Summary

  • GDS's 2Q26 highlights page prints four area figures with a megawatt figure after each of them: 784,802 sqm (or 2,047 MW), 542,236 sqm (or 1,289 MW), 59,317 sqm (or 254 MW) and 21,307 sqm (or 92 MW). Divided out, they give 2.6083, 2.3772, 4.2821 and 4.3178 kilowatts per square metre. Every one of those four quotients is my arithmetic; the company prints both operands and never the result.
  • The only density printed anywhere in the eight documents I read on 25 November 2026 is an average of approximately 2.2 kW/sqm, which the annual report scopes to self-developed capacity in service and under construction. Multiplied by 684,977 sqm it gives 1,506,949 kW, 51 kW short of the 1,507 MW of committed in-service power in the deck's own table — and that pair appears in the deck as two separate numbers, never as a ratio.
  • The annual report defines the square metre four times over in its conventions glossary. No definition of a megawatt capacity metric appears in the conventions text I read. The closest thing to one is spoken on the earnings call, where the booking megawatt is described as carrying a binding take-or-pay commitment.

One page, four answers

The second-quarter 2026 earnings deck pairs the two units on its highlights page, and it does so four times in a row (2Q26 earnings presentation):

Total area committed increased by 18.2% y/y to 784,802 sqm (or 2,047 MW)

Total area utilized of 542,236 sqm (or 1,289 MW), +13.2% y/y, and utilization rate of 79.2%

New customer commitments (net) of +59,317 sqm (or 254 MW)

Additional area utilized (net) of +21,307 sqm (or 92 MW)

Four brackets, four divisions nobody at the company performs on the page. Here they are, with the operands exactly as printed and the quotients labelled as mine.

One page, four answers
Line on the highlights page Square metres Megawatts My quotient, kW per sqm
Total area committed 784,802 2,047 2.6083
Total area utilized 542,236 1,289 2.3772
Net new customer commitments, 2Q26 59,317 254 4.2821
Net additional area utilized, 2Q26 21,307 92 4.3178

The standing book comes out at 2.38 to 2.61 kW per square metre. The quarter's own increments come out at 4.28 and 4.32. Those two marginal quotients agree with each other to within 0.8%, and they sit about 1.64 times as dense as the average committed book and about 1.82 times as dense as the average utilized book. None of that is a company statistic. It is what GDS's own paired figures imply when a reader divides them, and the implication is that the megawatt being signed in 2026 is a different building from the megawatt already on the books: newer, denser, and on the same floorspace worth roughly twice the power.

The one density the company does print

The annual report does print a density, once, in a passage about power density. The document describes high power density as the ratio of power capacity to net floor area, and gives an average power density of approximately 2.2 kW/sqm for self-developed capacity in service and under construction (Form 20-F, company-hosted copy). That is the filing describing its own ratio, not a quoted sentence.

So a reader who wants to convert has one printed factor to reach for. Here is what it does, and mine is the multiplication: 2.2 kW/sqm times 684,977 sqm is 1,506,949 kW, or 1,506.9 MW, against the 1,507 MW of committed in-service power on the deck's capacity table. The two agree to within 51 kW. The qualifications belong in the same breath, because the filing scopes its 2.2 to self-developed floorspace in service and under construction, while the deck's 1,507 MW is a group committed figure for capacity in service, and neither document says the two populations are the same one.

Apply the same factor to the two headline areas and it stops fitting. 2.2 times 784,802 sqm is 1,726,564 kW, or 1,726.6 MW, which is 320.4 MW below the 2,047 MW the deck prints for those same square metres, a gap of 18.6%. On area utilized, 2.2 times 542,236 sqm is 1,192,919 kW, or 1,192.9 MW, 96.1 MW below the printed 1,289 MW, a gap of 8.1%. My arithmetic on both.

That is the shape of the problem in one paragraph. The company prints one density, and it reproduces a pair the deck never sets side by side, while missing the four pairs the deck does set side by side. There is also a fifth reading. Apply the stated ratio to the deck's own capacity columns rather than its committed columns — 1,589 MW in service plus 579 MW under construction, over 684,977 sqm plus 170,355 sqm — and the answer is 2.5347 kW/sqm, against the 2.2 the same company files. Also mine. Different populations, and neither document states the other's.

Four definitions of a square metre, none of a megawatt

The square metre is not left to inference. The annual report's conventions section defines it repeatedly, and one definition governs the headline (Form 20-F):

“area in service” are to the entire net floor area of data centers (or phases of data centers) which are ready for service;

The same glossary defines net floor area as the total internal area of the computer rooms where customers can house, power and cool their systems and networking equipment, defines area utilized as the part of area in service committed to customers and revenue generating under agreements still in effect, and defines total area committed, area pre-committed, area under construction, commitment rate, gross floor area and utilization rate. Four area quantities, four definitions, one document.

The megawatt gets none of that. In the conventions text I read, no definition of power committed, power billable, IT power or any megawatt capacity metric appears. The nearest thing to a functional definition is spoken, not filed, on the earnings call (2Q26 call transcript):

Bottom line of sales agreements include a binding take-or-pay commitment. This is the metric which we disclosed as bookings.

And later on the same call:

At the midpoint of this year, we had total binding commitments for over 2 gigawatts plus a further 600 megawatts of reservation.

The company's stated convention, then, is that a booking megawatt is a binding take-or-pay commitment in a sales agreement. That is a convention about which agreements count, and it is worth having. It is not a definition of what the megawatt measures — utility capacity secured, installed capacity, design load, contracted load — and no document among the eight I read supplies that definition for the China book.

What a filed document carries and a furnished deck does not

The same quarter, in the regulated Hong Kong interim report, is published entirely in square metres: total area committed and pre-committed of 784,802 sqm, area utilized of 542,236 sqm, area in service of 684,977 sqm, area under construction of 170,355 sqm, commitment rate 92.4%, pre-commitment rate 89.2%, and a utilization rate of 79.2% defined as area utilized divided by area in service (Interim Report 2026). In the operating highlights and operating results sections of that report that I read, no megawatt figure appears at all.

The megawatt equivalents live in the deck. That is a fact about documentary status, and it changes what the two documents can be asked to do. The square-metre series has a filed definition and a filed history: 668,283 sqm of area in service at 31 December 2025 with utilization at 75.5% (FY2025 results release), 653,762 sqm at 30 September 2025 and a quarter in which 50,882 sqm came into service while 15,181 sqm left the consolidation through the C-REIT (3Q25 results release). The megawatt series has a furnished exhibit, a footnote about reservations, and a spoken convention.

That history matters because the two series do not move together. The C-REIT deconsolidation took 15,181 sqm out of area in service in one quarter. It took no megawatts out of anything a reader can check, because the megawatt series in that release was not printed.

There is a second label worth keeping straight. For DayOne, its international associate, the filing uses a different term — total IT power (Form 20-F, company-hosted copy):

As of December 31, 2025, DayOne had total IT power committed of 1,250 MW and total IT power billable of 444 MW.

DayOne's own release, dated on its figures to 20 September 2026 rather than any quarter end, reports 1 GW of IT power capacity generating income under long-term contracts, about 2.3 GW of bookings, 1.1 GW of reservations, 4.6 GW of resources across ten markets, and 15 customers (DayOne release). None of those gigawatts can be added to the China book. Different company, different metric labels, different date, and no document among the eight performs the addition.

One rent, five prices per megawatt

The deck also prints the price: monthly service revenue per square metre, in a five-quarter series, 2Q25 at RMB2,052, 3Q25 at RMB1,992, 4Q25 at RMB1,964, 1Q26 at RMB1,909 and 2Q26 at RMB1,936. The chart states no divisor, so I take the printed number as printed and do nothing else with it.

Convert it, though, and the single price per square metre becomes five prices per megawatt, because each density a reader accepts produces a different rate.

Mine, and each line names the pair its density came from: RMB1,936 divided by 2.6083 is RMB742.2 per kW per month, or RMB742,200 per MW, on the total-committed pair; divided by 2.3772 it is RMB814.5 per kW, or RMB814,500 per MW, on the area-utilized pair; divided by 4.2821 it is RMB452.1, or RMB452,100 per MW, on the quarter's net new commitments; divided by 4.3178 it is RMB448.4, or RMB448,400 per MW, on the quarter's net additional area utilized; and divided by the filed 2.2 it is RMB880.0, or RMB880,000 per MW. The highest of those is 1.96 times the lowest.

Same rent, same page, a factor of nearly two depending on which of the company's own pairings a reader divides by.

Meanwhile the rent itself is falling. RMB2,052 to RMB1,936 is a decline of 5.65% over four quarters, my subtraction, in the same twelve months in which area in service grew 10.8% and total area committed grew 18.2% (2Q26 results release). Cheaper per square metre, more square metres, and a marginal megawatt twice as dense as the average one: the arithmetic of a business moving toward power it did not previously sell on this book.

The two utilisation rates are not one rate

The company prints 79.2%, and it defines it: area utilized divided by area in service. On the megawatt side a reader can build a similar-looking number and it will not be the same number. 1,289 MW of billable power over 1,589 MW of in-service power capacity is 81.1%, mine, and it compares billable power with in-service capacity while the company's 79.2% compares utilized area with in-service area. A 1.96 percentage-point gap between two ratios on two perimeters is not a discrepancy; it is what happens when a company prints one ratio and lets readers invent its twin.

What does add up

The megawatt table is internally exact where it matters. On the capacity and orders slide, 82 MW available for sale plus 1,507 MW committed is the 1,589 MW of in-service capacity; 39 plus 540 is the 579 under construction; 2,997 plus 600 is the 3,597 in the development pipeline; 1,507 plus 540 is the 2,047 committed; and 2,047 plus 600 is the 2,647 committed and reserved. Every one of those closes to the megawatt. Two others do not quite: 82 plus 39 plus 2,997 is 3,118 against a printed 3,119, and 1,589 plus 579 plus 3,597 is 5,765 against a printed 5,766.

Two one-megawatt residuals, on the capacity and available-for-sale rows, and none on any row labelled committed capacity.

The bookkeeping is not the problem. The unit is. GDS can add its megawatts, and it can define its square metres, and it prints both in one bracket. What it has not printed, in the eight documents read on 25 November 2026, is the rule that says which of its own pairs a reader should divide by.

The number a reader cannot pick

The demand story runs in the other unit. Bookings were 260 MW in 2Q26 and 470 MW in the first half, against 471 MW in the deck's own table, a difference that is rounding; the full-year target was raised to 1 GW; reservations stood at 600 MW with more than 1 GW expected by year-end; backlog went from 450 MW at the start of the year to 757 MW at mid-year; and about 3 GW of developable capacity was uncommitted and unreserved. All of that is the company's, from the call and the deck.

A tenant signing 254 MW of new commitments in a quarter is signing a power number. A lender underwriting the same quarter is looking at area in service and a rent per square metre. An investor multiplying either by a growth rate is multiplying a unit whose definition sits in a different document class from the other. The conversion exists — approximately 2.2 kW/sqm for one population, four implied quotients for four others, and a spread of 1.96 times in what the printed rent means per megawatt. What does not exist, among the eight documents read here, is a sentence telling any of those three readers which one to use.

That is the finding, and it is not a complaint about arithmetic. It is a complaint about which number is the capacity.

For the entity these figures belong to, see GDS (Hong Kong) Limited.