Summary
- eStruxture's CAL-3 datasheet prints 90 MW of total power and 70 MW of critical power on one page and never divides them; the division is 1.2857, above the design PUE of less than 1.25 the company's own green framework promises at full load, and 2.5 MW of extra plant at 70 MW of critical load.
- Hydro-Québec's “average of 13 cents per kWh” and its proposed Rate CD of $32.704 per kW plus 8.710 cents per kWh reproduce each other to the cent once the demand charge is read monthly and the load flat out. Both provinces now price the reservation; eStruxture publishes the drawn megawatt on no page it has issued.
Two numbers on one page, and no division between them
The CAL-3 datasheet is a marketing document and unusually specific for one. It prints 90 MW of total power, of which 70 MW is critical power, across six Phase 1 data halls, at 125 kW or more per cabinet, with “multiple 15MW lines for a total of 90MW+” from FortisAlberta, a closed-loop water-based cooling system marketed as low PUE and carrying no numeric ratio at all, and a year built of 2026 https://info.estruxture.com/hubfs/Data%20Sheets/eStruxture_Datasheet_CAL3%20EN%20V2%202025.pdf. Two capacity numbers, one page, one boundary — total facility power and the computing load inside it. The document never performs the division that connects them.
I do. 90 ÷ 70 = 1.2857. That quotient is mine, and both operands are printed cells on that single page. It is the facility-power-to-critical-power ratio at full load, which is what power usage effectiveness measures.
Now open the company's own green framework, published in April 2025, and the same site is described twice over. The framework says eStruxture's data centres “are generally designed to achieve a design PUE of less than 1.25 at full load”, and sets eligibility at a design PUE of 1.4 or below for anything constructed before 1 March 2025 and 1.3 or below for anything constructed on or after that date https://www.estruxture.com/hubfs/eStruxture_Green%20Finance%20Framework%20(JUL%202).pdf?hsLang=en. Sustainalytics, retained to opine on the framework, restates both thresholds in May 2025 and notes that its opinion does not measure the actual impact of the financed projects https://www.estruxture.com/hubfs/estruxture-green-finance-framework-second-party-opinion-(1).pdf?hsLang=en.
Apply the promised ratio to the datasheet's critical load. 70 × 1.25 = 87.5 MW of implied facility power. The datasheet's own 90 MW is 2.5 MW above that. Both numbers describe the same building at the same full-load design basis, so the comparison holds: the site is designed at a ratio that satisfies the framework's 1.3 eligibility ceiling and misses the 1.25 promise it makes in the same document. Put differently, 1.3 ÷ 1.25 = 1.04 and 1.4 ÷ 1.25 = 1.12 — the framework's floor for a new build sits 4 per cent above its own target, and its floor for an old one sits 12 per cent above it.
A design ratio and an operating ratio are two objects; a promise and a tolerance are two more.
What does 2.5 MW cost? A megawatt held for a full year is 8,760 MWh, so 2.5 MW is 21,900 MWh. Priced flat out at the proposed data-centre rate of 13.19 cents per kWh, that is about C$2.89 million a year. Priced at the existing large-power rate of 5.88 cents, about C$1.29 million. Further down, those two prices are printed in two Quebec documents, and neither document says what load factor produced them.
The datasheet's per-cabinet rating gives the other half of the picture. On its printed 125 kW or more, 70 MW of critical power supports about 560 cabinets and 90 MW of facility power about 720. That is a ceiling — the top of a range the datasheet expresses as “125kW+” — and no reviewed page prints either count.
The reports the framework promised, and the record so far
That same framework commits eStruxture to publish annually an Allocation Report and an Impact Report, “the latter subject to the availability of suitable information and data”, and lists the metrics those reports may carry: design average annual PUE of eligible projects, electricity sourced from renewable sources in percent and MWh, water usage effectiveness, waste diverted, low-carbon materials procured.
It also states that all sites are grid-connected, that the Quebec, Ontario and British Columbia grids are powered primarily by clean electricity, and that renewable power purchase agreements are under evaluation including for critical IT load and building load.
Here is what the record holds, counted on 27 November 2026 over the 25 documents cited in this article. No page in that set prints electricity consumed in MWh or GWh for any eStruxture site or for the portfolio. No page prints a measured or trailing operating PUE for the current fleet. No Allocation Report and no Impact Report was located in two research passes. No page prints a renewable-share percentage or renewable MWh. And no page prints a power-cost line, an energy expense, or a revenue figure for the rated portfolio, so a power-cost-to-revenue ratio cannot be computed from the documents read. Each of those is a count over a named set.
None of them is a claim about what exists elsewhere.
The only operating ratios on the record are seven years old. A December 2019 company blog reports that a retrofit cut MTL-1's cooling requirement by over 70 per cent in one year and reduced that facility's PUE to 1.4, and that MTL-2 had established a PUE of 1.3; both were water-free air-cooled designs on Hydro-Québec power https://www.estruxture.com/blog/digital-infra-montreal-green-data-centers-and-cloud-gaming. The same post offers an order-of-magnitude comparison — a 30 MW facility is equivalent in power to 25,000 homes — which is 1.2 kW per home. Run it backwards: at MTL-2's printed 1.3, 30 MW of critical load draws 39 MW; at 1.4, 42 MW. Those are my quotients, not the blog's.
MTL-2's scale is corroborated from outside: a Vertiv case study describes a 187,000 square foot facility with “planned capacity” of 30 MW and 30 kW per rack as standard https://www.vertiv.com/491f12/globalassets/documents/case-studies/estruxture/vertiv-estruxture-cs-en-na-ch-00086-web_283133.pdf. What is not corroborated anywhere is what MTL-2 draws in a year.
The portfolio pages repeat a wider claim. The Montreal page offers “760,000+ square feet of space and more than 130MW of power”, quotes site capacity ranging from 1.2 MW to 30 MW, and describes Montreal supply as 100 per cent renewable energy from Hydro-Québec https://www.estruxture.com/data-centers/montreal. The green-energy page names the Hydro-Québec partnership, repeats “the lowest power rates in Eastern North America”, lists free cooling, modern chiller compressors and hot/cold aisle containment as the efficiency measures, and prints no MWh, no PUE value and no renewable percentage https://www.estruxture.com/data-centers/green-energy. Neither page is dated, and neither answers the only question a power bill asks: how much electricity did you buy?
The provinces bill the reservation
Quebec's proposed Rate CD is where a megawatt stops being a marketing number. Filed as document B-0076 in the Régie de l'énergie's file R-4333-2026 on 4 August 2026, it would apply to data-centre service contracts with authorised demand of 5,000 kW or more, at $32.704 per kW of billing demand plus 8.710 cents per kWh; consumption while demand exceeds 110 per cent of projected ramp-up demand is billed at 17.42 cents per kWh; minimum billing demand is 75 per cent of the maximum power demand reached in a winter period within the preceding 12 months; and where the highest real power demand over the last 12 periods falls below 60 per cent of projected demand, a $92.28 per kW charge applies. Existing eligible data-centre contracts would be billed at 62 per cent of Rate CD from 1 November 2026, 71 per cent from 1 April 2027, 81 per cent from 1 April 2028 and 90 per cent from 1 April 2029 https://www.regie-energie.qc.ca/fr/participants/dossiers/R-4333-2026/doc/R-4333-2026-B-0076-Dem-PieceRev-2026_08_04.pdf.
Five months earlier, on 19 February 2026, Hydro-Québec had described the same idea in a press release: a rate for data centres requiring more than 5 MW, “equivalent to an average of 13 cents per kWh, approximately double what current large-power customers pay”, expected in the second half of 2026 subject to Régie approval, with nearly 190 MW of the 200 MW the sector consumes falling under it and about 1,000 MW projected by 2035 https://news.hydroquebec.com/news/press-releases/all-quebec/hydro-quebec-proposing-regie-energie-new-rate-large-data-centres-adjustment-rate-cryptographic-use-applied-blockchains.html.
The two documents look irreconcilable. They are not, once one convention is supplied — and the convention is not printed in either. Read the demand charge as monthly and assume the load runs flat out for all 8,760 hours: 8.710 + (32.704 × 12 ÷ 8.760) = 8.710 + 4.480 = 13.19 cents per kWh. Do the same to the existing large-power schedule: 3.821 + (15.027 × 12 ÷ 8.760) = 3.821 + 2.059 = 5.88 cents. And 13.19 ÷ 5.88 = 2.24, which is the press release's “approximately double”. The arithmetic is mine; the two price lists are theirs.
The cost of a fully let CAL-3 on that basis is C$46.36 million a year at the large-power rate and C$103.99 million at the proposed data-centre rate — a difference of C$57.63 million a year for the same 90 MW and the same 788,400 MWh. Both of those are ceilings, not forecasts: they assume the design rating is drawn in every hour of the year.
The load factor then becomes the whole game. Halve it at the same billing demand and the delivered price of a kilowatt-hour rises: Rate CD from 13.19 to 17.67 cents, Rate L from 5.88 to 7.94. The demand charge is paid on the reservation, not on the draw. The transitional discount prints a third price — 62 per cent of Rate CD is 8.18 cents per kWh flat out, rising to 11.87 cents from 1 April 2029 — which means the first four years of a Quebec data-centre contract are a declining subsidy on exactly the behaviour the rate is meant to price.
Rate L, for its part, is not obviously available at all. Its published terms apply to an annual contract whose contract power is at least 5,000 kW “principally related to an industrial activity”, and define contract power as the minimum demand the customer agrees to pay for and that Hydro-Québec must be ready to supply at any time https://www.hydroquebec.com/business/customer-space/rates/rate-l-industrial-rate-large-power-customers.html. Whether a data centre is an industrial activity appears on no page read here. The 2026 rate grid itself prints Rate L's power premium at $15.027 per kW, energy at 3.821 cents per kWh, and overrun charges of $8.808 per kW daily and $26.420 per kW monthly, alongside a stated 3.8 per cent increase for general rates and Rate L from 1 April 2025 to 1 April 2026 https://hydroquebec.com/data/documents-donnees/pdf/grille-tarifaire.pdf. Every figure in the flat-out arithmetic above comes from that grid and from B-0076.
Alberta prices the wires the same way. FortisAlberta's Rates, Options and Riders schedule effective 1 October 2026 puts Rate 63 Large General Service on points of service with expected peak capacity above 2,000 kW and prints three capacity components — transmission system usage $0.214447 per kW-day, transmission capacity $0.174184 per kW-day, distribution local facilities $0.015170 per kW-day — plus $0.006228 per kWh https://www.fortisalberta.com/docs/default-source/default-document-library/rates-options-and-riders-schedules-effective-october1-2026.pdf. Add the components: $0.403801 per kW-day, or $147.39 per kW-year, or C$13.26 million a year on 90,000 kW before a single kilowatt-hour is consumed. This is a wires price, not an all-in power price; Alberta prices energy separately and this schedule does not set the commodity. Note also the capacity basis: the greater of metered demand, 90 per cent of the highest metered demand in the past 12 months, 135 per cent of contract minimum demand, or a 2,000 kW rate minimum. That 90 per cent clause is a ratchet. Unsold capacity is not free capacity; it is a twelve-month carrying cost.
A queue is not a meter
FortisAlberta's own 2026 Distribution System Plan, published 31 August 2026, counts 19 data-centre interconnection requests totalling approximately 426 MW of requested distribution-connected capacity as of May 2026, with individual projects between 1 MW and 75 MW, of which 48.6 MW was connected and in service, 117.8 MW had been accepted into the active interconnection process, and about 260 MW sat in assessment and outside the load forecast https://media.auc.ab.ca/prd-wp-uploads/ReportDocuments/Final%202026%20FortisAlberta%20DSP%20Report.pdf. Divide: 11.41 per cent connected, 27.65 per cent accepted and active, 61.03 per cent in assessment. The three printed parts sum to 426.4 MW against a printed “approximately 426”. None of those three numbers is a meter reading; two of them are intentions.
The system operator works on a larger board. The AESO's September 2025 update reports “over 20,000 MW of data centre load now on the AESO project list”, notes that data centres continue to request load service without matching generation, and describes work on ISO tariff contributions and demand rates for large loads plus a long-term framework process https://www.aeso.ca/assets/Uploads/grid/Data-Centre/AESO-Data-Centre-Update-September-2025.pdf. FortisAlberta's 426 MW is 2.13 per cent of that — a queue measured against a queue, on one distribution utility, in one province. It is the only comparison the two documents allow, and it is not a comparison of demand.
At the site level, the best third-party record is explicit about what it does not know. Alberta Data Centre Watch's CAL-3 page, last verified 3 November 2026, says CAL-3 is designed for 90 MW of total facility power including 70 MW for computing equipment; that the first 45 MW of data-centre load would be served by three FortisAlberta distribution lines; that 21 backup generators rated 66.75 MW in total are counted separately from data-centre demand; that “these are design ratings. Actual electricity use will depend on how much of the facility is operating”; that commercial service was not confirmed as of the verification date; that the full build is about CA$750 million with a second-half 2026 target; and that annual electricity use, utility contract details and supply mix remain unresolved https://albertadatacentrewatch.ca/projects/estruxture-cal-3/.
Three things follow from those cells. “Multiple 15MW lines for a total of 90MW+” implies six 15 MW lines, since 90 ÷ 15 = 6, and the datasheet prints no count. The 21 generators are 74.2 per cent of the 90 MW facility rating and average 3.18 MW each. And the first 45 MW on three lines is half of the design capacity, which is a phasing statement, not a load statement. The provincial inventory page for the project could not be read for this article and anchors no figure here.
The megawatt that multiplies
The capacity claim gets larger as the documents get newer, and the nouns change with it. The Calgary page offers “a combined 125MW total capacity, which will continue to expand in 2017 and beyond”, describes CAL-3 at 90 MW and quotes power options up to 125 kW per cabinet, on a page whose “2017” is plainly a date error https://www.estruxture.com/data-centers/calgary. The CAL-3 page puts the launch in fall 2026 and repeats 90 MW of total power for a Tier III-designed facility https://www.estruxture.com/data-centers/calgary/cal-3. The October 2024 announcement said the same 90 MW, up to 300,000 square feet, live in the second half of 2026 https://www.estruxture.com/press-releases/estruxture-announces-albertas-largest-data-center-introducing-the-groundbreaking-cal-3-facility.
Then on 31 March 2026 the company's “eStruxture 2.0” post says it is “100% Canadian-owned and operated” and is scaling “with over 500MW of secured power”, with racks from 30 kW to 150 kW and 1 MW liquid-cooled https://www.estruxture.com/insights/in-the-news/estruxtures-plan-to-make-canada-a-global-data-centre-hub. A May 2022 interview with chief executive Todd Coleman put the footprint at over 760,000 square feet and 130 megawatts of total power capacity https://www.estruxture.com/insights/in-the-news/the-rising-demand-for-data-centers-interview-opportunity-with-estruxture. The site summary repeats 16+ data centres, 760,000+ square feet, 130+ MW and nearly 1,000 customers, undated https://estruxture.com/llms.txt.
500 ÷ 130 = 3.85, and it would be satisfying to call that growth. The nouns forbid it: 130 MW of power capacity in 2022, 130+ MW of power on undated pages, over 500 MW of secured power in 2026. Three nouns, three dates, no definition of “secured”. What can be said is narrower and worse: Calgary alone is quoted at 125 MW, which sits above the undated 130+ MW portfolio line.
The securitisation documents are the only financial perimeter in the record, and they are a different perimeter again. Morningstar DBRS assigned BBB with Stable trends to $88.5 million of Series 2026-1 and $61.5 million of Series 2026-2 Class A-2 notes that closed on 20 March 2026, against $900 million of Senior Notes outstanding; the rated portfolio is six wholesale-focused colocation data centres in Montreal (three), Calgary (two) and Toronto (one), with more than 300 tenants, approximately 68 per cent hyperscale and 32 per cent enterprise contracts by annualised monthly recurring revenue, approximately 41 per cent of that revenue from leased rather than fee-simple-owned sites, a minimum DSCR (interest only) of approximately 1.90x before the anticipated repayment date and a refinance PLCR of 1.38x to 2056 https://dbrs.morningstar.com/research/477142/morningstar-dbrs-assigns-credit-ratings-of-bbb-with-stable-trends-to-the-senior-notes-issued-by-estruxture-issuer-limited-partnership. The July 2025 action on the first issuance — $450 million of Series 2025-1, $150 million of 2025-2, $150 million of 2025-3 — counted approximately 390 tenants and a 38 per cent hyperscale, 34 per cent wholesale, 28 per cent enterprise split, with approximately 40.5 per cent of revenue from leased data centres, rating-case minimum DSCR of 1.94x and average 1.97x, a refinance PLCR of 1.43x to 2055, and a statement that no environmental, social or governance factors had a significant or relevant effect on the credit analysis https://dbrs.morningstar.com/research/459485/morningstar-dbrs-finalizes-its-provisional-credit-ratings-on-estruxture-issuer-limited-partnership-at-bbb-with-stable-trends.
The two classifications are each internally complete — 68 + 32 = 100 and 38 + 34 + 28 = 100 — and neither explains the other; a tenant count of about 390 became “more than 300” without a word of explanation. The 41 per cent and the 40.5 per cent are two measures on two perimeters, printed a year apart, and they are not a trend. The six rated data centres are 37.5 per cent of the 16 counted as of March 2025, and no reviewed page prints megawatts for either perimeter, so the two cannot be reconciled on capacity at all.
And the money: C$1.35 billion in July 2025, comprising the first rated, Canadian asset-only data centre securitisation raising C$750 million from its inaugural issuance plus a DevCo revolving credit facility of up to C$600 million, with the notes issued under the Green Finance Framework https://www.estruxture.com/press-releases/estruxture-secures-1.35b-financing-to-expand-and-power-canadas-digital-infrastructure; then C$150 million more in March 2026, bringing total debt raised under the ABS and DevCo programme to C$1.55 billion https://www.estruxture.com/press-releases/estruxture-secures-150m-additional-financing-to-expand-and-power-canadas-digital-infrastructure. Read those two beside the July 2025 rating statement that ESG factors had no significant or relevant effect on the credit analysis. They are not in conflict: one is an eligibility test for the use of proceeds, the other a statement about cash flow. They are, however, the reason a design PUE can be simultaneously load-bearing for the financing and irrelevant to the rating — and the reason nobody is obliged to publish what the buildings actually draw.
Ratio, reservation, and the cell nobody prints
Walk the perimeters and the same hole appears in each. CAL-3 prints 90 MW total and 70 MW critical, prints no consumption, prints no ratio, and is joined to a price by no page. The Alberta record prints 45 MW of first-phase load on three lines and 66.75 MW of backup generation, prints no consumption and no site ratio. Calgary prints 125 MW combined; no consumption, no ratio. The portfolio prints 130 MW, 130+ MW and over 500 MW secured; its only ratio is the framework's design target. The Montreal range prints 1.2 MW to 30 MW per site and its only ratios are the 2019 blog's 1.4 and 1.3.
The rated portfolio prints six data centres, DSCR 1.90x and PLCR 1.38x, no revenue and no megawatts. The Hydro-Québec instruments print two full price schedules and no consumption. FortisAlberta prints a wires price, a 426 MW queue and a 90 per cent ratchet.
No reviewed page in that set performs the division the thesis asks for: none divides a capacity by a PUE, none divides a power cost by a megawatt sold, and none puts the sold megawatt, the ratio and the drawn megawatt on one page. The join in this article is mine. That is why the share of revenue consumed by the implied power bill cannot be computed honestly from anything read here: with no revenue figure on either rating page, any percentage would need a denominator I invented.
What the record does supply is the other half of the trade. A 90,000 kW reservation at FortisAlberta's wires components costs C$13.26 million a year before energy; the 2.5 MW gap between the datasheet's 90 MW and the framework's implied 87.5 MW costs about C$2.89 million a year at the proposed Quebec rate; and the difference between the old and new Quebec schedules on a fully let CAL-3 is C$57.63 million a year. Those are the numbers a tenant, a lender and a provincial regulator are now arguing about. The number they are arguing about it with — the drawn megawatt — is printed nowhere.
That is the finding, and it has a date. On 27 November 2026, across 25 documents issued by eStruxture, FortisAlberta, Hydro-Québec, the Régie de l'énergie, the Alberta Electric System Operator, Morningstar DBRS, Sustainalytics, Vertiv and one Alberta project tracker, the capacity and the price are public and the consumption is not. The directory entry for the company sits at https://btw.media/en/directory/estruxture-data-centers-inc.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.