Summary

  • LACNIC lists LAC-2025-5, on IPv4 sub-assignment to third parties, as Ratified, with Board ratification on 9 March 2026 and final ratification on 24 March.
  • The final text requires each qualifying sub-assignment to be linked to the recipient ASN in WHOIS and to appear in a public log carrying the block, the recipient ASN, the date and a start-or-end marker.
  • LACNIC’s Policy Development Process puts implementation after ratification. The checked sources show no live log entry, no named block, no sub-assignment, no breach and no implementation date.

A ratified policy is a promise with a date stamp. An operating record is a fact with a receipt.

LACNIC has produced the first. The second is the part that actually disciplines a registry, and it has not arrived yet.

That is not a scandal. It is a distinction, and it is the one most policy coverage quietly skips. LAC-2025-5’s public history preserves a clean route through discussion, consensus assessment, Board ratification and final ratification. That is a genuine institutional result. It is not a licence to invent a named transaction, a live service or an outcome for any holder.

The intended record, by contrast, is refreshingly concrete. The final text limits the mechanism to IPv4 sub-assignments, sets conditions around recipient identity, scale and stated need, and says each qualifying sub-assignment should be recorded in LACNIC WHOIS alongside the recipient ASN. It also calls for a public movement log carrying the block, the recipient ASN, the date, and whether the observed event is a start or an end. Four fields, one bounded object, one timestamp. That is what makes a later record useful: it binds a claim to something you can point at.

Why the ratification label cannot do the log’s job

LACNIC’s own Policy Development Process separates ratification from implementation. Its diagram places implementation after Board ratification, and the policy-development overview describes the Policy Manual as the document containing the policies actually implemented in the region. The sequence does not nullify ratification. It prevents the opposite error — reading a status label as proof that a particular log entry exists, that a particular organisation used the mechanism, or that a particular address block was lawfully sub-assigned.

A registry is a bookkeeper with a good memory, not a legislature. Its authority rests on the ledger being accurate and legible, not on the ledger being loud. When scarce network resources move between organisations, the record needs enough lineage for a stranger to understand the limited fact it captures — and no more. A thin, versioned event receipt does exactly that: policy and version, implementation state, stable entry identity, event type, address block, recipient ASN, publication time, source-system label, correction lineage and a coverage statement. It exposes no contracts and settles no disputes.

It simply lets a reader tell a promise from an event without mistaking the registry record for a title deed or a verdict.

What to watch next

The next meaningful evidence will be an implementation notice, a Policy Manual or changelog update, or a live movement-log entry carrying the fields and the coverage boundary needed to read it. Until one of those appears, describe LAC-2025-5 by its published status and its date — not as proof that a named operating event ever happened.

Ratification is the easy half. The receipt is the half that tells you whether the ledger can be trusted when someone finally has a reason to check.

Sources checked