- Twelve fibre pairs per cable, SDH, and “a capacity equivalent to 30 720 telephone circuits per fibre pair” is the whole of the published engineering for these two links. No total, no wavelength count, no rate per wavelength — and the same article prints 30,720 as the total for a different cable's four fibre pairs.
- The money in the record is two Treasury guarantees: 3,000,000 euros authorised in December 2002 and 2,000,000 in September 2005, the later one conditional on cancelling the earlier, both attached to investment already made. The route has been outside price regulation since 2009, and no reviewed document prints what anyone pays for capacity on it.
The page that hands you factors and takes back the total
The engineering exists in one document: a 2020 article in the Anuario de Estudios Atlánticos, published through Redalyc, on Canary submarine communications (the article). Its account of the two cables runs in a single sentence: “Cada cable submarino está equipado con 12 pares de fibra óptica y con tecnología SDH, que le permite ofrecer una capacidad equivalente a 30 720 circuitos telefónicos por par de fibra.”
That sentence contains a pair count, a transmission technology, and one capacity unit. It contains no system total. It contains no wavelength count and no bit rate per wavelength. The chain a stranger would multiply to rebuild a capacity — pairs, times wavelengths per pair, times rate per wavelength — has two links missing, so it cannot be assembled from this record at all.
Then the sentence undercuts its own unit. Further on, the same article gives 30,720 telephone circuits as the total capacity of Pencan-5's four fibre pairs. One number, two jobs: a per-fibre-pair unit for Subcan, and a four-pair whole for somebody else. A figure that is simultaneously a unit and a system total for two different systems is not a specification. It is a legacy equivalence that survived an editing pass.
Here is what the factors produce if you multiply them anyway, and this arithmetic is mine, not the publisher's. Twelve pairs times 30,720 circuits is 368,640 circuits per cable — a total no document prints. On the 64 kbit/s channel convention, which the article never states, 30,720 circuits is about 1.97 Gbit/s per fibre pair, about 23.6 Gbit/s per twelve-pair cable, and about 47.2 Gbit/s across both cables. Both routes to that figure agree only because I applied one convention twice. 47.2 Gbit/s is my conversion of a voice-circuit count: it is not a printed design capacity, not lit capacity, and not headroom for sale.
The money arrives after the cable does
Decreto 205/2002, published in the Boletín Oficial de Canarias on 30 December 2002, authorises “aval de Tesorería de la Comunidad Autónoma a la Sociedad Cable Submarino de Canarias, S.A. por importe máximo de tres millones (3.000.000) de euros, para la operación de crédito a concertar para circulante con ocasión de las inversiones realizadas de instalación de dos cables submarinos entre las islas capitalinas” (BOC 2002/173). Read the tense: investments already made. A guarantee for a working-capital credit, arranged after the fact, for at most three million euros. Not an award, not a grant, not a settled project cost.
The second instrument is sharper. Decreto 194/2005, published on 7 October 2005, authorises two million euros for a credit to finance “la inversión ya realizada” in the double fibre-optic link between the two capital islands, and says on its own page that “se encuentran ya operativos” — the two cables are already operating. It also makes the new guarantee conditional on prior or simultaneous cancellation of the 2002 one, which it describes as made “con el mismo objeto” (BOC 2005/198).
The two guarantees are therefore not cumulative, and I will not add them: 3,000,000 minus 2,000,000 is 1,000,000 euros, a ceiling 33.3 per cent lower, for an object the later decree itself calls the same one. The two decrees sit two years, nine months and one day apart. Neither names a lender. Neither says what was drawn. Whether the first was ever called, partially released or simply superseded is not printed anywhere I read.
The only total investment figure in the record is journalism. A news item of 20 March 2002, reproduced in the Hemeroteca de Internautas, records the vessel Tyco Provider finishing the first cable between Las Caletillas and Jinámar, puts “la inversión que suponen estos dos tendidos” at 15 million euros, gives lengths of 143.240 km and 135.686 km, and says the system would be operating from May 2002 (the 2002 item). Fifteen million euros, no itemisation, no public-sector confirmation, and no supplier named — the ship is named, the supplier is not.
The contractor's own page prints no contractor
The company's own account is plain about the asset and silent about its size: two fibre-optic submarine cables on disjoint routes between Tenerife and Gran Canaria, in service since 2002, the first competitor to the incumbent in the wholesale trunk-line market between the capital islands (Empresa). That page prints no capacity, no fibre-pair count, no tariff and no customer.
Its transparency page, marked as updated on 26 May 2026, gives the legal facts: a public limited company incorporated by deed on 24 October 2000, CIF A-38611604, 42.71 per cent held by the Cabildo Insular de Tenerife through CANALINK and 21.36 per cent by the Gobierno de Canarias through SODECAN (Transparencia). It also does two things at once. It states the company is part of the public sector under article 3.1 of the Spanish public contracts law, and it states that the company does not consider itself a “poder adjudicador” under the following paragraphs. Contracting authority sits with its own Consejo de Administración. Its contracts section lists no awards, no bidders and no amounts — and its data series begins on 1 January 2025, twenty-three years after the cables went into service.
Its contracting profile prints no tender either: a page of internal instructions and an outbound link (Perfil del contratante). Those instructions require the profile to be hosted on the Plataforma de Contratación del Sector Público, with the corporate site merely linking to it, and set publication thresholds of 15,000 euros for supplies and services and 40,000 euros for works, with smaller contracts awardable directly (the instructions). The same document prints an earlier shareholding of 44.20 per cent CANALINK and 22.10 per cent SODECAN, which the current page contradicts; I report both figures and neither as the settled history. I did not open the state platform profile. Nothing in this article should be read as a claim about what sits there.
What can be said is narrower and more useful. A Canary submarine-cable tender with money attached is readable in public: a 2024 turnkey unrepeatered system for the islands carries a 42.86 million euro budget and a 42.1 million euro award to Elettra TLC, advertised 14 June 2024 and awarded 19 September 2024 (the tender record). It belongs to Canarias Submarine Link, S.L. — Canalink — not to Subcan, and I cite it only as a control: this is what a published cable award in this region looks like, and it is not what the record of this company's cable contains.
The regulator stopped at the door
The route's regulatory history is a chain of decisions to stop asking. In July 2009 the CMT extended price regulation to nine wholesale trunk leased-line routes and excepted this one: “con excepción de la ruta Tenerife - Gran Canaria, en la que existe el operador alternativo Cable Submarino de Canarias” (Informe eCanarias 2008). In 2014 the competition authority listed “las únicas tres rutas submarinas no reguladas” — Península–Mallorca, Mallorca–Ibiza and Tenerife–Gran Canaria, the last because “existe un cable alternativo de Cable Submarino de Canarias” (C/0606/14). In August 2024 the regulator placed Gran Canaria–Tenerife among four routes “ya desreguladas”, with the nine routes that decision actually deregulated being others (CNMC, 6 August 2024). The 2025 connectivity report keeps the two links in its tables as SUBCAN-1 and SUBCAN-2, owner CSC, in operation since 2002, operative; the same report counts six cables between the two islands owned by Telefónica, Canalink and CSC, and offers a generic span of six to forty-eight fibre pairs across old and modern cables without attributing any count to this system (INF/DTSA/548/23).
The one set of Canary wholesale prices in the record belongs to a different route and a different operator: Telefónica's regulated Península–Canarias leased lines, 2 Mbps at 3,573 euros a month against a CMT-set 2,488, 34 Mbps at 25,781 against 17,949, 155 Mbps at 57,536 against 40,057, 622 Mbps at 109,000 against 75,886, with a 30.38 per cent cut applied in September 2008 — all of it carried in the same 2008 observatory report that exempts this route. Those are not Subcan prices, and the report says so in the same breath as it exempts the route.
Deregulation is a finding that competition existed. It is not a measurement of the price charged, and no reviewed document prints a price, a tariff, an IRU term or a named capacity buyer on the Tenerife–Gran Canaria route.
Two disagreements left standing
The record names the Gran Canaria end of the cable as Jinámar in the 2002 news item, in the 2020 academic account and in the observatory's inventory (OCTSI inventory, updated 31 July 2026). A cable directory in this set names Piedra Santa instead (GeoCables). Lengths move too: 142 and 136 km in the academic account, 143.240 and 135.686 km in the 2002 item, 143 km in the directory. BTW has written about this system twice, once as a case file on the directory records and once on the difference between an owner name and a party bound by contract; neither argument is reopened here. What changed is access: the documents read for this piece are a regional decree, an academic history, a regulator's tables and the company's own transparency page, and they print Jinámar and no supplier at all. The directory fields those earlier pieces quoted remain exactly what they are. I adopt neither landing point and neither length.
Ten things this record does not print
- A total design capacity for either cable — no Gbps, no Tbps, no circuit total for the system.
- A wavelength count or a capacity per wavelength. SDH is the only transmission technology named, so the factor chain cannot be assembled.
- An award, a tender, a successful bidder, a contract signature date or a project cost for the cable supply. The two public instruments are Treasury guarantees, and the later one cancels the earlier.
- A unit price, a tariff, an IRU term or a named capacity buyer on this route.
- A dated quantity of lit capacity.
- Anything at all from the company's state-platform contracting profile, which I did not open; its own pages list no tender, and its transparency contract series begins on 1 January 2025.
- A public-sector confirmation of the 15 million euro figure, which is a 2002 news estimate with no itemisation. The guarantees are maxima, not drawn amounts.
- A verified page layout for the 2025 regulator report: I read it through a search-retrieved rendering rather than a direct open, so its pagination and surrounding tables are unverified.
- A reconciliation of Jinámar against Piedra Santa, or of 142 and 136 against 143.240 and 135.686.
- An undisputed unit. The 30,720 figure is doubtful inside its own document, which prints the same number as the total for a different four-pair system.
That is the count over the fifteen sources I read on 22 November 2026. It is a statement about this record, not about the company's capability.
What the missing total buys
A capacity figure without a perimeter hands the definition to whoever supplies one: a vendor's datasheet, a consultant's slide, a broker's claim, a competitor's marketing. Here the handover is almost complete. The record prints the pair count, prints a unit it cannot defend, prints no total, prints two guarantee ceilings that shrink by a million euros once the cable is already live, and then prints a regulator deciding not to price the route because the cable exists.
Twenty-four years and 247 days after the Tyco Provider finished the first length on 20 March 2002, the number a buyer would actually need — how much this system carries, in which unit, on which perimeter — is still not in the record. What is in the record is a per-fibre-pair figure that belongs, on its own page, to another cable's total.
Print the total with the unit that governs it, or stop calling the figure a specification. Twelve fibre pairs are a design; 30,720 is a borrowed number; the total was never written down.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.