Summary

  • Verified baseline: the Number Resource Organization describes AFRINIC as a member-based regional internet registry established in 2005, located in Mauritius and serving Africa; IANA's IPv4 registry records 41/8 as allocated to AFRINIC in 2005-04. Later allocated entries include 102/8 in 2011-02, 105/8 in 2010-11 and 197/8 in 2008-10; 154/8 and 196/8 are separate 1993-05 LEGACY entries administered by AFRINIC, not later allocations.
  • Scarcity rule: AFRINIC's exhaustion page says the current phase is Phase 2 and dates entry to 13 January 2020, with /24 minimum and /22 maximum allocations; the same page also says Phase 2 has not yet been reached, so status must be checked against pool statistics.
  • Cloud’s statutory inclusion is settled. Pricing, service measurements and other proceedings require their own evidence.

IPv4 scarcity made a technical registry into an economic institution. AFRINIC's published rules describe how it rations a finite pool, what it charges members, which services it says it operates, and how it characterises legal disputes. Those pages can establish policy language and institutional claims. They cannot establish market prices, a court's holding, uptime or an unallocated-address count unless the page or an order says so.

The verified registry baseline

The Number Resource Organization describes the five RIRs as not-for-profit, member-based associations that distribute Internet number resources under regional policy. Its RIR table lists AFRINIC as established in 2005, located in Mauritius, serving Africa, with 2,566 members as at 30 June 2026. The NRO page uses the name African Network Coordination Centre; AFRINIC uses African Network Information Centre. IANA's IPv4 address-space registry records 41/8 as allocated to AFRINIC in 2005-04. It also records later allocations to AFRINIC: 102/8 in 2011-02, 105/8 in 2010-11 and 197/8 in 2008-10.

Its 154/8 and 196/8 entries are different: both dated 1993-05, marked LEGACY, and described as Administered by AFRINIC.

IANA also says its IPv4 supply has been exhausted and that recovered space is allocated under post-exhaustion policy.

AFRINIC's own 2018 news item gives one concrete recovered allocation: IANA allocated 45.96.0.0 through 45.111.255.255 to AFRINIC from the recovered pool.

What the rationing rules say

AFRINIC's exhaustion page says Phase 1 began on 31 March 2017. It says Phase 2 began on 13 January 2020 and that, under Phase 2, the minimum allocation or assignment is a /24 and the maximum is a /22. It defines entry into Phase 2 by the final /8 having no more than a /11 of non-reserved space. It describes ticket processing, completeness checks, a contractual compliance check and a 90% efficient-use requirement for additional blocks. Those are rationing rules: they allocate scarcity by documentation and administrative review, not by a market price.

The same page contains a table entry saying AFRINIC has not yet reached Phase 2. That contradiction is not a minor typo for public readers. It determines whether the current page should be cited as an operating rule, a historical announcement or a status claim. The correct public treatment is to quote the rule and the dated announcement, then check current pool statistics and AFRINIC notices before saying which phase is operationally in force. The page also states that by 24 September 2015 APNIC, ARIN, LACNIC and RIPE NCC had exhausted their free pools and were allocating from final /8 space.

That is AFRINIC's summary of peer RIR status, not an independent audit of each peer.

AFRINIC's resources page adds a separate operational statement: a member seeking an additional prefix should have 80% of its total IPv4 allocation in use, should have registered assignments in WHOIS, and should request through MyAFRINIC. The exhaustion page's 90% figure applies to additional blocks under its Phase 2 description. The pages have different scopes; readers should not merge the two into a single universal threshold.

Fees, services and what AFRINIC has not shown

AFRINIC's fee page says fees may change yearly according to operating costs and financial health, subject to Board validation. For LIRs it lists a medium category for allocations at least /16 and below /14 at US$12,800 annual membership. It lists a US$4,000 allocation fee for that band. It gives separate end-site, IPv6, ASN, academic, critical-infrastructure and transfer rules. These are administrative charges for membership and service. They are not evidence of a market price for an address block. The page does not show the 2023 fee schedule or prove that today's schedule applied in 2023.

AFRINIC's service pages describe WHOIS, reverse DNS, an Internet Routing Registry and resource certification. RDAP appears as a navigation link, but the supplied pages do not include a captured RDAP service description. DNSSEC also appears in the site's navigation, without a captured service description of the same kind. Reverse DNS, for example, is described as available on 8-bit IPv4 boundaries, typically /16 or /24, with registered assignments required before delegation. RPKI is described as a framework for verifying the association between IP addresses or ASNs and their holders. These descriptions establish service design.

They do not show that WHOIS, reverse DNS, RPKI or the IRR remained reliable during any particular governance dispute, because uptime and incident data are not supplied.

Settled membership, distinct questions about operations

The 11 June 2025 order in SC/COM/MOT/000399/2025 directed rectification under section 91 of the Companies Act, inclusion of Cloud Innovation in the category of Member and corresponding entries by the Registrar of Companies. It also recorded AFRINIC’s undertaking to correct its records within fifteen days. The Receiver signed that undertaking on 10 June.

The inclusion direction is a final judicial determination, not a suggestion for administrators to reconsider. The same decided issue cannot simply be retried by the Registrar or the Executive. An available appeal, stay or variation must be pursued before a competent court. A request for relief does not itself suspend compliance.

AFRINIC’s bylaws reserve the label “Registered Member” for a director-specific category. Cloud accepts correction of its former classification in that category. The 19 June ruling does not cancel the 11 June directions to include it as a Member. Removing an incorrect category and making the correct entry are parts of the same correction, not grounds for erasing company-law membership.

The 14 May 2026 interim order in SC/COM/WRT/000338/2026 concerns statements that AFRINIC’s communiqué describes as falsely attributing judicial approval to leasing or commercialisation. It requires removal of statements suggesting that approval. AFRINIC’s Receiver obtained that order without notice to Cloud Innovation, over a press release published by LARUS, a separate company. Cloud Innovation’s answer is that a lawful business needs no court approval. It is an interim order, not a final judgment (the interim order of 2026). The 28 May date in the certified rule is the deadline to communicate the respondent’s stand and the return date; the removal direction itself says forthwith. That interim order concerns statements about leasing or commercialisation; it is not the 11 June 2025 membership judgment and does not reopen Cloud Innovation’s final inclusion. Cloud’s response says no one made the alleged claim of court approval and that it learned of the order through AFRINIC’s communiqué rather than formal service.

For the network documents court protection against withdrawal of allocated resources and loss of WHOIS access. The pattern records AFRINIC’s 2021 demand for website monitoring backed by suspension or termination threats. These concrete actions explain Cloud’s insistence on bounded registry powers: networks need stable address use and accurate records, with enforceable rights against the administrator.

Court orders establish rights; current technical measurements establish service performance. Verify WHOIS/RDAP records, route-origin authorisations, reverse DNS and incident history for the relevant resources. Neither a membership judgment nor a service catalogue is an uptime measurement. Administrative fees are not market prices for addresses.

Conclusion

AFRINIC’s own pages set out rationing rules, fees and service designs, yet the same exhaustion page says both that Phase 2 began on 13 January 2020 and that it has not been reached, and they supply no uptime or incident data. Cloud Innovation’s inclusion as a Member under the 11 June 2025 order is a final judicial determination; the May 2026 interim order does not reopen it.

Editorial correction, 11 November 2026: the earlier legal sections treated missing source retrieval as unresolved membership. They have been replaced with the original inclusion order and a separate reading of the May 2026 interim order. AFRINIC’s description of that order is now attributed to AFRINIC and sits beside Cloud Innovation’s answer. This version also removes analysis that excused AFRINIC’s management.