Summary

  • The notice API records the event starting at 07:00:06 UTC and ending at 10:00:03 UTC, a status-clock duration of 2 hours 59 minutes 57 seconds.
  • The original public capture placed the window at 07:00–08:00. The current text says 07:00–10:00, but its scheduled-update identifier is unchanged and its edit timestamp is 07:45:51 UTC, 45 minutes after the work began.
  • The event has no separate “extended” update. Its next state entry was created when the work began; its final entry says only that maintenance was complete.
  • The component API still supplies 20 service objects, while the notice’s components array remains empty. The status homepage and public notice do not say which service was tested before closure.

The clock changed after the work started

The notice was created on 23 November at 15:28:08 UTC. It gave one hour.

The maintenance state arrived at 07:00:06 the following morning. At that point, anyone checking the old window could reasonably expect the event to close before breakfast.

Fifteen minutes before 08:00, the scheduled update was rewritten. The text now ended at 10:00. Its creation time stayed rooted on 23 November, but its update time moved to 07:45:51.

That is an edit record, not a rescheduling event.

The maintenance then continued for another two hours and 14 minutes. The complete update arrived at 10:00:03, nearly on the new clock.

The same object now presents three hours as the original plan.

No affected service entered the extension

AFRINIC’s status system contains 20 components, including WHOIS updates, database queries, RDAP, DNS, RPKI, MyAFRINIC, mailing lists and websites. None is attached to notice 515392.

The original warning described access to “our services” as potentially experiencing brief, intermittent disruption. The extension did not name a component, endpoint, query or transaction. Closure did not add a result from one.

That leaves operators with a narrow but useful verdict. The event stayed open for three hours.

Whois queries, DNS resolution, RPKI publication, portal access and mailing lists may have passed through different conditions, but the public record cannot distinguish them.

An editable notice is not a rescheduling log

Maintenance windows move. Extensions are normal.

The procedural failure is that the user-facing object lost the evidence of its own change.

A durable record would keep the original schedule immutable and append a second update: “At 07:45, AFRINIC extended the window to 10:00 because of X. Affected component Y remains under test. Rollback remains available.”

That record would preserve both timestamps and tell subscribers what they should reconsider.

The current object preserves neither a visible before state nor a named cause.

AFRINIC can still publish the missing completion material: the reason for extension, the components touched, the checks executed at 10:00, and any remaining service limits. Without that receipt, “complete” is an administrative event in a three-hour green-and-amber fog.

Sources: notice API; public notice; component API; status homepage.