Summary

  • Liquid defines its own fibre total, and the definition is not a route length: backbone, metro and FTTX kilometres, with every cable or duct inside one trench counted separately and leased capacity counted alongside owned plant.
  • That rule appears in a results footnote. All three Liquid pages that print "over 116,000km" print it undated and undefined, and the wholesale page's "wholly owned, open-access" sits in plain disagreement with a footnote that includes leased capacity through partnerships.
  • Five country countings appear across four years and five surfaces: 12, 14, 20, more than 20, over 25. No reviewed page reconciles them, and nothing reviewed says how many of those kilometres were lit.

Three pages, one undated number

Liquid's network page tells the story in a single sentence: "Since putting our first fibre in the ground in 2009, our high-speed cross-border network has grown to over 116,000km of fibre." (Liquid, our network) The company history page repeats it as "an extensive fibre broadband network covering over 116,000 km". (Liquid, our story) The wholesale page raises the stakes: "With an unmatched, wholly owned, open-access fibre network spanning more than 116,000km." (Liquid, wholesale products)

Three pages, three printings of one round number. None of them carries a date, a counting rule, or a list of countries beside the figure. A reader who wants to know what a Liquid kilometre is has to leave the pages that sell it.

The footnote that decides what a kilometre is

On 23 July 2026, reporting the quarter ended 31 May 2026, Liquid wrote: "Our pan-continental network now stretches to 115,969 kilometres and is largely complete and therefore the fibre expansion in the period remained low." The same document carries footnote 1, repeated word for word on the KPI slide of the 22 October 2026 presentation:

Total fibre network in kilometres (incl. backbone, metro and FTTX) through which fibre is installed. Multiple kilometres of fibre cables or ducts within the same trench/overhead line are counted individually. Includes both owned and leased capacity through partnerships.

That sentence does three pieces of work at once. (Q1 FY27 results) (Q2 FY27 presentation) It names what is counted: backbone, metro and FTTX, three kinds of plant folded into one total. It sets the counting rule: several cables or ducts inside one trench, or on one overhead line, each count as their own kilometres, so a single trench-kilometre carrying four cables contributes four. And it sets the tenancy: capacity leased through partnerships counts alongside capacity owned.

What comes out the other end is a stock of installed fibre-kilometres across segments and tenures. It is not the distance from Cape Town to Cairo. It is not the length of a route on a map. It is not a lit-fibre count either — "through which fibre is installed" is a statement about construction, not about traffic.

The arithmetic closes to the kilometre

Liquid's own documents let a reader check the series. The signed annual financial statements for the year ended 28 February 2026 say the network "reached 115,334 kilometres" in that year. (statements, year ended 28 February 2026) The Q1 FY27 release reports 635 kilometres added in the quarter and a total of 115,969. The Q2 FY27 release, published 22 October 2026, reports "116,386 kilometres after the addition of 417 kilometres in the second quarter". (Q2 FY27 results)

Additions first, and these are mine rather than the company's: 115,334 + 635 = 115,969; 115,969 + 417 = 116,386. Both steps close exactly, to the kilometre, with nothing left over. The same holds further back in the tabulated row — 109,057 + 5,093 = 114,150; 114,150 + 630 = 114,780; 114,780 + 554 = 115,334 — where the increments are my subtractions between rows Liquid prints but does not spell out.

What that establishes is narrow and it is worth having: the total is a running addition from quarter to quarter, not a perimeter quietly redefined between reports. The number grows because kilometres are added to it.

The chart is a rounding, not a rival

The 22 October presentation plots the same series with the axis label "Total fibre network (kms 000)", and the labels run 108.1, 108.4, 108.9, 109.1, 114.2, 114.8, 115.3, 116.0, 116.4. Set against the tabulated rows, the six I can pair differ by 43, 50, 20, 34, 31 and 14 kilometres. That is rounding to the nearest hundred, not a second measurement. Anyone quoting "116.4 thousand kilometres" off the chart is quoting 116,386 rounded, and should say so.

Where 116,000 falls

Put the undated round number against the dated ones. On 31 May 2026 the tabulated total was 115,969 kilometres — 31 below 116,000. On 31 August 2026 it was 116,386 — 386 above. So "over 116,000km" was not yet true of the reported total on one balance-sheet date and was comfortably true on the next. Both figures in that comparison are mine. The pages print no date, so no reader can tell which side of the line the sentence came from.

Wholly owned, and leased through partnerships

The wholesale page says the network is "wholly owned, open-access". The footnote governing the total says it "includes both owned and leased capacity through partnerships". Two scope claims from one company, no reviewed page that reconciles them, and no published split between owned and leased kilometres inside the total — so nobody outside can say what fraction of 116,386 kilometres Liquid owns.

Read plainly, the two sentences describe different perimeters: a fibre network operated in 12 countries, and a group total that reaches past owned plant. I am not calling either false, and no reviewed document says why the pages differ. What can be said is narrower. If a buyer reads "wholly owned" and then contracts against a number that includes leased capacity, the word and the number are not describing the same asset.

Five numbers for one footprint

The country perimeter moves more than the kilometres do. Five countings, five surfaces, four years: 12 countries where Liquid operates its fibre network, on the undated wholesale page; 14 countries "primarily in Sub-Saharan Africa" in the 2 June 2021 milestone release (100,000 km release); 14 countries "primarily in Eastern, Southern and South Africa" in the Q1 FY22 release (Q1 FY22 results); 20 countries in the annual financial statements for the year ended 28 February 2022 (statements, year ended 28 February 2022); "more than 20 countries" on the history page; and "over 25 countries in Africa" in the Q1 FY27 boilerplate.

Each may be counting something different — fibre operation, group presence, entities, markets — and no reviewed page defines the noun. This article does not pick a winner. It notes only that the one page which puts a country count in the same sentence as a fibre figure, the wholesale page, never says the kilometres are those twelve countries' kilometres.

Four things counted on the same pages

The network page also prints data centres in Johannesburg, Cape Town and Nairobi with "a combined potential 19,000 square metres of rack space and 78 MW of power" — potential, not built, and no counting basis for either the square metres or the megawatts. The 2021 release adds 643 towns and cities and "more than 100 million people". A trade report from the same day adds over 1,000 points of presence and more than 95,000 homes passed with fibre-to-the-X. (Engineering News, 2 June 2021)

Four kinds of object — kilometres, square metres with megawatts, towns with people, points of presence with homes — and not one of them defined beside its figure. Nothing here is joined to anything else.

What a fibre kilometre cannot tell you

No reviewed surface says how many of those kilometres were lit and carrying traffic on any date, and none prints utilisation, wavelength or capacity for the fibre network. The footnote defines construction, not use. That is the gap that matters most to anyone buying reach, and reading harder will not close it: it needs a dated network map or route schedule fixing which links were live, a regulator or competition record fixing an audited length in a named unit, or a group annual report note that states the KPI basis and its scope beside the number.

Boundaries

  1. Reviewed on 22 November 2026: Liquid's network, story and wholesale pages; the Q1 FY27 release of 23 July 2026; the Q2 FY27 release and presentation of 22 October 2026; the signed annual financial statements for the year ended 28 February 2026; the 2 June 2021 milestone release; the Q1 FY22 release; the annual financial statements for the year ended 28 February 2022; and one Engineering News report of 2 June 2021. Nothing else was read for this article.
  2. Every Liquid PDF was read through provider-reported extraction of the named address, not by rendering the pages; two retrievals of the Q1 FY27 release disagreed on whether that file's own text layer was directly extractable, so table alignment and any figure drawn as an image were not inspected.
  3. No group annual report note or accounting-policy statement defining the KPI was obtained; the FY2026 statements print the year-end figure and, in the reviewed text, do not restate the counting convention.
  4. No network or coverage map was obtained, and no country-by-country or route-by-route length breakdown was read.
  5. No regulator, competition-authority or merger record fixing an audited length and unit was reviewed.
  6. No reviewed surface states how many of the counted kilometres were lit or in use on any date.
  7. The five country countings come from five surfaces with different dates and scopes; no reviewed page reconciles them.
  8. The data-centre figure is printed as a potential, and no reviewed page states the counting basis for the square metres or the megawatts.
  9. The points-of-presence and homes-passed figures come from a 2021 trade report, not from a reviewed Liquid surface.
  10. The 2021 towns-and-cities and people figures are a company claim in a dated release; no reviewed surface states how either is derived or when measured.
  11. Both round numbers are undated on their pages, so the date on which each became true cannot be fixed from the reviewed text.

Readings I did not take

  • An additive cable-and-duct count is not a route length, and this article never reads it as one.
  • A kilometre count is not capacity, reach, redundancy or service quality.
  • The footnote does not make the figure misleading; it makes it defined. A defined thing that is not a distance is not an inflated thing.
  • Silence on the counting rule is not evidence of concealment: the same company prints the rule in its own results.
  • Two scope claims printed side by side do not prove either false, and no motive is asserted here.
  • The round number is not an error; at one dated balance sheet it was 31 kilometres short, at the next 386 ahead.
  • The chart does not contradict the release: it rounds it.
  • Five country countings are five claims, possibly about five perimeters, not five mistakes.
  • Kilometres are never converted here into capacity, customers, revenue or traffic.