Summary
- Global Switch's 2025 accounts print 488MVA of "utility power supply to the data centres" directly above 252MW of "saleable capacity", define neither term, and state no conversion between them: the saleable figure is 51.6 per cent of the supply figure.
- The portfolio square metre has left the annual report. The 2023 report printed 428,376 m² of gross space on its highlights panel; the 2025 and 2024 reports carry no portfolio area in the passages reviewed, and the space measure now survives only in the 2025 ESG report at 410,499 m² of gross floor area whose perimeter includes developments in progress.
- Of £466.2m of 2025 revenue, £139.3m is resold power and £280.5m is service fee income from investment properties, so money per printed megawatt is about £1.85m on total revenue against about £1.11m on service fees — a 1.66 times spread created entirely by the pass-through line.
Two electrical columns and no exchange rate
The key highlights panel for the year ended 31 December 2025 runs through revenue of £466.2m, EBITDA of £210.9m, an investment property valuation of £5.2bn, capital expenditure invested of £265.1m, net debt to EBITDA of 3.6 times and a weighted average cost of bond debt of 1.7 per cent. Then, on the last two lines, the portfolio: "488MVA Utility power supply to the data centres" and "252MW Saleable capacity" (https://www.globalswitch.com/wp-content/uploads/Global-Switch-Holdings-Limited-31-December-2025_-FINAL-Euronext.pdf).
The two terms are not synonyms, and the panel does not say how they relate. Megavolt-amperes measure apparent power at a supply point; megawatts measure real power. 252 over 488 is 51.6 per cent. If both described one electrical system that ratio would be a power factor of 0.52, which no engineer would accept for a modern estate. The plain reading is that the two numbers describe two boundaries: what the utility can deliver to the buildings, and what the landlord has to sell inside them. The 236 that separates them on the panel exists in their own units, not in a shared one, and the report never spends a sentence on it.
Neither term is defined in the passages reviewed. "Saleable capacity" surfaces in the capital expenditure narrative as "new saleable IT capacity across existing data centres", which says what it is for without saying what it measures. Counted at the customer's rack, at the hall's busbar, or before redundancy? A hall marketed as 10MW may need materially more than 10MW installed. On this evidence the reader cannot tell which number the sales team quotes.
The capital programme says the product is a density
Capital expenditure of £263.5m splits £33.5m into new development and £230.0m into redevelopment and densification, so 87.3 per cent of the programme went into buildings Global Switch already owned. The purpose is stated in the same report: creating "new saleable IT capacity across existing data centres". The growth model is more watts per existing square metre.
The 2023 report said the same thing in the units of the trade. It described London South adding 27,000 m² of technical space to take the London campus to 115,000 m² with 126MVA, tied a new Madrid data centre of 24,000 m² to 36MW of IT capacity, and discussed densification with densities expressed in watts per square metre (https://www.globalswitch.com/wp-content/uploads/2025/08/Global-Switch-Holdings-Limited-Annual-Report-and-Financial-Statements-for-the-year-ended-31-December-2023.pdf). Madrid works out at 1.5kW per m². London works out at about 1.10 kVA per m². Two densities, two perimeters, one document, and no group figure.
One residue is mine: the highlights panel prints £265.1m of capital expenditure while the narrative split sums to £263.5m, £1.6m apart. That is a limit of the two passages, not a reconciliation.
Where the square metre went
The 2023 highlights carried "428,376 Square metres of gross space" beside 503MVA, on a portfolio that still included Australia. Fitch's October 2024 note described the same year the same way: 13 data centres valued at about £6.1bn across eight tier-one locations, 428,000 m² of gross floor space, 503MVA of utility power capacity (https://www.fitchratings.com/research/corporate-finance/fitch-affirms-global-switch-at-bbb-outlook-stable-25-10-2024).
The 2024 report then printed 488MVA, booked £999.5m of net proceeds from the divestment of Australia, and carried no portfolio area in the passages reviewed (https://www.globalswitch.com/wp-content/uploads/2025/08/Global-Switch-Holdings-Limited-Annual-Report-and-Financial-Statements-for-the-year-ended-31-December-2024.pdf). The 2025 report printed 488MVA and 252MW and no portfolio area either. The archive that indexes all of it lists reports from 2019 through 2025 and gives no publication dates (https://www.globalswitch.com/annual-reports/).
The area survives in a separate document. The 2025 ESG report states 410,499 m² of gross floor area, existing plus developments and expansions in progress, across eight data centres in seven Tier-1 cities, and its eight campus figures sum exactly to that total (https://www.globalswitch.com/wp-content/uploads/2025-ESG-Report.pdf). That perimeter includes buildings not yet finished — among them the 7,500 m² AI-focused facility the 2024 report says is planned next to Singapore Tai Seng. So the space figure is drawn wider than the power figure, and no page reviewed says the two describe one estate on one date.
I make the group density 488MVA over 410,499 m², about 1.19 kVA per m²; the 2023 pair, 503MVA over 428,376 m², is about 1.17. Essentially unchanged across a disposal and two reporting years. That stability is the nearest thing to a reconciliation between two documents that never mention each other: whatever the perimeters are, the megavolt-ampere and the square metre move together in this portfolio. Revenue per square metre, £466.2m over 410,499 m², is about £1,136 — mine, taken across those two surfaces, and therefore an indicator rather than a rate anyone pays.
What the revenue is actually made of
Inside the £466.2m: service fee income from investment properties £280.5m, provision of power £139.3m, provision of additional services £46.4m. Power is accounted for gross, with supplied power costs in cost of sales. So 60.2 per cent of revenue is the rent line, 29.9 per cent is electricity the landlord buys and resells, and 10.0 per cent is services. By geography the split is Europe £268.1m, Asia-Pacific £196.0m and corporate £2.1m, with one customer at £59.6m, 12.8 per cent of the total.
Money per printed megawatt of saleable capacity is therefore two numbers, not one. Total revenue over 252MW is about £1.85m. Service fee income over 252MW is about £1.11m. The 1.66 times spread is created entirely by the power line, which is a pass-through and not a rent — a distinction the highlights panel does not draw and any unaided reader of 252MW will miss.
Growth is the same lever. Against the 2025 report's own comparatives, total revenue rose 6.8 per cent, power revenue rose 11.9 per cent from £124.5m, and everything that is not power rose 4.7 per cent. In 2024 the lever turned the other way: revenue fell 9.5 per cent to £436.6m and the report attributed it to lower power revenue on lower electricity unit prices. A landlord whose top line tracks the wholesale price of electricity is not a pure rent collector. It is partly a utility with a property portfolio attached.
Operating intensity, my arithmetic: 38.8MW signed in 2025 plus 33.7MW of renewals is 72.5MW, 28.8 per cent of the 252MW stock. The portfolio turns over roughly a quarter of itself a year in signature and renewal.
The one place the company prices power
The 2024 report prints EBITDA of £213.2m on revenue of £436.6m — a margin of 48.8 per cent — and then adds "or 70.4 per cent excluding power revenue". Those two figures can be made to meet. Revenue less the power line is £312.1m; 70.4 per cent of that is £219.7m, which is £6.5m more than the printed £213.2m. The only reading that closes both margins is that resold electricity cost about £131.0m against £124.5m of power revenue in 2024, an EBITDA loss of roughly £6.5m on the electricity business. That is my arithmetic on two printed margins and one printed revenue split; the report prints no power cost line in the passages read.
If it holds, the pass-through behind 29.9 per cent of 2025 revenue is a service the landlord absorbs rather than a profit centre — and money per megawatt over total revenue is measuring the wrong thing.
The same arithmetic on the 2025 supply figure gives power revenue of £139.3m over 488MVA, about £285,000 per MVA. That is not a price per megawatt and does not belong beside the £1.85m, because MVA and MW are two printed units that no reviewed page reconciles.
What no page prints
Not a rent per kW, per MVA, per square metre or per rack. Not a campus revenue table. Not an occupancy percentage with the area or capacity it is taken against — the 2025 report refers only, in qualitative terms, to an increase in "power occupancy". Not a definition of either capacity term. The independent valuation is the only price in the pack that is not a revenue line: CBRE valued the investment property at £5,224.1m, which is about £20.7m per MW of saleable capacity and about £12,700 per m² of gross floor area. Valuations, not rents, each on a different printed denominator, both mine.
One conflict is worth stating rather than smoothing. The 2025 report prints net assets of £3,850.6m and prints its own 2024 comparative as £3,790.5m, while the 2024 report printed £3,750.5m for that year. The £40.0m difference is attributed to the document that prints each figure and is not averaged.
The test, answered
Space: the ESG report. Power: the annual report highlights. Revenue for one site beside the space or power of that site: no page. Occupancy with its base: no page. A page that prices both space and power for one customer perimeter: no page. Whether the thing sold is the square metre or the kilowatt: no page says. The capital programme says it anyway — 87.3 per cent of 2025 capital expenditure went into fitting more watts into buildings already owned.
A tenant signs for kilowatts. The landlord is buying density. That makes 252MW the number to watch and the definition of the megawatt the number that decides it. Global Switch's directory entry is here: https://btw.media/en/directory/global-switch.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.