본문으로 건너뛰기

AFRINIC · RIR 워치독

IPv4 Soft Landing – bis (Alain Aina)

안건별 기록은 여기서 확인하세요. 무엇이 바뀌었고, 왜 중요했는지, 누가 무엇을 주장했는지, 입장이 어떻게 변했는지, 무엇이 결정되었으며, 근거가 아직 부족한 부분은 어디인지 담고 있습니다.

출처 정보

Policy ID
AFPUB-2016-V4-001
RIR
AFRINIC
공식 지위
Under Discussion
도입됨
2016. 2. 4.
마지막 소스 업데이트
2026. 10. 15.

실제로 이 논쟁을 이끈 이는 누구일까?

4총 참여 주체
4토론 참여자
6토론 메시지
3.6실질 참여자
100%상위 5개 토론 비중
250%를 커버하는 인물
380%를 커버하는 인물

정책 변화 과정

2.0
논의 중 · Under Discussion
2016. 2. 4.
출처 정보 ↗

From selective amendments to a replacement proposal · Draft 1 amended selected clauses of the existing IPv4 Soft Landing Policy and explicitly obsoleted none. Draft 2 presents a complete replacement of section 3 and says it would obsolete that existing policy. Its restated provisions must therefore be read as a complete proposal; this change in drafting scope is not evidence that the proposal was adopted or that every restated rule was newly introduced.

New-entrant eligibility is explicitly tied to exhaustion · Draft 1 described the new-entrant reserve as available to new LIRs or end users with no prior AFRINIC IPv4 space. Draft 2 additionally defines a new LIR by whether it had received IPv4 space before the exhaustion phase, while retaining the reserve's no-prior-space condition. The two formulations need to be read together: the definition does not itself prove that an organisation which has already received an allocation may draw again from the new-entrant reserve.

Repeat-request wording extends beyond phase 1 · Draft 1 confined its statement of no explicit limit on repeated requests to exhaustion phase 1. Draft 2 uses the broader term Exhaustion Period and expressly adds a one-allocation limit for critical infrastructure using its reserved pool in phase 2, alongside the existing new-entrant restriction. The broad sentence does not erase those specific reserve limits. Draft 2's unfinished opening sentence in section 3.6 leaves a drafting ambiguity that the retained text alone cannot resolve.

Eight-month planning period becomes explicit in the complete text · Draft 2 explicitly includes an eight-month allocation and assignment planning period throughout the policy's life, describing a reduction from twelve months. Draft 1's amendment list did not reproduce section 3.7. This comparison establishes that the rule is now explicit in the replacement draft, but cannot by itself establish that the eight-month rule was absent from the pre-existing policy which Draft 1 would have left partly in force.

논의 연표

  1. 공개 토론

    [rpd] Some thoughts, and some actions required

    1 토론 메시지 · 1 참여 주체

    출처 정보 ↗
  2. 도입됨

    도입됨

    출처 정보 ↗
  3. 공식 버전

    DRAFT-01

    논의 중 · Under Discussion

    출처 정보 ↗
  4. 공식 버전

    2.0

    논의 중 · Under Discussion

    출처 정보 ↗
  5. 공개 토론

    [rpd] Policy Proposal Update - IPv4 Soft Landing-bis

    4 토론 메시지 · 3 참여 주체

    출처 정보 1 ↗출처 정보 2 ↗출처 정보 3 ↗출처 정보 4 ↗
  6. 공개 토론

    [rpd] IPv4 Soft Landing-bis Statement Post AFRINIC-26

    1 토론 메시지 · 1 참여 주체

    출처 정보 ↗

참여 주체

최종 업데이트:

불러오는 중…

출처 및 적용 범위

공개 토론 기록 보관소

커버리지

가장 처음 수집된 시점: 2004. 8. 4.
최근 수집: 2026. 11. 23.