Ofcom has built a fire drill in which the building chooses its own smoke detectors, decides when the alarm counts, and files the incident report in a drawer the public is never invited to open. The UK regulator’s crisis-response amendments to its online-safety codes took effect on 2 November 2026, and their most striking feature is a deadline that arrives before the emergency is over: a covered platform must record its post-crisis analysis when it decides the crisis has ended — or 90 days after it began, whichever comes first. A long crisis gets its post-mortem while the patient is still on the table.

What Ofcom’s crisis-response amendments actually require

The two amendments took effect on 2 November. For these measures, Ofcom defines a crisis as an extraordinary situation posing a serious UK public-safety threat, highly likely to be tied to a significant rise in relevant content on a service. The illegal-content measure covers terrorism, hate, harassment, stalking, threats, abuse and foreign interference. The children’s code amendment runs a parallel structure for child-accessible services and specified abusive, hate-inciting and violent content.

The protocol lives inside the operating team. For a large service at medium risk of a listed harm, or a service of any size at high risk, the code recommends a written internal plan: the provider selects indicators, monitors and revisits them, names a sufficiently senior cross-team response group, and deploys people and systems as soon as reasonably practicable once it judges a crisis occurring or likely.

The platform picks the warning lights

Here is the structural oddity. The provider chooses the sensors, sets the thresholds, and decides when the alarm has fired. If Ofcom sends a public-statement notice, the provider should weigh that alongside its own indicators — but the indicators are still its own. A regulator that hands the trigger to the regulated party is not measuring the fire; it is measuring the platform’s willingness to admit one. The illegal-content amendment supplies the architecture; the platform supplies the judgment about when the architecture matters.

Day 90: the review that outruns the emergency

The 90-day rule is where the design earns its strangeness. A provider records its analysis when it determines the crisis has ended, or 90 days after it began if that is sooner. The record examines key decisions and whether the protocol still works. So a crisis that refuses to end reaches a formal review point while people are still responding to it — a checkpoint that forces a contemporaneous account before memory and incentives harden into one convenient official version. That is the genuine virtue buried in the awkwardness: the review cannot be quietly rewritten after the fact, because the fact is still happening.

A private record and a public notice

Both the written protocol and the later decision analysis need not be published. The public gets the architecture and, at most, a public-statement notice; the operational record can stay behind the platform’s door. Ofcom supplies the frame and the possible spotlight, but the evidence of what actually happened is kept in-house. Whether the day-90 check changes conduct will surface in later regulatory evidence — not in a protocol the public was never promised to see.

The law-enforcement channel and its narrower gate

Ofcom split the original proposal into this protocol and a separate contact channel for law enforcement. That channel applies to large services at medium or high risk of the specified harms, when the provider judges a crisis occurring or likely. A smaller high-risk service can fall within the protocol recommendation without falling within the dedicated-channel measure. That boundary quietly decides who must keep a fixed contact route open for police during a crisis — and who merely keeps a plan in a drawer.

Why the accountability design matters

Strip away the committee language and the question is old and unforgiving: who audits the auditor? A self-declared trigger, a self-authored record and a private file add up to accountability by promise rather than by structure. The provider controls the sensors and the trigger; the regulator controls the recommended architecture and can fire a public notice. That division makes the quality of internal evidence decisive — a poorly chosen indicator delays activation, an undocumented threshold turns the review into a story told by the same team that made the call.

The day-90 checkpoint and the named senior team are the one mechanism forcing a record before the story calcifies.

Ofcom has written a rule that asks platforms to grade their own homework on a deadline. The real test is whether anyone ever marks it down — and on this design, the only people holding the pencil are the ones being graded.