Summary

  • The proposal page says 2026-01 is in “Concluding Phase: Last call,” version 2.0 dated 12 October. The current-proposals index gives the Last Call window as 11 November through 10 December 2026.
  • The policy removes the needs assessment for the first ASN requested by a legitimate direct RIPE NCC IP-prefix holder that has no ASN or only legacy or temporary ASNs. The ASN can be used by a single-homed network, and its routing policy should be registered once the ASN is in use.
  • On 23 November, RIPE NCC Policy Officer Angela Dall’Ara said the published v2 text still contained “additional” where the draft had already removed it. The correction notice says she overlooked the discrepancy while approving publication.
  • RIPE NCC’s impact analysis expects medium software work and slightly more ASN and IPv6 PI requests. Registration Services does not expect proactive monitoring of the requirement to register routing policy after use.
  • The proposal would replace ripe-679. Last Call is not acceptance; the public page records no board decision or implementation date.

One word changed the edge of the exception

The new text starts with a narrow permission. A holder of a prefix allocated or assigned directly by RIPE NCC may get its first ASN without a needs justification. The request cannot use temporary transfers or temporary assignments to qualify. Permanent policy transfers and resources received through mergers or acquisitions can count. The holder may have no ASN, or hold only legacy or temporary ASNs.

The old published v2 then covered “additional AS Numbers” in every other case. That word implied a gap. A first ASN requested outside the qualifying exception might not be an “additional” ASN at all. The 23 November correction broadens the condition to “AS Numbers.” It also turns the routing-policy requirement into one for “an AS Number,” not an additional one.

That is more than a proofreading note. It decides whether an unqualified first-ASN request still faces the ordinary needs assessment. The draft and impact analysis assumed the corrected rule. The published policy text did not.

The correction arrived late in a process already defined by clocks. Last Call began on 11 November. The page now carries a version numbered 2.0 and dated 12 October, plus a separate notice that the text changed on 23 November. RIPE has not issued version 2.1.

The license arrives first; the routing record can follow

For a qualifying holder, the first ASN can exist before its routing policy is written into the RIPE Database. The proposal says the policy “should be registered” once the ASN is in use. RIPE NCC expects no proactive compliance check at that later point. It will tell the requester at approval and may revisit the record during audits or a later ASN request.

The policy’s efficiency claim is straightforward. Out of roughly 32-bit ASN scarcity, the proposal cites fewer than 25,000 assignments to the RIPE region over 20 years and estimates more than 30,000 years before exhaustion at a similar pace. The scarce resource in the short term is administrative attention, not the identifier pool.

The cost claim is also explicit. RIPE NCC expects more ASN requests and more single-homed networks holding an ASN. Opponents expect a larger routing table and a faster equipment replacement cycle for routers that carry full views. Neither side publishes a measured forecast of prefixes, memory or cost.

A correction during Last Call needs a visible version

The correction message is candid. The policy officer saw the issue after a mailing-list comment, checked it against the draft, and changed the live v2 text. She also states that the impact analysis used the draft and remains valid.

The remaining audit question is simple: where is the immutable comparison between the text discussed earlier and the corrected v2? A version label that stays at 2.0 hides a material edit inside the same object. Last Call participants need a diff, a changed timestamp and one statement of whether earlier comments addressed the old or corrected boundary.

The corrected sentence is probably what the proposers intended. Intent makes the typo understandable. It does not make version provenance optional.

Sources: correction notice; proposal; policy draft; current-proposals clock; ripe-679.