Summary

  • Tenaga defines maximum demand as "twice the largest number of kilowatt-hours (kWh) supplied during any consecutive thirty minutes in that month", which is the month's highest half-hour average: one interval out of 1,440.
  • The Medium Voltage General schedule prices that one kilowatt twice, at RM29.43 capacity plus RM59.84 network per kilowatt per month, and High Voltage General at RM31.21, so the two general schedules meet at a load factor of 60.3 per cent that no document among those read prints.
  • The 2QFY2026 analyst briefing counts 61 secured data-centre projects at 8.35 GW of "total maximum demand" against 1,256 MW of actual load utilisation in June 2026, and no page read states whether those gigawatts are summed or coincident.

The number that sets the bill

The Energy Commission publishes the Peninsula schedule for 1 July 2025 to 31 December 2027 and says the tariff runs under the Incentive-Based Regulation framework, with the Automatic Fuel Adjustment mechanism replacing the Imbalance Cost Pass-Through; the same release puts the RP4 average base tariff at 45.40 sen per kilowatt-hour, replacing the 45.62 sen approved in December 2024 (Energy Commission release). Its regulatory guidelines describe what a tariff normally consists of: a fixed customer service charge in ringgit per month, energy charges in sen per kilowatt-hour, and a demand charge in ringgit per kilowatt (implementation guidelines).

What neither document does is define the kilowatt. Tenaga does, on a page of its own, in two sentences:

MD is measured in Kilowatt (kW). It is the highest level of electrical demand monitored in a particular period usually for a month period.

Maximum Demand for any month shall be deemed to be twice the largest number of kilowatt-hours (kWh) supplied during any consecutive thirty minutes in that month.

(maximum demand)

The factor of two is arithmetic, not a surcharge: a kilowatt-hour delivered evenly over thirty minutes is an average of two kilowatts, so doubling the half-hour energy count states the same interval as a rate of power. The billed quantity is therefore an average, taken over a fixed half hour, read at its monthly maximum. A thirty-day month holds 1,440 such intervals; one of them sets the demand line, which is 0.069 per cent of the month, my division of one by 1,440.

The page also notes that demand charges apply to medium- and high-voltage customers while low-voltage customers are generally charged for energy only, so the mark of a large supply is not how much it consumes but that its peak carries a price.

Two prices for one kilowatt

The Medium Voltage General row reaches a reader as an indexed rendering of the schedule table, labels and values interleaved, not as a page image:

Caj Tenaga - Untuk semua kWj sen/kWj 29.83 / Caj Kapasiti - Setiap kilowatt permintaan maksimum sebulan RM/KW 29.43 / Caj Rangkaian - Setiap kilowatt permintaan maksimum sebulan RM/KW 59.84 / Caj Peruncitan RM/bulan 200.00

Read as a table, that is 29.83 sen for every kilowatt-hour, RM29.43 per kilowatt of maximum demand per month, RM59.84 on the same kilowatt per month, and RM200.00 per month retail (schedule). Two of the four rows multiply one quantity, and they add to RM89.27 per kilowatt per month, my addition. The high-voltage general row is 43.03 sen for every kilowatt-hour, RM16.68 and RM14.53 on the same kilowatt, and RM250.00 retail, which is RM31.21 per kilowatt per month. The time-of-use rows price the same kilowatt only inside the peak window: medium voltage at RM30.19 and RM66.87, RM97.06 together, with energy at 31.32 sen on peak and 27.23 sen off it; high voltage at RM21.76 and RM23.06, RM44.82 together, with energy at 44.52 and 40.43 sen. Every sum there is mine.

The two general schedules disagree in opposite directions, which is the interesting part. Medium voltage charges RM58.06 more per kilowatt per month than high voltage and 13.20 sen less per kilowatt-hour. Divide the first by the second and the two schedules cost the same at 439.8 kilowatt-hours per kilowatt per month; over a 730-hour month that is a load factor of 60.3 per cent, my arithmetic on two printed rows.

No document among those read prints that figure, and it is the figure that decides which schedule is cheaper for a given customer: below it, high voltage's cheaper kilowatt is outweighed by its dearer energy, and above it the order reverses. To a data centre, whose load factor is a forecast on the day it signs rather than a fact, that is the whole choice.

Under time of use, the same kilowatt is filtered by a clock:

In addition, for Non-Domestic Medium Voltage and High Voltage customers, Maximum Demand which occurs during Off-Peak period will not be charged.

On Monday to Friday Peak : 2 PM to 10 PM Off-Peak : 10 PM to 2 PM / On Saturday and Sunday Off-Peak throughout the day (24 hours)

(tariff explanation)

Forty hours out of a 168-hour week is 23.8 per cent of it, my division. In time of use the billed half hour is the largest one inside that window, so a campus whose peak falls at eleven at night is billed for a smaller kilowatt than a campus with the same load peaking at three in the afternoon. The premium over the general schedule is RM7.79 per kilowatt per month (97.06 less 89.27), and moving 190.5 kilowatt-hours per kilowatt of billed demand out of the peak window pays it back, using the schedule's own 4.09 sen gap between its peak and off-peak energy rates; both numbers are mine.

What a month of nothing costs

The old schedule printed a floor and the rows retrieved from the new one do not. Before 1 July 2025 the medium-voltage commercial row carried

Minimum monthly charge is RM600.00

beside RM30.30 per kilowatt per month and 36.50 sen per kilowatt-hour, with the same RM600.00 for the industrial row, and the page states that its rates apply before 1 July 2025 (pre-restructuring pricing). The RP4 rows retrieved for the standard non-domestic medium- and high-voltage categories contain no line with the word "minimum" in it: they print energy, capacity, network and retail (schedule). Whether a floor survives in a row the retrieval did not reach is not something those rows can answer. What they do print is the arithmetic of a month with no consumption at all: the energy charge multiplies zero, the two demand rows multiply a maximum demand of zero, and what remains is the retail charge, RM200.00 on both medium-voltage schedules and RM250.00 on both high-voltage ones.

The penalty is a percentage of the charge

Power factor is the second condition on the same invoice, and it is stated in units of the bill:

[[(0.85 - PF)/0.01] x 1.5% ] x [RM kWh + RM kW + RM AFA]

(charges and penalties). The surcharge is 1.5 per cent of the current bill for every 0.01 below 0.85, with a further 3 per cent for every 0.01 below 0.75, and the base it multiplies is the sum of the energy, demand and fuel-adjustment components, so a power-factor failure is charged partly as a percentage of the capacity charge it accompanies. At 0.80 the surcharge comes to 7.5 per cent; at 0.70, 30 per cent, my arithmetic from the printed bands.

The threshold itself is printed with two voltage boundaries. One page requires at least 0.85 for supply at 33 kV and below and at least 0.90 at 132 kV and above (power factor); the charges page writes the lower threshold as applying below 132 kV. Two printed boundaries, and a connection between 33 and 132 kV sits inside one and outside the other.

The same words on a slide

The 2QFY2026 analyst briefing applies the phrase to a population instead of a meter:

In System @ June 2026 42 projects @ 5.65GW ... No. of projects Total maximum demand (GW) ... 61 projects ... 1,256MW for June 2026 ... Actual Load Utilisation ... 67% of Malaysia's secured DC capacity ... 29 out of 61 (5.6GW out of 8.3GW)

Those are chart fragments rather than sentences (2QFY2026 briefing), and they say that 61 secured data-centre projects carry a total maximum demand of 8.35 GW as at June 2026, that 42 of them are in system at 5.65 GW, and that actual load utilisation was 1,256 MW in June 2026. Divide the utilisation by the book and it is 15.0 per cent of 8.35 GW, or 22.2 per cent of the 5.65 GW in system, and the book is 6.65 times the June figure, all mine. The two stages tile the total exactly: 19 projects and 2.70 GW are the difference, and 5.65 plus 2.70 is 8.35, my arithmetic. Johor holds 29 of the 61 projects and 5.6 of the 8.3 GW, which the deck renders as 67 per cent.

Set against the system, the same briefing series prints 21,049 MW of peak demand recorded on 28 May 2025, with readings of 21,179, 21,276 and 21,469 MW in 2026 under the label current peak demand (1QFY2026 briefing). Against 21,049 MW, the secured data-centre book is 39.7 per cent and the June utilisation 6.0 per cent, my figures, and they hold only if per-project maxima are summed and not coincident, which no document read states.

That conditional is the article. Adding 61 monthly maxima, each taken at its own site's worst half hour, and measuring 61 sites at one shared instant are different operations on different clocks. The tariff's maximum demand is the second kind. A reader who takes 8.35 GW as the number the schedule multiplies has substituted the first for the second.

If the whole secured book were one billed maximum demand at the medium-voltage general rates, its capacity and network rows alone would come to RM745,404,500 a month, from 8,350,000 kilowatts times 89.27; at the June utilisation level they would come to RM112,123,120, from 1,256,000 times 89.27. Both are mine, both demand only, both on the summation assumption just stated.

The announcement measures what a campus could draw. The invoice measures the worst half hour it did. Between them stands a schedule that defines its own kilowatt, prints it twice, prices it twice more, sells a second version of it that applies only between two and ten in the afternoon, and leaves the gigawatt to the slide. Tenaga Nasional Berhad owns both documents, and only one of them is a definition (directory).