and Middle East Datacenter

AZUR DATACENTER SAS: what a RIPE NCC membership listing actually proves

A French company named AZUR DATACENTER SAS appears in the RIPE NCC public member directory. That single record is the entire verified signal behind the company's presence in BTW's directory — and it is a narrower signal than its name suggests.

Sep 23, 2026
Conceptual illustration of datacenter blocks, an archival card marked OVH · STRASBOURG and 10.03.2021, an interrupted circular symbol and an emergency-response helmet.

Europe and Middle East Datacenter

OVH Strasbourg: electrical isolation was an emergency control of its own

The useful lesson from the 2021 fire is not a speculative ignition theory. It is a question about practical control: who can establish the electrical conditions needed for an emergency response, and what would demonstrate that later improvements actually work?

Sep 19, 2026
AI-generated editorial illustration of AWS data-centre disruption in Bahrain and the UAE, showing unrecoverable data and affected Availability Zones

Europe and Middle East Datacenter

AWS cannot restore data kept only in Bahrain

AWS says resources and data stored only in its Bahrain Region cannot be recovered, while one of three UAE Availability Zones is also beyond restoration.

Sep 18, 2026