AFRINIC · Monitoramento de RIR
IPv4 Soft Landing – bis (Alain Aina)
Comece aqui pelo registro de cada proposta: o que mudou, por que isso foi relevante, quem defendeu cada posição, como as posições evoluíram, o que foi decidido e onde ainda há lacunas nas evidências.
Fatos com fonte
- ID da política
- AFPUB-2016-V4-001
- RIR
- AFRINIC
- Status oficial
- Under Discussion
- Apresentada
- 4 de fev. de 2016
- Última atualização das fontes
- 15 de out. de 2026
Quem realmente moldou o debate?
Evolução da política
From selective amendments to a replacement proposal · Draft 1 amended selected clauses of the existing IPv4 Soft Landing Policy and explicitly obsoleted none. Draft 2 presents a complete replacement of section 3 and says it would obsolete that existing policy. Its restated provisions must therefore be read as a complete proposal; this change in drafting scope is not evidence that the proposal was adopted or that every restated rule was newly introduced.
Fatos com fonte −
* Amends: AFPUB-2010-v4-005 (IPv4 soft landing policy) * Obsoletes : NoneFatos com fonte ↗
Fatos com fonte +
16th Feb 2016 AFPUB-2016-V4-001-DRAFT02 (version 2.0) Posted to the rpd mailing list. A complete new version of the section 3 and so the policy proposal now obsoletes the existing IPv4 soft landing policy instead of amending it. Change of the title for clarityFatos com fonte ↗
New-entrant eligibility is explicitly tied to exhaustion · Draft 1 described the new-entrant reserve as available to new LIRs or end users with no prior AFRINIC IPv4 space. Draft 2 additionally defines a new LIR by whether it had received IPv4 space before the exhaustion phase, while retaining the reserve's no-prior-space condition. The two formulations need to be read together: the definition does not itself prove that an organisation which has already received an allocation may draw again from the new-entrant reserve.
Fatos com fonte −
3.9.2 Allocations/Assignments to new LIRs or End-Users A /14 from the final /11 will be held in reserve for exclusive use by new LIRs or End-Users with no prior IPv4 address space from AFRINIC. On application for IPv4 resources, a new LIR or End-User may receive one number resource (maximum /22).Fatos com fonte ↗
Fatos com fonte +
New LIR - A New LIR, is a LIR that assigns address space to 'end-users' and is a member of AFRINIC, but has not been allocated any IPv4 address space prior to the Exhaustion phase.Fatos com fonte ↗
Repeat-request wording extends beyond phase 1 · Draft 1 confined its statement of no explicit limit on repeated requests to exhaustion phase 1. Draft 2 uses the broader term Exhaustion Period and expressly adds a one-allocation limit for critical infrastructure using its reserved pool in phase 2, alongside the existing new-entrant restriction. The broad sentence does not erase those specific reserve limits. Draft 2's unfinished opening sentence in section 3.6 leaves a drafting ambiguity that the retained text alone cannot resolve.
Fatos com fonte −
3.6 If any LIR or End User requests IPv4 address space during Exhaustion: There is no explicit limit on the number of times an organization may request additional IPv4 address space during Exhaustion Phase 1. During exhaustion Phase 2, new LIRs or End-Users can receive only one allocation/assignment from the new LIRs or End-Users reserved pool.Fatos com fonte ↗
Fatos com fonte +
During exhaustion Phase 2, new LIRs or End-Users can receive only one allocation/assignment from the new LIRs or End-Users reserved pool. During exhaustion Phase 2, Critical Infrastructure can receive only one allocation/assignment from the Critical Internet Infrastructure reserved pool. There is no explicit limit on the number of times an organization may request additional IPv4 address space during the Exhaustion PeriodFatos com fonte ↗
Eight-month planning period becomes explicit in the complete text · Draft 2 explicitly includes an eight-month allocation and assignment planning period throughout the policy's life, describing a reduction from twelve months. Draft 1's amendment list did not reproduce section 3.7. This comparison establishes that the rule is now explicit in the replacement draft, but cannot by itself establish that the eight-month rule was absent from the pre-existing policy which Draft 1 would have left partly in force.
Fatos com fonte −
3.2 This policy proposal changes Clauses/Articles 3.6, 3.8 and 3.9 of the current IPv4 Soft Landing PolicyFatos com fonte ↗
Fatos com fonte +
3.7) The current allocation and assignment period of 12 months shall be changed to 8 months. The current allocation and assignment period of 12 months shall be changed to 8 months. This will help to ensure that LIRs request only for resources they need in the short to medium term, and promote fairness in the equitable distribution of the last IPv4 address pool. This allocation/assignment period will remain the same throughout the life span of this PolicyFatos com fonte ↗
Linha do tempo do debate
Discussão pública
[rpd] Some thoughts, and some actions required
1 Mensagens de discussão · 1 Entidades
Fatos com fonte ↗Discussão pública
[rpd] Policy Proposal Update - IPv4 Soft Landing-bis
4 Mensagens de discussão · 3 Entidades
Fatos com fonte 1 ↗Fatos com fonte 2 ↗Fatos com fonte 3 ↗Fatos com fonte 4 ↗Discussão pública
[rpd] IPv4 Soft Landing-bis Statement Post AFRINIC-26
1 Mensagens de discussão · 1 Entidades
Fatos com fonte ↗
Entidades
Carregando
Fontes e cobertura
Arquivos de discussões públicas
Cobertura
Primeiro registro: 4 de ago. de 2004
Último registro: 24 de nov. de 2026
