Summary

  • ITU-T G.8271.1's own example allocation closes on the 1,100 ns network limit to the nanosecond in both class columns, and marks holdover NA in the scenario that meets the limit. The scenario that does fund holdover overruns that limit by 250 ns, and the standard says so.
  • Microchip's application note calls 400 ns a PRTC holdover requirement while quoting a table the standard titles an example; its brochure attaches 43 hours to that 400 ns figure while its own holdover table puts 43 hours in the 1,1 µs column, which is the entire network budget.

The instinct is to look for the page that never adds the pieces up. There is a page that does, and it is in the standard, and it is merciless.

The table that does the arithmetic

ITU-T G.8271.1 carries, in Appendix V, a grid titled "Example of time error allocation for class A and B clocks" (G.8271.1 (2022) Amd. 3, 05/2025). It has rows for the reference clock's own error, for re-arrangements and holdover in the network, for the dynamic time error of the chain of boundary clocks, for their constant time error, for the constant time error of the links, and then two rows on the far side: rearrangements in the end application, the end application's own noise, and a total. It has three columns, one per failure scenario. Scenario (a) is a grandmaster rearrangement, scenario (b) a short GNSS interruption, scenario (c) a long holdover, one day for example.

Read column (a) additively. Class A: 100 nanoseconds of reference error, nothing in the holdover row, 200 nanoseconds of dynamic error across the chain, 550 nanoseconds of constant error across the clocks, 250 nanoseconds across the links. That is 1,100 nanoseconds. Class B, same column: 100, nothing, 200, 420, 380. Also 1,100. Both columns land exactly on the network limit, not near it, not under it by a margin an engineer could bank. Then the end application's 250 nanoseconds for rearrangements and its 150 nanoseconds of noise carry the same column to exactly 1,500 nanoseconds at reference point E.

That last figure is where most of this industry's arithmetic actually happens, so name it properly. G.8271 assigns class 4 applications a time error requirement of 1.5 microseconds at reference point E, the end-application output, measured against a common time reference (G.8271 (2020) Amd. 1, 08/2024). G.8271.1 sets the network limit at reference point C, at the edge of the network, at 1,100 nanoseconds — a maximum absolute low-pass-filtered time error, through a first-order 0,1 Hz filter, for deployment case 1 (G.8271.1 Amd. 3). The 400 nanoseconds between them is not slack in the network. It is the end application's own allowance: 250 for rearrangements and 150 for noise, spelled out in the same table.

A ceiling certifies a node. A limit constrains a chain.

The per-node figures come from a different recommendation with a different job. G.8273.2 defines the timing characteristics of telecom boundary clocks and telecom time synchronous clocks, and its Table 7-1 gives the unfiltered maximum absolute time error at the protocol and one-pulse-per-second outputs as 100 nanoseconds for class A, 70 for class B, 30 for class C, and, for class D, for further study (G.8273.2, 06/2023). The 5 nanosecond figure that everybody quotes for class D is not that row. It is the class D limit in Table 7-2, measured through a first-order 0,1 Hz low-pass filter. Table 7-3, the constant time error estimated by averaging over 1,000 seconds, gives class A plus or minus 50 nanoseconds, B plus or minus 20, C plus or minus 10, D again for further study. The 2025 amendment to the same recommendation leaves all of it standing: class D still carries a 5 nanosecond filtered limit and still has no normative unfiltered ceiling and no constant-error figure (G.8273.2 Amd. 2, 11/2025).

Two details in that recommendation do more work than they look. The first is the averaging window: a constant time error number is the error left after averaging 1,000 seconds of time-error samples, so it describes a clock over a thousand seconds rather than a packet. The second is the packet rate behind those tables. The minimum observation interval is set by 16 packets per second, or by the one-pulse-per-second signal, and the same note governs the populated class tables rather than a different rate per class. The telecom profile that supplies that rate names it directly: Sync at a nominal 16 packets per second, Delay_Req and Delay_Resp at 16, Announce at 8 (G.8275.1, 11/2022). At 16 per second, the 1,000 second window is 16,000 samples, one every 62.5 milliseconds. That is my division of a printed window by a printed rate, and it fixes the scale of the thing: a constant time error ceiling is a property of an average over a thousand seconds, and no single packet can be inside or outside it.

So the industry has two documents with two different verbs. One certifies a box; one constrains a path. The arithmetic that joins them exists, and it is the grid in Appendix V. Nobody has to invent it. What nobody has to do either is apply it, because the two figures a buyer sees — the class on the node and the 1.5 microseconds on the slide — sit at opposite ends of a chain, printed by different parties, in different units of scope.

What the standard's own notes assume

The Appendix V grid does not hide its assumptions; it prints them under the table. Note 1 builds the Class A clock row out of 50 nanoseconds multiplied by ten boundary clocks plus 50 nanoseconds intra-site. Note 2 does the same for Class B with 20 nanoseconds multiplied by twenty clocks plus 20. Note 3 defines the link row as the constant time error budget for the links, being the remainder after any asymmetry compensation has been included. Note 6, under the following table, restricts both tables to backhaul and excludes fronthaul.

That first note is the whole argument in miniature, and it is worth saying in plain words. The 550 nanoseconds the standard allows a chain of Class A clocks is not a property of any clock in it. It is the per-node ceiling, 50 nanoseconds, multiplied by an assumed count of ten, plus one intra-site term nobody counts when they quote the per-node figure. The same 50 nanoseconds is the class A constant time error boundary in G.8273.2 Table 7-3. The standard's chain budget is therefore the node ceiling times a number the standard chose.

As shares: ten Class A nodes hold 500 nanoseconds, which is 45.5 per cent of the 1,100 nanosecond network limit and 33.3 per cent of the 1,500 nanosecond end-application figure. Ten Class B nodes hold 400 nanoseconds, 36.4 per cent and 26.7 per cent. The link row in the normative column is 250 nanoseconds for Class A, 22.7 per cent of the network limit, and 380 for Class B, 34.5 per cent. Those are my divisions of printed cells and both operands are on the page.

The reference itself takes 100 nanoseconds, 9.1 per cent of the C limit and 6.7 per cent of the E limit, and the remainder is what every node, every link and every rearrangement below it has to live inside.

Holdover is NA in the column that meets the limit

Now the row that matters. In scenario (a), the normative one, the row called re-arrangements and short-term holdover in the network is marked NA. There is no holdover budget in the column that meets the standard. The chain meets its 1,100 nanosecond limit precisely by not budgeting for the reference going away.

Scenario (b) is a short GNSS interruption, and it puts 400 nanoseconds in that row. Appendix V.3 describes the term: failures in the synchronisation network that do not cause the end application clock to enter holdover, denoted holdover time error, which "is provided by PRTC, and is normally considered to be less than 400 ns". The same clause gives the end application's rearrangement allowance as normally less than 250 nanoseconds and, for a long interruption, a 2,400 nanosecond worst case.

Follow the arithmetic in (b), because it is the most interesting 250 nanoseconds in the document. Class A: 100 nanoseconds of reference, 400 of holdover, 200 of dynamic error, 550 of clock error, and — 100 on the link row. The link allowance has fallen from 250 to 100. The total at reference point C rises from 1,100 to 1,350. Class B does the identical thing: the link row falls from 380 to 230, and the total is 1,350.

Both columns overrun the 1,100 nanosecond network limit by exactly 250 nanoseconds, and the amount they overrun it by is exactly the amount by which the end application's rearrangement row is marked NA rather than 250, which is why the end-point total in that column still reads 1,500.

So the arithmetic is: the network's 400 nanoseconds of holdover is paid for with 150 nanoseconds off the link allowance and with the deletion of the end application's own 250 nanosecond rearrangement term. Nothing was found down the back of the sofa. The standard does not present this as a failure; it presents it as an allocation, and Appendix V.3 states the consequence plainly: "In scenario (b), the 1.1 µs network limit at reference point C defined in clause 7.3.1 might not be met. However, the 1.5 µs limit at reference point E should still be achieved."

Scenario (c) is the honest one about duration. With a long holdover, one day for example, the holdover row takes 2,400 nanoseconds. The column then reads 100 plus 2,400 plus 200 plus 550 plus 100: 3,350 at reference point C, and 3,500 at reference point E, which the standard's own note says may cause service degradation. That is 2,000 nanoseconds above the 1,500 nanosecond figure the whole architecture is sold against. The table is titled an example, only scenario (a) is described as referring to the normative network limits, and (b) and (c) are presented for information as cases where the limits are not met.

Every one of those statements is printed. The example's fourth column, in the second table, funds a three day holdover for Class C and again lands at 1,500 nanoseconds at E, with the holdover row at 840 and 670 nanoseconds and the link row back up to 240, 250 and 380.

None of which means the standard is wrong. It means the standard is explicit about a trade it expects someone else to make, and the 1,100 nanosecond limit and the 1,500 nanosecond requirement are different quantities at different reference points. Squeezing one into the other is the error; the standard itself made the arithmetic, and the arithmetic says holdover is outside the budget that satisfies the network limit.

The same 400 nanoseconds, two owners

Here is a curiosity worth stating carefully, because it is easy to overstate. In scenario (a), the end application's own allowance is 250 plus 150, which is 400. In scenario (b), the network's holdover allowance is 400. The same numeral appears twice in one table with opposite owners, once as what the far end of the chain is permitted and once as what the top of the chain is permitted when the reference goes away. Nothing on the page says the two were derived from each other, and I am not claiming they were. It is a coincidence of numerals that makes a certain kind of sentence very easy to write and very hard to audit.

The vendor's half of the same arrangement

Microchip Technology Inc., through the timing business it acquired, sells both halves. Its TimeProvider 4100 brochure declares the class first, in a bracket that repays a second reading: "Multi-domain, high-performance boundary clock (MD HPBC) function with G.8273.2 performance [Class C (< 10 ns) and Class D (< 5 ns)]" (Release 2.6 brochure). The two numbers inside that one parenthesis are not the same kind of number. Class C under 10 nanoseconds is the constant time error ceiling of Table 7-3. Class D under 5 nanoseconds is the filtered limit of Table 7-2. The unfiltered class D ceiling and the class D constant-error figure are, as of the 2025 amendment, still for further study.

Then the chain sentence: enhanced boundary clock performance "exceeds class D (15 ns accuracy for a chain of 15 boundary clocks) with an average 1 ns boundary clock accuracy". Fifteen clocks at the class C constant-error ceiling of 10 nanoseconds would be 150 nanoseconds, ten times the figure printed. Fifteen clocks at the average the brochure cites would be 15 nanoseconds. So the sentence's arithmetic is right and its average is the whole of its content: 1 nanosecond per node is 50 times tighter than the 50 nanoseconds the standard's Class A row allows per node, and 10 times tighter than the class C constant-error boundary.

A reader who takes "chain of 15" and "class C" and multiplies gets an answer ten times worse than the page's. That is my multiplication of printed cells, and it is the kind of sentence that survives proofreading because every word is true.

The holdover table is the part of the brochure that does the most work in the market. Six columns, left to right: 200 ns, 400 ns, 1.1 µs, 1.5 µs, 5 µs, 10 µs. Three rows. The OCXO reads 4 hours, 8 hours, 14.5 hours, 16.5 hours, 1.5 days, 2 days. The Super OCXO reads 11 hours, 18 hours, 43 hours, 52 hours, 4.4 days, 6.6 days. The MAC laser driven rubidium reads 1 day, 1.8 days, 3.6 days, 4.3 days, 8 days, 12 days. Read down the 400 nanosecond column and you get 8 hours, 18 hours and 1.8 days. Read down the 1.1 microsecond column and you get 14.5 hours, 43 hours and 3.6 days.

The table note is as important as the table: "The above are typical (1 Sigma Confidence) values and include initial phase and frequency errors. Assume a benign temperature environment and that the TP4100 is powered up for three weeks and locked to GNSS for 96 hours." Typical, one sigma, with the initial errors already inside the figure, in a benign room, after a three week warm-up and four days locked to satellites. That is a description of a lab, honestly labelled.

Now the bullet, which sits elsewhere on the sheet: "Maintains ITU-T G8271.1 400 ns GMC holdover specification for up to 43 hours". The hyphen in G.8271.1 is missing; the 43 hours is not. Forty-three hours is the Super OCXO cell in the 1.1 microsecond column. The Super OCXO cell in the 400 nanosecond column is 18 hours.

And the 1,100 nanoseconds at the head of that column is the entire reference-point-C network limit: 1,100 divided by 400 is 2.75, so the duration the bullet attaches to a 400 nanosecond specification is the duration over which that oscillator consumes the whole network budget, not the duration over which it holds the 400 nanosecond line. Whether the bullet means measured performance or is restating the standard's allocation, the sheet does not say. This is the internal tension with a page number, and it is the reason to read the table rather than the bullet.

The frequency table beneath is where the two oscillator grades stop making sense together. Aging after 30 days is plus or minus 6e-11 per day for both the OCXO and the Super OCXO, and plus or minus 1e-10 per month for the rubidium. Aging with learning is plus or minus 3e-11 per day for both OCXOs and plus or minus 2e-12 per day for rubidium. Temperature stability is plus or minus 4e-10 for both OCXOs and plus or minus 5e-11 for rubidium.

Two grades with identical aging and identical temperature stability, whose holdover durations at the same thresholds differ by a factor that is not constant: 11 over 4 is 2.75, 18 over 8 is 2.25, 43 over 14.5 is 2.97, 52 over 16.5 is 3.15, 4.4 over 1.5 is 2.93, 6.6 over 2 is 3.30. My divisions, from the printed cells.

And the aging rate does not reproduce the first hours. Six times ten to the minus eleven multiplied by 86,400 seconds is 5.184 microseconds a day if the rate held constant, and by 28,800 seconds is 1.728 microseconds over eight hours. The 400 nanosecond cell for the OCXO over eight hours implies 400 nanoseconds divided by 28,800 seconds, which is 1.39e-11, 4.3 times below the printed daily rate; the Super OCXO's 18 hour cell implies 6.17e-12, 9.7 times below it.

These are quotients of a printed threshold by a printed duration, not measurements of either oscillator, and a 30 day aging rate and the first hours after an outage are different quantities. What is missing is the rate at the hour scale the holdover column actually uses, and no document in the reviewed set prints it.

The earlier release is useful for one reason only: it shows which claims are load-bearing. Release 2.0 declares the same class C and class D bracket, gives the holdover table with two rows rather than three, no Super OCXO and no aging table in the retrieved text, and a smaller asymmetry claim of up to 32 network paths or behaviour variations (Release 2.0). Release 2.3 already carries the aging rows (Release 2.3), so the daily aging figures cannot be attributed to the older sheet even though it is the sheet the class claim is usually dated to.

The asymmetry that does not average away

The second term with no home in the table is the one the industry likes least, because it is fixed rather than random. Microchip's assisted partial timing support white paper states it as well as anyone: "This rate conversion creates known asymmetry of about 6 µs, which would result in 3 µs of phase error (error due to asymmetry is always half of the difference in the path lengths)" (APTS white paper). The example is a fixed rate conversion from 1 gigabit Ethernet to 100 megabit, between a source reference clock and an edge one.

Hold that against the budgets. Three microseconds is twice the entire 1,500 nanosecond end-application figure, 2.73 times the 1,100 nanosecond network limit, twelve times the Class A link allowance of 250 nanoseconds and 7.9 times the Class B allowance of 380. Six microseconds of delay difference, at my own assumption of 200,000 kilometres per second, is 1,200 metres of path. One rate conversion on one path, and the error is larger than the whole budget the standard spends so carefully.

The correction is real and the vendor sells it: enhanced automatic asymmetry compensation across multiple PTP client inputs, and a 2019 majority vote mechanism, working across up to 96 network paths or behaviour variations in Release 2.6, against 32 in Release 2.0. The white paper's own arithmetic explains the increase: 32 paths per source reference clock, three sources, 96 variations. That is a count of paths, not a statement about what is left after compensation.

Read every sentence in the paper about residual error and you get one threshold, and it is not an asymmetry figure: a path whose asymmetry profile has not been calibrated, appearing while GNSS is disconnected, is described as letting the oscillator drift away from a plus or minus 100 nanosecond requirement. No sentence in the reviewed text gives the residual after compensation in nanoseconds, or as a fraction of mean path delay. That absence is a count over a named set of documents read on 26 November 2026, not a claim about what the company has never printed.

The note that performs the join, and relabels it

The one Microchip document that does the arithmetic is the application note on 5G standards, AN5124, and it is worth quoting in full because it is the closest thing in this set to a budget: "the PRTC is allocated 400 ns of budget for holdover, and the end application the BBU or RU has only a budget of 150 ns." Then: "Considering the appendix “V.3 Failure scenarios” of the ITU-T G.8271.1 11/2022, the PRTC must handle the time error below 400 ns when in holdover mode." Then: "Pointing to “Table V.1–Example of time error allocation”, ITU-T defines the long holdover period as 1 day." Then the assumption and the conclusion: "We are assuming that the PRTC must be able to hold the phase below 400 ns for 24 hours at least in holdover mode", and "so we are able to maintain the phase outputs <400 ns for 1.8 days with our rubidium oscillator and comply with this ITU-T requirement for PRTC holdover" (AN5124).

The 1.8 days is the rubidium cell in the 400 nanosecond column of the table above, which is the correct cell to reach for and the correct oscillator grade to attach it to. The 150 nanoseconds is the standard's end-application noise term, which is also correct. What the note does in the same paragraph is call the figure a requirement while quoting a table whose own title calls it an example, and the appendix it cites says the term is normally considered to be less than 400 nanoseconds. Reference point C, and the 1,100 nanosecond limit, do not appear in the retrieved text of the note. The note is not inventing a number.

It is taking the standard's number, giving it a stricter verb, and pointing at the table that produced it without the caption.

That is the whole mechanism in one document: a number that is an allocation in the standard becomes a requirement in the vendor note, and a requirement in the note becomes a specification in the brochure, where the same 400 nanoseconds is attached to 43 hours instead of 18. Three verbs for one figure, and at no point does anyone print the line that says what the figure is a share of.

What it costs the buyer

An engineer who reads 1.5 microseconds and buys parts that meet their class has sized half a problem. The chain limit and the node ceiling are joined by a multiplication nobody performs, and the standard's own grid is the proof that the multiplication closes only when holdover is struck out. A network that satisfies clause 7.3.1 does so with the reference present.

The moment the reference disappears, the budget that was spent to the nanosecond is a budget in the wrong tense: the row that funds the outage does not exist in the column that meets the limit, and the column that funds it is 250 nanoseconds over the limit before the outage is even a day old.

For a substation merging unit, the operative number is neither the class nor the 1.5 microseconds but the time to the 400 nanosecond threshold on the oscillator grade actually fitted, and that number is 18 hours on one grade and 1.8 days on another and 8 hours on a third in the same table. For a mobile network that has moved its air interface onto a common time base, the operative number is the asymmetry residual after compensation, and no reviewed page prints one — so the number an auditor will ask for is the one number the set does not contain.

For the person who writes the purchase order, the question that separates the two products is not which class the box declares. It is: which oscillator, to which threshold, for how many hours, at one sigma or at worst case, and what is left in the budget after the link's own asymmetry is taken out.

Three questions will do it. What is the time error at reference point C for a chain of the length I am building, with holdover counted, and which column of which table did that come from. What is the residual asymmetry after compensation, in nanoseconds, on the paths I actually have. And what is the drift rate at the hour scale, not the 30 day aging rate, for the oscillator in the box I am buying. The first has an answer in the standard, and the answer is uncomfortable. The second and third have no answer in the reviewed set, which is itself the most useful thing a buyer can know before the purchase order goes out.

Eleven documents were read for this piece on 26 November 2026: the Release 2.6 brochure, the 5G standards application note, the assisted partial timing support white paper, the Release 2.0 and Release 2.3 sheets, G.8271.1 as amended in May 2025 together with its November 2022 base text, which carries the same grid with Type A and Type B in place of Class A and Class B (G.8271.1, 11/2022), G.8271 as amended in August 2024, G.8273.2 as published in 2023 and as amended in November 2025, and the G.8275.1 telecom profile. Every absence here is a count over that list. Every quotient is mine, with both operands named. The limits are not measurements, a class ceiling is not a chain budget, and the column that spends 1,100 nanoseconds to the last nanosecond is published by the same body that sells the 1,500.