Skip to main content

RIPE NCC · RIR Watchdog

ASN assignment criteria revisited

Start here for the proposal-by-proposal record: what changed, why it mattered, who argued for what, how positions evolved, what was decided, and where the evidence still has gaps.

Source facts

Policy ID
2025-01
RIR
RIPE NCC
Official status
Withdrawn
Introduced
May 6, 2025
Last source update
Nov 22, 2026

Who actually shaped the debate?

10Total participants
8Discussion contributors
2Formal actors
32Discussion messages
5.8Effective participants
84.4%Top-five discussion share
3People covering 50%
5People covering 80%

Policy evolution

2.0
Oct 16, 2025
Source facts ↗

General ASN requirements separated from additional-ASN requests · Version 2 places a unique external routing policy, a RIPE Database routing-policy entry and third-party peering under a general ASNs are required to heading, then separately lists what an additional-ASN applicant must provide. The first ASN remains available without application justification. That does not mean the revised operative text exempts the first ASN from every operational requirement, despite the broader wording retained in the rationale.

Routing-policy registration and off-GRT documentation · The old wording requests a routing policy for an ASN intended to appear in the global routing table and recommends RPSL. Version 2 instead requires a policy defined in the RIPE Database in the general ASN conditions and omits the explicit RPSL recommendation. Documentation of a non-visible purpose remains required for an ASN used outside the global routing table.

Six-month use expectation and intermittent use · Version 2 replaces the mandatory fulfilment of approved application criteria within six months with a should-be-in-use expectation over the same period. It describes intermittent research, measurement and event uses as subject to RIPE NCC discretion and still requires a benefit statement. The interval is unchanged, while the wording and the explicit discretion differ.

Justification for leaving existing ASNs inactive · Version 2 explicitly requires an additional-ASN requester to explain why inactive existing ASNs cannot be used. Approval may still depend on compliance by existing ASNs, now expressly at RIPE NCC discretion; the old separate reference to up-to-date documentation in that approval sentence is removed.

Detailed verification procedure omitted · Version 2 omits the old instructions to verify visible ASNs through the global routing table, request operational proof for off-table ASNs, and treat insufficient proof as failure. It retains discretion over approval based on existing ASN requirements. The omission changes the prescribed verification detail; it does not establish that RIPE NCC can no longer check compliance.

Debate timeline

  1. Public discussion

    [address-policy-wg] DRAFT ASN assignment critera revisited

    32 Discussion messages · 8 Entities

    Source facts ↗
  2. Introduced

    Introduced

    Source facts ↗
  3. Official version

    1.0

    Source facts ↗
  4. Official version

    2.0

    Source facts ↗
  5. Official decision

    withdrawn

    withdrawn

    Source facts ↗

Entities

Last updated:

Loading

Sources and coverage

Public discussion archives

Coverage

Earliest captured: Jun 30, 1992
Latest captured: Nov 14, 2026