Summary

  • Siemens Energy's SGT-800 page prints gross simple-cycle efficiency of 41.1 per cent and a gross heat rate of 8,759 kJ/kWh at 62 MW under a footnote naming ISO ambient conditions, natural gas fuel and no intake or exhaust loss, and naming no lower or higher heating value anywhere on the page.
  • ISO 3977-2:2023, the standard those ISO conditions point at, requires gas-turbine ratings to be assessed on the lower heating value of the fuel; German gas billing runs on the higher one, and the Munich network operator's 2024 sheet prints both values for the same gas at a factor of 1.1073.
  • Reading the printed 41.1 per cent as the lower-heating-value figure the standard requires of it, and restating it on the basis the bill uses, gives 37.1 per cent, 9,699 kJ/kWh and 9,193 Btu/kWh, all my arithmetic from printed numbers; the HL class's ">64% combined cycle efficiency" becomes 57.8 per cent.
  • "Capable to burn 75% hydrogen" is a share by volume whose energy share is 47.4 per cent, and the only page in the family that performs that conversion is a brochure's carbon-dioxide column, where the printed decline tracks the energy share rather than the volume headline.
  • Two filed permits repeat the missing word: South Carolina pairs 17 MW with 158 MMBtu/hr and 54 MW with 453.4 without stating a basis, and Utah prints "16.53 MW @ ISO" beside "159 MMBtu/hr @ ISO" on twelve turbines before computing its emissions worst case at 11.49 MW, 30.5 per cent below the rating.

The sheet, and the word that is not on it

Siemens Energy's product page for the SGT-800 gives five ratings in one table. At 62 megawatts it prints gross simple-cycle efficiency of 41.1 per cent beside a gross heat rate of 8,759 kilojoules per kilowatt-hour; at 57, 56, 50 and 45 megawatts the pairs run 40.1 and 8,970, 39.5 and 9,123, 39.4 and 9,147, 38.4 and 9,381. Beneath the table: "All performance values are based on standard design, ISO ambient conditions and natural gas fuel. No intake or exhaust loss." (SGT-800 product page)

Divide 3,600 by 8,759 and you get 0.4110. The efficiency and the heat rate are one measurement printed twice, and that is worth establishing at the start because it settles what is and is not a fact here. The page has not measured two things and reported both. It has measured one thing and converted it. There is no independent heat rate to check the efficiency against, and no independent efficiency to check the heat rate against. What is independent is the basis: the ambient condition at which the output was established, the fuel whose thermal energy forms the denominator, and the pressure losses the rating excludes.

The footnote disposes of the first clearly and the third with a zero. It says nothing whatever about the second.

That silence is not peculiar to this page. The same five rows, on the SGT-800 poster, sit under the same footnote (SGT-800 poster, ENG 230127). The 2017-era datasheet for the same machine repeats the conditioning sentence and the fuel, though not the loss clause (SGT-800 datasheet TH 566-160258). The HL-class datasheet, ten years of frame size later, still prints ISO ambient conditions and adds only that "actual performance will vary with project-specific conditions and fuel" (HL-class datasheet).

A third-party-hosted sales sheet for the 47.5 and 50.5 megawatt versions does the one thing none of those pages does: it names the loss allowance as two numbers, "Inlet duct pressure loss: 0 mbar" and "Outlet duct pressure loss: 0 mbar", and adds ambient pressure 1.013 bar(a), 60 per cent relative humidity, 50 Hz, 0.9 power factor and the fuel as "100% CH4" (SGT-800 performance specification, 47.5 and 50.5 MW). Its heat rates are 9,557 and 9,407 kJ/kWh for the same nominal ratings where Siemens prints 9,547 and 9,389. Ten and eighteen kilojoules, unexplained on either sheet, on a quantity of about 9,500. I flag it and move on, because it is not the missing word; it is a reminder that even the conventionally printed part of a rating drifts between documents.

One Siemens page in this whole set names a heating value. The SeaFloat package document prints "Gas fuel supply 30 Bar(a), 25ºC, 48.6 MJ/kg LHV (Siemens Energy standard - gas composition)", and quotes its performance at 25 °C ambient air, 25 °C sea water and 60 per cent relative humidity rather than at ISO conditions, at roughly 56 per cent gross plant efficiency (SeaFloat SCC-800 technical information). Two things follow. The company knows the vocabulary. And on the one page where it uses the vocabulary, it is describing a different object: a packaged plant on a barge, evaluated at a site condition, not a 50 Hz nameplate at ISO. The catalogue rating inherits nothing from it. A basis does not travel by association, which is precisely why it has to be printed.

What the standard actually fixes

ISO 3977-2:2023 is the document the phrase "ISO ambient conditions" points at, and in the preview text it fixes intake at 101,325 kPa total pressure, 15 °C total temperature and 60 per cent relative humidity at the compressor intake flange, with 101,325 kPa static exhaust at the turbine exhaust flange (ISO 3977-2:2023 preview). Then it does something no datasheet in the set does: it says how the denominator is measured. "The performance ratings of gas turbines shall be assessed on the net specific energy, or lower heating value (LHV), of the fuel used."

The same document supplies the constants that make the arithmetic possible. Default LHV of 50,033 kJ/kg for 100 per cent methane, 119,907.4 kJ/kg for 100 per cent hydrogen, 42,000 kJ/kg for liquid fuel. And a sentence that explains the zero on the sales sheet: ISO ratings neglect inlet and exhaust pressure drop, while site ratings allow for it.

So the catalogue figure is a rating under a standard that specifies lower heating value, printed on a page that names ISO conditions and natural gas and stops. A reader who knows the standard supplies the missing word himself. A reader who does not has no way to know that 41.1 per cent is a lower-heating-value figure, or, strictly, no way to know that it is not. I want to keep that distinction sharp, because it is the difference between a finding and an accusation. The page does not print a basis, and a page that prints no basis cannot be convicted of printing the wrong one.

What can be said is narrower and worse: the most consequential word in the number is absent from the document that sells it, and present in the standard the document invokes by reference. Whether Siemens Energy actually computed these five rows on the LHV basis is stated nowhere in the twenty-three documents I read. The standard binds the rating; the page does not repeat the binding; the buyer cannot tell which rule produced the number he is being quoted.

What the bill does

Now the other end of the ratio, where the energy is not rated but invoiced. Natural gas is sold by energy, and the convention at the meter is not the turbine's. The US Energy Information Administration defines Btu per cubic foot as the total heating value produced by combustion when the products of combustion are cooled to the initial temperature and "the water formed by combustion is condensed to the liquid state", adding in parentheses "(Sometimes called gross heating value or total heating value.)" (EIA glossary, Btu per cubic foot). The agency is explicit that this is a choice rather than a fact of nature: its conversion factors "represent the gross (or higher or upper) energy content of the fuels", gross is the convention in the United States and net the convention in European energy calculations, and the difference is the energy needed to vaporise the water created during combustion, "generally ... 2% to 10%" (EIA British Thermal Unit and other conversion factors).

Pipelines print the same basis in their tariffs. Northwest Pipeline's general terms and conditions define "Gross Heating Value: The total Btu content for a cubic foot of gas on a dry basis as determined by calculation from compositional analysis using physical properties of gases at 14.73 psia and 60 F as prescribed by the American Gas Association", with a minimum of 985 Btu and a 985 to 1,110 Btu band at La Plata receipt points (Northwest Pipeline FERC gas tariff). PG&E's gas rule prints the billing arithmetic instead of the basis word: "The BTU factor applied to the metered volume will be determined from the average heating value of gas deliveries to that BTU area divided by 1,000", over a normal range of 750 to 1,150 Btu per standard cubic foot at 14.73 psia and 60 °F dry basis, with therms equal to metered volume times that factor (PG&E Gas Rule No. 2).

What the factor is worth in the field: EIA reports that dry natural gas delivered to consumers in the United States averaged 1,036 Btu per cubic foot in 2023, that Texas averaged 1,018, and that gas-fired appliances generally see between 950 and 1,100 (EIA Today in Energy, 17 September 2024). One thousand and thirty-six Btu per cubic foot, times 35.3147 cubic feet to the cubic metre, is 36,586 Btu per cubic metre, about 38.6 megajoules, mine from two printed numbers.

The German case is where a German turbine seller's home market and this arithmetic meet, because Germany prints both values on one sheet. SWM Infrastruktur's published 2024 annual mean for its Munich H-group network gives, for the same gas, Brennwert HS,n of 41.483 MJ/m³ (11.523 kWh/m³) beside Heizwert HI,n of 37.463 MJ/m³ (10.406 kWh/m³), with Wobbe index 53.159 MJ/m³, normal density 0.787 kg/m³ and relative density 0.609, describing the gas as family 2 group H per DVGW G 260 (SWM Infrastruktur, Erdgasbeschaffenheit Jahresmittel 2024). Divide one by the other and 41.483 / 37.463 is 1.1073. The kilowatt-hour column returns the same ratio, 11.523 / 10.406 is 1.1073, which is a useful check because the sheet prints both columns.

Two qualifications belong here, beside the number, not in a closing paragraph. The sheet labels its own figures "Orientierungswerte, nicht zur Abrechnung geeignet", guidance values not suitable for billing, so it is a published physical pair and not any customer's billed factor. And the regulator describes a different quantity again: the Bundesnetzagentur states that "Für die Abrechnung wird aus den gemessenen Einspeisebrennwerten des Abrechnungszeitraums ein Durchschnittsbrennwert ermittelt", that the local network operator must publish the applicable Brennwert for each month by the tenth of the following month, that the unit is kWh/m³, that H-gas runs about 10 to 13.1 kWh/m³ against 8.4 to about 11.2 for L-gas, and that the Brennwert includes the condensation heat of the flue gas (Bundesnetzagentur, Brennwert (Gas)).

Put those two documents beside each other and the ownership structure is visible without any arithmetic of mine. The regulator names the basis the bill uses. The network operator prints both values for one gas. The turbine seller prints neither. Every party is accurate inside its own convention, and the conventions are not the same convention.

Restating the number on the basis the bill uses

Here is the conversion that nobody in the twenty-three documents performs for the turbine. 41.1 per cent divided by 1.1073 is 37.1 per cent. 8,759 kJ/kWh multiplied by 1.1073 is 9,699 kJ/kWh. In the imperial column the same operation takes 8,302 Btu/kWh to 9,193. All mine, from the printed 41.1 per cent, the printed 8,759 and the printed pair 41.483 and 37.463.

Run it across the family and the direction is consistent. The HL class's ">64% combined cycle efficiency" becomes 57.8 per cent. The machine did not get worse between the two sentences. The fuel it is being credited with changed from the one the standard counts to the one the supplier invoices, and eleven per cent of the denominator moved with it.

Read the HL datasheet on its own and you can see that Siemens knows how to disclose a boundary when it wants to. It prints 42.8 per cent simple cycle at 8,411 kJ/kWh and 42.6 at 8,451 for the 60 Hz machine, combined cycle 870 MW at >63 per cent net with <5,714 kJ/kWh, and then the one footnote in the set that draws a line: "Simple cycle ratings are gross values at ISO ambient conditions. Combined cycle ratings are net values at ISO ambient conditions." That is a real disclosure, and it is a disclosure on a different axis.

Gross versus net output is about where the meter sits, at the generator terminals or after the plant's own auxiliaries. Lower versus higher heating value is about what is in the denominator. The datasheet separates the first pair meticulously and prints nothing at all about the second.

The 2017-era sheet makes the same point by accident of history. It quotes SCC-800 combined cycle as net, 53.8 to 58.0 per cent for a single-shaft train and 54.7 to 58.6 for two, with net plant heat rates of 6,693 to 6,207 and 6,583 to 6,143 kJ/kWh (SGT-800 datasheet). The current product page quotes the same three-pressure non-reheat bottoming cycle as gross, up to 60.6 per cent, with gross plant heat rates of 5,941 to 6,294 (SGT-800 product page). Four points of plant efficiency separate the two quotations. Some of that is the gross-to-net boundary; some may be a decade of engineering. The record does not let me allocate it and I will not pretend otherwise. What the record does show is that the old sheet's 57 MW row, 40.1 per cent at 8,970 kJ/kWh, is identical to the current page's 57 MW row, so that sheet was extended rather than revised and both quotations continue to circulate side by side.

What a million Btu buys, since that is closer to how a buyer thinks. At 9,193 Btu/kWh, one million Btu yields 108.8 kilowatt-hours. At the brochure's 8,302, the same million yields 120.4. The eleven and a half kilowatt-hours between them are the factor, and the factor is mine.

The hydrogen share printed in the unit that flatters it

The SGT-800 poster carries a line the product page does not: "Capable to burn 75%* hydrogen * H2 content in natural gas (volume percent)" (SGT-800 poster). Note what the asterisk exists to do. It tells you which percentage is meant: a volume percentage.

A volume percentage of hydrogen is not a small share of energy, but it is a much smaller share of energy than of volume, because hydrogen carries less energy per normal cubic metre than methane. From the standard's own defaults and standard gas densities: 119,907.4 kJ/kg times 0.08988 kg/Nm³ is 10,777 kJ/Nm³ for hydrogen, and 50,033 times 0.717 is 35,874 kJ/Nm³ for methane. A 75 volume per cent blend is 8,083 kJ of hydrogen against 8,969 for the methane left in it, which is 47.4 per cent by energy. Fifty volume per cent is 23.1. Thirty is 11.4. Mine, from the printed constants.

Is that conversion ever performed in the record? Once. The Hydrogen Power Plants brochure prints CO2 of 311 g/kWh on methane, 275 at "Methane + 30 % vol H₂" and 239 at "Methane + 50 % vol H₂" (Hydrogen Power Plants, technical data). 311 to 275 is minus 11.6 per cent; 311 to 239 is minus 23.2. Set those against the energy shares and the correspondence is not close, it is the same number twice: 11.4 and 23.1. The carbon column tracks the energy share almost exactly, which is what it must do, because the carbon in the exhaust comes from the methane and it is the methane's energy that fills the denominator. So the one place in the entire family where a volume share becomes an energy share is an emissions calculation. Not the efficiency table. Not the capability claim. Not the fuel-system page.

The rest of the hydrogen record fits that division of labour. The October 2021 capability document states the released figure as 75 volume per cent for the SGT-600, SGT-700 and SGT-800 on third-generation DLE combustion, records a full engine test at 50 volume per cent and 25 ppm NOx at derated load, and notes that the Wobbe index of hydrogen blends stays within the natural-gas band of 37 to 49 MJ/Nm³ (Hydrogen capability, SGT-600/700/800). That last clause is the mechanism, and it explains why the volume unit is the honest unit for the combustion engineer: a burner is tuned to Wobbe index, and a blend that stays inside the natural-gas Wobbe band is a blend the existing combustion system can be expected to hold. The white paper puts figures on the families, up to 30 volume per cent for the 2000E, 4000F, 5000F and 8000H, up to 50 for the 9000HL's ACE system, 100 per cent hydrogen in DLE mode committed for 2030, and then adds the sentence that decides which units actually carry a number: for already installed machines the current capability is given in the gas turbine manual and may vary by site (hydrogen white paper). The 9000HL poster, meanwhile, prints "50%vol. hydrogen co-firing capability" beside ">64% combined cycle efficiency" and no reference-condition footnote at all (SGT5-9000HL poster).

So the buyer reading "75% hydrogen" and the buyer reading "47.4 per cent of the energy" are reading the same test in two different offices. Neither number is wrong. One of them will end up in a fuel contract and the other in a carbon forecast, and no page in this record reconciles them for a customer.

What the buyers filed

Behind-the-meter generation bought to feed data centres reaches the public record through air permits, and permits are where the missing word becomes expensive, because a permit exists to fix quantities.

South Carolina's construction permit CP-50000422 v1.0, issued on 18 September 2026 on an application received on 4 March 2026, authorises five simple-cycle 17 MW natural-gas turbines and six simple-cycle 54 MW turbines with selective catalytic reduction and oxidation catalyst, listed as five 17 MW Baker Hughes units under equipment ID 17T and six 54 MW General Electric units under 54T (SCDES construction permit CP-50000422). The permit prints no per-turbine fuel heat input, and no ambient basis for the megawatts. What it does print is the federal applicability table it applies, and that table is keyed to "Combustion Turbine Base Load Rated Heat Input (HHV) >50 MMBtu/h and ≤850 MMBtu/h". The instrument knows the word "HHV" well enough to use it for the federal threshold, and does not use it beside the facility's own numbers.

The Statement of Basis for the same permit is the document that prints the pairs. In the draft filed with the South Carolina Public Service Commission on 22 June 2026 in Docket 2026-158-E, stamped DRAFT and ELECTRONICALLY FILED on page 1 of 16, and again in the version dated 18 September 2026: "The 17 MW turbines have a capacity of 158 MMBtu/hr each and the 54 MW turbines have a capacity of 453.4 MMBtu/hr each" (SCDES Statement of Basis, final; draft as filed, Docket 2026-158-E). Later in the same document the quantities are renamed for what they are, "The 17 MW (158 MMBtu/hr heat input) turbines" and "The 54 MW (453.4 MMBtu/hr heat input) turbines". The basis word never appears. Neither does an ambient condition. What does appear is a factor of 1/1038 Btu/scf in the sulphur-dioxide arithmetic, which is the dry gross heating value of natural gas out of AP-42 Chapter 1.4, and which implies the basis without ever asserting it.

Divide the pairs yourself. 158 MMBtu/hr over 17 MW is 9,294 Btu/kWh, which is 36.7 per cent on whichever basis the heat is printed. If the missing word is "higher" and the megawatt is what a buyer would call capacity, then that 36.7 per cent is a lower-heating-value efficiency of the same species as the catalogue's 41.1: restated on the gross basis it is 33.2 per cent, and it is 40.6 per cent in the other direction, if the printed heat was gross and the machine rated net. I show both because without the word both are arithmetically available and only one is true. The 54 MW unit: 453.4 over 54 MW is 8,396 Btu/kWh, 40.6 per cent.

The plant total: five times 158 plus six times 453.4 is 3,510.4 MMBtu/hr against 409 MW of nameplate, which is 8,583 Btu/kWh, and at 8,760 hours a year, 30,751,104 MMBtu. All mine.

Two sentences in that document do more work than the arithmetic. "These turbines will provide continuous on-site power to the facility. The facility will not be selling power to the grid." A captive plant, built behind the meter, is the configuration in which the buyer pays the gas bill directly and the machine's efficiency and the fuel's billed energy meet on one ledger with nobody between them.

The same document also states that vendor datasets below 0 °F were excluded as unrepresentative of South Carolina, and derives the 17 MW units' particulate emissions from vendor data for a 16.5 MW turbine multiplied by a safety factor of 1.2. Those are two indirect admissions that the megawatts printed beside the heat input are not the megawatts at every hour of the year.

Utah says it in one line, twelve times, and with a condition attached to both halves. The Approval Order DAQE-AN162210002-25 of 18 December 2025 prints on a single permitted-equipment line: "Twelve (12) Turbines Fuel: Natural Gas Rated Output: 16.53 MW @ ISO each Rated Heat Rate: 159 MMBtu/hr @ ISO, each" (Utah Approval Order DAQE-AN162210002-25). Both numbers carry the same condition, which is more than South Carolina manages. Two things are still missing. The label says "Rated Heat Rate" while the units are a heat input rate in MMBtu/hr, so the sentence names one quantity and measures another. And no basis word appears. The order also caps the site at 108 MW of bus capacity, limits the turbines to 115.56 MW gross, that being 108 times 1.07 for a 7 per cent auxiliary load, metered at generator terminals, and limits annual energy to 1,012,305.6 MWh.

Then the same file does what a competent engineer does, and undoes the headline in the process. 159 over 16.53 is 9,619 Btu/kWh, 35.5 per cent. The engineer review of 4 November 2025 that preceded the order carries the identical "@ ISO" pair and adds how potential-to-emit was actually modelled: vendor operating scenarios across ambient temperatures and load levels, the worst case at −4 °F and 75 per cent load, eleven turbines at 11.49 MW each (Utah engineer review, Project No. N162210002). 11.49 divided by 16.53 is 0.695. The operating point that decides the emissions limit sits 30.5 per cent below the rating, in the same document family, and no heat balance or correction curve in either document lets a reader walk from one figure to the other.

That permit pair is the whole mechanism in miniature. The rated number is one condition. The enforced number is another condition. The fuel that connects them is billed on a third basis that neither document names.

What this reading does not settle

Whether the SGT-800 page's 41.1 per cent was computed on the lower heating value. The page prints no basis, the standard binds ISO ratings to LHV, and the page says "ISO ambient conditions" without claiming conformance to the standard that defines them. The gap is real and I am not going to close it by dressing an inference as a fact.

Why the third-party zero-loss sheet prints 9,557 and 9,407 kJ/kWh where Siemens prints 9,547 and 9,389 for the same nominal ratings, on a document that states its own zero-pressure-loss assumption and carries no reconciling sentence.

Whether South Carolina's 158 and 453.4 MMBtu/hr are on the higher or the lower heating value, and at what ambient temperature. The 1/1038 Btu/scf factor implies dry gross. Implying is not printing.

Whether Utah's 159 MMBtu/hr is a heat rate mislabelled or a heat input. The label says one thing and the unit says another, and nothing in the file resolves it.

How the 17 MW nameplate in South Carolina relates to the 16.53 MW ISO rating in Utah. No page read relates them, even though South Carolina's particulate calculation is built on a 16.5 MW vendor figure, which is close enough to be suspicious and not close enough to be a bridge.

What the billed Brennwert is for any specific network. SWM's annual mean is labelled by its own publisher as unsuitable for billing, and the monthly figure that a network operator must publish by the tenth of the following month is not in this record at all.

What any of this costs. No natural-gas price was read, so the arithmetic stops at energy delivered per unit of energy billed and never reaches a currency figure. I would rather stop there than invent a price.

Why petitioners in the South Carolina docket describe the same project as roughly 450 to 457 MW where the permit's own nameplate sums to 409 MW. Nothing read reconciles the two.

Which exhaust temperature belongs to the 45 MW rating: 547 °C on the poster, 574 °C on the product page, and the poster's own imperial figure of 1,065 °F converts to about 574. One of the two metric numbers is a transcription slip, and which one is not established.

Which hydrogen capability figure is current. A 2021 ASME survey cited elsewhere puts the SGT-800's DLE capability at 60 volume per cent against the seller's 75. Capability is combustion-system and release-status specific, and the white paper sends installed units to the manual, which I did not read.

The question a buyer can ask

It is one word long, and it is the word missing from every sheet in this family.

What heating value? Ask it of the efficiency, ask it of the heat rate, ask it of the MMBtu/hr on a permit application, and ask it of the volume share on the hydrogen line. Then ask the second question, the one the standard cannot answer for you: at what ambient temperature, and with what inlet and exhaust pressure drop, was that megawatt established. The SGT-800 page answers the second with ISO conditions and a zero. The sales sheet answers it with ambient pressure, relative humidity, power factor and two duct-loss rows reading 0 mbar. Neither answers the first.

The buyer who asks both gets a number he can put beside his gas bill. The buyer who asks neither gets 41.1 per cent, a figure that is accurate, printed by a company that knows exactly what it means, and denominated in a unit his supplier does not invoice. Nothing in this record is a misrepresentation. It is a handover at a boundary where the units change, and the change is printed on neither side of the handover.

The Siemens Energy entity behind the SGT-800 range is filed in our directory at Siemens Energy Management GmbH trading as Siemens Energy Global GmbH & Co. KG.