Skip to main content

North America Datacenter

North America Datacenter

Datacenter company intelligence covers data centre operators, colocation platforms, hyperscale campus developers, interconnection providers, and digital infrastructure investors in North America, with enough context for readers to understand how these organisations build, operate, finance, regulate, and sell the infrastructure that supports digital markets.

North America Datacenter signal visual
North America DatacenterNorth America Datacenter

Latest Coverage

Latest from North America Datacenter

35 articles

Five identical unmarked steel data-centre cabinet doors in a row, with a bare copper busbar and a loose cable coiled on the floor beside an empty circular cut-out where a round instrument would be fitted.

North America Datacenter

Equinix says power, not space, is the limit. Its numbers count space.

The 2025 Form 10-K puts the constraint in a risk factor and the estate in cabinets: 392,300 of capacity, 299,300 billed, no megawatt column. Every kilowatt-per-cabinet figure in the fifteen documents read for this briefing comes from outside the filings.

Nov 25, 2026
A brass and blued-steel metering bench with two identical glass odometer drums, one scaled in cubic feet stopped at 750 682 beside a plate reading PER CUBIC FOOT, the other scaled in square feet carrying a bolted 12.40 rate plate whose divided-scale window is machined flat and blank, separated by a milled slot of four empty threaded bolt holes where a linkage arm was never fitted, above a sealed dollar sump fed by two pipes, one from the square-foot drum and one from a megawatt dial engraved with both its operands.

North America Datacenter

Iron Mountain bills by the cubic foot and prints a rate per square foot

One operating table hands the data-centre business both of the operands a reader needs: 544.6 leasable megawatts beside 272,102 thousand dollars of storage rental. The records business gets 750,682 thousand cubic feet and a rate denominated in a unit it does not bill in.

Nov 25, 2026
Editorial still life: a wall of identical grey archive storage boxes and steel shelving on the left, a data-centre cold aisle of closed black cabinets on the right, and on a raw concrete plinth between them a machined brass and steel measuring scale with four uneven horizontal notches.

North America Datacenter

Iron Mountain Prices Its Debt With One Ratio and Tests It With Another

A credit agreement, an amendment and a bond indenture each answer the question 'how levered is this borrower?' — and the readable text prints the pricing ladder, the covenant's inputs and the dividend condition as three separate instruments. One runs the price. One runs the…

Nov 21, 2026
An unfinished data-centre hall with empty, plastic-wrapped server racks and a live electricity meter already turning on the wall

North America Datacenter

Digital Realty Sold the Space. The Rent Arrives in 2027.

Digital Realty's third quarter prints two dates against the same square metre: the day a lease was signed and the day the rent starts. Across the quarter's new signings those two dates sat 17 months apart, and the company now publishes a schedule that puts every dollar of that…

Nov 20, 2026
A precision measurement bench: a quarter-arc cam with one index mark drives a toothed multiplier drum four times its arc, turning a threaded shaft against a fixed millimetre scale, while beside it a machined contract holder stands completely empty, clips gripping nothing.

North America Datacenter

HPE's Run-Rate Is a Quarter Times Four. Its Own Filing Says So.

HPE's favourite number has no term, no cancellation schedule and no committed life. It is one quarter multiplied by four, and the filing that defines it tells you not to combine it with revenue.

Nov 13, 2026
Cutaway of a data-centre hall with three measuring instruments mounted on the near wall, each on a different scale and joined by no cable

North America Datacenter

Core Scientific's backlog is measured in megawatts. The $24 billion lives in a press release.

Its September-quarter filing defines the measure behind “contracted backlog” as power committed under executed customer contracts: 1,120 MW leased against 485 MW billable. The only dollar schedule of future customer receipts is an undiscounted lease-maturity table that leaves out…

Nov 13, 2026
Dense row of high-port-count data-centre Ethernet switches with hundreds of copper and optical cables converging toward racks of AI servers

North America Datacenter

Two of Arista's Three AI Numbers Cannot Fall

Arista says it will book at least $3.5 billion in AI fabrics revenue this year. Around that figure sit a customer tally that only goes up and a concentration disclosure delivered as a range. Read all three before you size anything against them.

Nov 12, 2026
A steel process flare burning at dusk on a gravel well pad, with two white containerised generator enclosures and gas piping running from a wellhead manifold beside it.

North America Datacenter

The Flare Argument Was Real. It Was Also Two Engines Wide.

Crusoe built a business on gas that would otherwise burn at the end of a flare boom. Permits in Montana, North Dakota and New Mexico describe exactly that equipment, site by site. Then the biggest campus filed for pipeline-quality gas — and the 220,000-tonne climate headline…

Nov 12, 2026
A single fibre patch lead runs from a switch port into a cable manager inside a dim Honolulu data-centre interconnection hall, with a blank equipment label frame out of focus in the foreground and a narrow band of pale sea-and-sky light at a high window.

North America Datacenter

Hawaii's Internet Exchange Registers One Port, and It Belongs to Somebody Else

Hawaii's Internet Exchange Registers One Port, and It Belongs to Somebody Else intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that may…

Nov 10, 2026
Isometric diagram of three unlabeled slab buildings on a dark field, joined by thin luminous fibre strands that converge on a ring of routing nodes hanging between them, tethered to all three but attached to none.

North America Datacenter

PIT-IX Reports Three Buildings. The Record Won't Say Which.

An internet exchange is a building problem in a routing costume. The Pittsburgh Internet Exchange now tells the world it runs across three facilities, counts thirty-six member networks and has imported forty-one networks from its IX-F feed — and it does not name one of the three.

Nov 4, 2026
AI illustration of an aisle between dark server racks, with yellow and aqua cables overhead and a closed door at the far end.

North America Datacenter

In Hawaii, the internet also needs a way to stay home

Undersea cables connect Hawaii to distant markets. HIX has a less spectacular job: helping nearby institutions reach one another without an unnecessary ocean crossing.

Oct 17, 2026
Single-story data center building in a suburban North American commercial park at dusk

North America Datacenter

Ontario Datacenter LLC: a California colocation identity that outlived its own network

Ontario Datacenter LLC built and marketed a real Inland Empire datacenter — and then, by the public record, its own routing identity went quiet while a successor entity under the same principal and the same street address began announcing its address space. The company persists…

Sep 29, 2026
Assembly line of liquid-cooling coolant distribution units and power modules in a modern data-center equipment factory

North America Datacenter

Vertiv: AI racks are priced on power and thermal, and the record says performance — not demand backlog — is quantified

In a liquid-cooled AI rack, the silicon is no longer the first failure mode. Power conversion, coolant distribution and heat rejection set the deployment ceiling — and Vertiv's own disclosures let readers test whether the supplier layer is shipping at that pace, not merely…

Sep 26, 2026
Editorial illustration of a CleanSpark data centre in Sandersville, Georgia, with Meta branding and figures for 175MW capacity and $2.227bn secured notes.

North America Datacenter

CleanSpark seeks $2.23bn for Meta-backed data centre

CleanSpark plans to raise $2.227bn in secured notes for its 175MW Sandersville project, where Meta backs a 20-year lease.

Sep 21, 2026
Editorial illustration of a large AI data-centre campus with power infrastructure and modular data-centre units being installed

North America Datacenter

Crusoe raises $3.9bn for AI factories

The Series F gives Crusoe more capital for large campuses and modular Spark deployments, but the company has not said which projects will receive the money.

Sep 21, 2026
Editorial illustration of Theseus Infrastructure leadership beside a conceptual US data-centre campus with Anthropic, Macquarie and GIC branding

North America Datacenter

Theseus names Raval to lead Anthropic build-out

The former CyrusOne and Equinix xScale executive will lead a Macquarie-GIC-owned platform developing US data-centre capacity for Anthropic.

Sep 18, 2026
Editorial illustration of a Meta data centre development in Utah with mountains, construction equipment and graphics highlighting $3bn investment, power demand and water constraints.

North America Datacenter

Meta raises Utah data centre spend to $3bn

Meta has increased its planned Utah data centre investment to $3bn, but has not disclosed the capacity, cooling design or power arrangements behind the higher figure.

Sep 18, 2026
Editorial illustration of a Vantage data centre alongside details of its $2bn revolving development facility

North America Datacenter

Vantage closes $2bn development facility

Vantage has secured a five-year revolving facility for early-stage North American data-centre development before individual projects reach construction financing.

Sep 17, 2026
Editorial illustration of a Google and Blackstone AI data-centre construction site facing permitting, grid access and equipment constraints

North America Datacenter

Google-Blackstone venture faces data-centre delays

The venture is still targeting 500MW of capacity in 2027, but permitting, equipment availability, and grid reviews are slowing individual US locations.

Sep 10, 2026
Illustration of a factory-built data-centre module being manufactured off-site and lifted into place at a construction site

North America Datacenter

Compu Dynamics moves AI data-centre construction off-site

Compu Dynamics is expanding factory-built delivery for AI projects, shifting more power, cooling and white-space work away from the construction site.

Sep 1, 2026