メインコンテンツへスキップ

AFRINIC · RIR ウォッチ

IPv4 Soft Landing – bis (Alain Aina)

提案ごとの記録はここから確認できます。何が変わり、なぜ重要だったのか、誰が何を主張し、立場がどう変化し、何が決定され、どの点で証拠がなお不足しているのかを追えます。

出典に基づく事実

ポリシー ID
AFPUB-2016-V4-001
RIR
AFRINIC
公式ステータス
Under Discussion
提出日
2016/02/04
出典の最終更新
2026/10/15

実際に議論を方向づけたのは誰か?

4参加者総数
4議論参加者
6ディスカッションのメッセージ
3.6有効参加者
100%上位5人の議論比率
250%を占める人数
380%を占める人数

ポリシーの変遷

2.0
議論中 · Under Discussion
2016/02/04
出典に基づく事実 ↗

From selective amendments to a replacement proposal · Draft 1 amended selected clauses of the existing IPv4 Soft Landing Policy and explicitly obsoleted none. Draft 2 presents a complete replacement of section 3 and says it would obsolete that existing policy. Its restated provisions must therefore be read as a complete proposal; this change in drafting scope is not evidence that the proposal was adopted or that every restated rule was newly introduced.

New-entrant eligibility is explicitly tied to exhaustion · Draft 1 described the new-entrant reserve as available to new LIRs or end users with no prior AFRINIC IPv4 space. Draft 2 additionally defines a new LIR by whether it had received IPv4 space before the exhaustion phase, while retaining the reserve's no-prior-space condition. The two formulations need to be read together: the definition does not itself prove that an organisation which has already received an allocation may draw again from the new-entrant reserve.

Repeat-request wording extends beyond phase 1 · Draft 1 confined its statement of no explicit limit on repeated requests to exhaustion phase 1. Draft 2 uses the broader term Exhaustion Period and expressly adds a one-allocation limit for critical infrastructure using its reserved pool in phase 2, alongside the existing new-entrant restriction. The broad sentence does not erase those specific reserve limits. Draft 2's unfinished opening sentence in section 3.6 leaves a drafting ambiguity that the retained text alone cannot resolve.

Eight-month planning period becomes explicit in the complete text · Draft 2 explicitly includes an eight-month allocation and assignment planning period throughout the policy's life, describing a reduction from twelve months. Draft 1's amendment list did not reproduce section 3.7. This comparison establishes that the rule is now explicit in the replacement draft, but cannot by itself establish that the eight-month rule was absent from the pre-existing policy which Draft 1 would have left partly in force.

議論のタイムライン

  1. 公開議論

    [rpd] Some thoughts, and some actions required

    1 ディスカッションのメッセージ · 1 エンティティ

    出典に基づく事実 ↗
  2. 公式版

    DRAFT-01

    議論中 · Under Discussion

    出典に基づく事実 ↗
  3. 公式版

    2.0

    議論中 · Under Discussion

    出典に基づく事実 ↗
  4. 公開議論

    [rpd] Policy Proposal Update - IPv4 Soft Landing-bis

    4 ディスカッションのメッセージ · 3 エンティティ

    出典に基づく事実 1 ↗出典に基づく事実 2 ↗出典に基づく事実 3 ↗出典に基づく事実 4 ↗
  5. 公開議論

    [rpd] IPv4 Soft Landing-bis Statement Post AFRINIC-26

    1 ディスカッションのメッセージ · 1 エンティティ

    出典に基づく事実 ↗

エンティティ

最終更新:

読み込み中

出典と収録範囲

公開討議のアーカイブ

収録範囲

最初の収録: 2004/08/04
最新の収録: 2026/11/23