Skip to main content

AFRINIC · RIR Watchdog

IPv4 Soft Landing – bis (Alain Aina)

Start here for the proposal-by-proposal record: what changed, why it mattered, who argued for what, how positions evolved, what was decided, and where the evidence still has gaps.

Source facts

Policy ID
AFPUB-2016-V4-001
RIR
AFRINIC
Official status
Under Discussion
Introduced
Feb 4, 2016
Last source update
Oct 15, 2026

Who actually shaped the debate?

4Total participants
4Discussion contributors
6Discussion messages
3.6Effective participants
100%Top-five discussion share
2People covering 50%
3People covering 80%

BTW Analysis

BTW Analysis

What changed

The proposal moved from DRAFT-01 to version 2.0 while remaining under discussion. Both versions proposed replacing the existing IPv4 soft-landing arrangements with tighter exhaustion controls, including a Phase 1 maximum allocation or assignment of /15, a Phase 2 maximum of /22, a 90% utilization requirement, IPv6 resources as a condition for IPv4 requests, and reserved address space for critical infrastructure and new LIRs or End Users. Version 2.0 also expressly described itself as obsoleting the existing IPv4 Soft Landing Policy, added definitions and a current-phase transition framework, changed the allocation or assignment period from 12 months to 8 months, and clarified one-allocation provisions for new LIRs, End Users, and critical infrastructure. No adoption or effective date is recorded.

What the debate was really about

The proposal was principally about how to ration AFRINIC's remaining IPv4 supply during exhaustion: whether to impose stronger limits and utilization tests, require IPv6 capability alongside IPv4 requests, and reserve portions of the remaining pool for selected categories. The discussion also raised the fairness and practical consequences of allocating space according to organizational size or intended user base, the risk of exhausting the pool too quickly or leaving space unused, and how demand should be assessed for large end users.

Decision vs debate

This was a proposal under discussion, not a recorded policy decision. It was introduced on 4 February 2016 in DRAFT-01 and version 2.0 was also recorded as under discussion. The supplied chronology records a major discussion thread with four messages and three participants in August 2016, while the participation metrics record six messages, four discussion participants, and no formal actors. No decided_at value, adoption event, or effective policy provision is supplied; the proposed rules must therefore not be described as current AFRINIC policy.

Participation concentration

Participation was limited in absolute terms: four discussion participants across six messages, with two single-message participants and two repeat participants. The largest participant contributed one third of messages, while the top five and top ten shares were both 100%; the effective participant count was approximately 3.6. This indicates a small discussion set rather than broad demonstrated participation, although the largest-message share does not by itself show that one participant controlled the debate. Only two participants have recorded stance evidence, and neither has a recorded stance transition.

Chokepoint analysis

The central operational chokepoint was the transition into exhaustion and the allocation of scarce space thereafter. The proposal tied access to a 90% utilization threshold and IPv6 availability, reduced maximum sizes, and created reserved pools: /16 for critical Internet infrastructure, /14 for new LIRs or End Users, and /13 for unforeseen future requirements. It also proposed a rule that, once AFRINIC could no longer meet requests, the exhaustion pool could be replenished with available address space after consultation through the policy discussion mailing list. These mechanisms would make classification, utilization assessment, IPv6 verification, reserve eligibility, and the timing of the exhaustion phases decisive administrative points. Because the proposal was not recorded as adopted, these are proposed chokepoints, not demonstrated features of an operating policy.

Uncertainties

  • The supplied record does not establish whether either draft was accepted, rejected, withdrawn, or superseded by a later decision.
  • The discussion record is small and does not establish community-wide support or opposition to any specific provision.
  • It is unclear from the supplied discussion evidence how participants evaluated the proposed reserves, the 90% utilization rule, the IPv6 condition, or the proposed eight-month allocation period.
  • The proposal describes replenishment of the exhaustion pool after consultation, but the supplied record does not show whether that mechanism was adopted or how it would operate in practice.
  • The supplied chronology extends through June 2017 for discussion activity but contains no corresponding decision event.

Policy evolution

2.0
Under discussion · Under Discussion
Feb 4, 2016
Source facts ↗

From selective amendments to a replacement proposal · Draft 1 amended selected clauses of the existing IPv4 Soft Landing Policy and explicitly obsoleted none. Draft 2 presents a complete replacement of section 3 and says it would obsolete that existing policy. Its restated provisions must therefore be read as a complete proposal; this change in drafting scope is not evidence that the proposal was adopted or that every restated rule was newly introduced.

New-entrant eligibility is explicitly tied to exhaustion · Draft 1 described the new-entrant reserve as available to new LIRs or end users with no prior AFRINIC IPv4 space. Draft 2 additionally defines a new LIR by whether it had received IPv4 space before the exhaustion phase, while retaining the reserve's no-prior-space condition. The two formulations need to be read together: the definition does not itself prove that an organisation which has already received an allocation may draw again from the new-entrant reserve.

Repeat-request wording extends beyond phase 1 · Draft 1 confined its statement of no explicit limit on repeated requests to exhaustion phase 1. Draft 2 uses the broader term Exhaustion Period and expressly adds a one-allocation limit for critical infrastructure using its reserved pool in phase 2, alongside the existing new-entrant restriction. The broad sentence does not erase those specific reserve limits. Draft 2's unfinished opening sentence in section 3.6 leaves a drafting ambiguity that the retained text alone cannot resolve.

Eight-month planning period becomes explicit in the complete text · Draft 2 explicitly includes an eight-month allocation and assignment planning period throughout the policy's life, describing a reduction from twelve months. Draft 1's amendment list did not reproduce section 3.7. This comparison establishes that the rule is now explicit in the replacement draft, but cannot by itself establish that the eight-month rule was absent from the pre-existing policy which Draft 1 would have left partly in force.

Debate timeline

  1. Public discussion

    [rpd] Some thoughts, and some actions required

    1 Discussion messages · 1 Entities

    Source facts ↗
  2. Introduced

    Introduced

    Source facts ↗
  3. Official version

    DRAFT-01

    Under discussion · Under Discussion

    Source facts ↗
  4. Official version

    2.0

    Under discussion · Under Discussion

    Source facts ↗
  5. Public discussion

    [rpd] Policy Proposal Update - IPv4 Soft Landing-bis

    4 Discussion messages · 3 Entities

    Source facts 1 ↗Source facts 2 ↗Source facts 3 ↗Source facts 4 ↗
  6. Public discussion

    [rpd] IPv4 Soft Landing-bis Statement Post AFRINIC-26

    1 Discussion messages · 1 Entities

    Source facts ↗

Entities

Last updated:

Loading

Sources and coverage

Public discussion archives

Coverage

Earliest captured: Aug 4, 2004
Latest captured: Nov 23, 2026