Saltar al contenido principal

AFRINIC · Vigilancia de RIR

IPv4 Soft Landing – bis (Alain Aina)

Consulta aquí el historial de cada propuesta: qué cambió, por qué fue relevante, quién defendió cada postura, cómo evolucionaron las posiciones, qué se decidió y dónde persisten las lagunas en la evidencia.

Hechos con fuentes

ID de política
AFPUB-2016-V4-001
RIR
AFRINIC
Estado oficial
Under Discussion
Presentada
4 feb 2016
Última actualización de fuentes
15 oct 2026

¿Quiénes marcaron realmente el debate?

4Participantes totales
4Participantes del debate
6Mensajes de discusión
3,6Participantes efectivos
100 %Cuota de los cinco principales
2Personas que cubren el 50 %
3Personas que cubren el 80 %

Evolución de la política

2.0
En debate · Under Discussion
4 feb 2016
Hechos con fuentes ↗

From selective amendments to a replacement proposal · Draft 1 amended selected clauses of the existing IPv4 Soft Landing Policy and explicitly obsoleted none. Draft 2 presents a complete replacement of section 3 and says it would obsolete that existing policy. Its restated provisions must therefore be read as a complete proposal; this change in drafting scope is not evidence that the proposal was adopted or that every restated rule was newly introduced.

New-entrant eligibility is explicitly tied to exhaustion · Draft 1 described the new-entrant reserve as available to new LIRs or end users with no prior AFRINIC IPv4 space. Draft 2 additionally defines a new LIR by whether it had received IPv4 space before the exhaustion phase, while retaining the reserve's no-prior-space condition. The two formulations need to be read together: the definition does not itself prove that an organisation which has already received an allocation may draw again from the new-entrant reserve.

Repeat-request wording extends beyond phase 1 · Draft 1 confined its statement of no explicit limit on repeated requests to exhaustion phase 1. Draft 2 uses the broader term Exhaustion Period and expressly adds a one-allocation limit for critical infrastructure using its reserved pool in phase 2, alongside the existing new-entrant restriction. The broad sentence does not erase those specific reserve limits. Draft 2's unfinished opening sentence in section 3.6 leaves a drafting ambiguity that the retained text alone cannot resolve.

Eight-month planning period becomes explicit in the complete text · Draft 2 explicitly includes an eight-month allocation and assignment planning period throughout the policy's life, describing a reduction from twelve months. Draft 1's amendment list did not reproduce section 3.7. This comparison establishes that the rule is now explicit in the replacement draft, but cannot by itself establish that the eight-month rule was absent from the pre-existing policy which Draft 1 would have left partly in force.

Cronología del debate

  1. Debate público

    [rpd] Some thoughts, and some actions required

    1 Mensajes de discusión · 1 Entidades

    Hechos con fuentes ↗
  2. Presentación

    Presentación

    Hechos con fuentes ↗
  3. Versión oficial

    DRAFT-01

    En debate · Under Discussion

    Hechos con fuentes ↗
  4. Versión oficial

    2.0

    En debate · Under Discussion

    Hechos con fuentes ↗
  5. Debate público

    [rpd] Policy Proposal Update - IPv4 Soft Landing-bis

    4 Mensajes de discusión · 3 Entidades

    Hechos con fuentes 1 ↗Hechos con fuentes 2 ↗Hechos con fuentes 3 ↗Hechos con fuentes 4 ↗
  6. Debate público

    [rpd] IPv4 Soft Landing-bis Statement Post AFRINIC-26

    1 Mensajes de discusión · 1 Entidades

    Hechos con fuentes ↗

Entidades

Última actualización:

Cargando

Fuentes y cobertura

Archivos de debates públicos

Cobertura

Primera captura: 4 ago 2004
Última captura: 23 nov 2026