Summary

  • A runtime table is not a specification of runtime; it is a handful of points on a discharge curve, printed at loads, at a battery age and in a room the buyer does not control.
  • Eaton prints the heat its batteries tolerate as a fraction of life lost per 8.3 °C, and again as 50 per cent per 10 °C elsewhere; the minutes never carry either curve, and in four 93PM specification surfaces the stored-energy-time row reads "See separate declaration".

The 9PX 1–3 kVA runtime table prints minutes against ten columns: 10, 20, 30, 40, 50, 60, 70, 80, 90 and 100 per cent of rated load (Eaton 9PX 1–3 kVA runtime table). One row, the 9PX3000IRT2U, reads 59, 30, 19, 13, 9, 7, 5, 4, 4 and 3 minutes across those columns. Read the row as a rate and it refuses to behave: 30 minutes at 20 per cent of the rating multiplies to 600, and 3 minutes at 100 per cent multiplies to 300. Both operands sit on the same printed line, so this is my arithmetic and not Eaton's. It is not a mistake either. It is a lead-acid battery discharged harder, and it is the single most useful thing on the sheet, because it tells the buyer that the curve cannot be scaled by proportion: double your load and you do not halve your minutes, you lose more than half.

That chart's footnote is where the honesty lives and also where it stops. The runtimes are approximate and affected by battery age, frequency of discharge and ambient temperature, with a variance of plus or minus 15 per cent typical. It names the ambient as a factor and never states the ambient the numbers hold at. The power-factor basis also moves inside the one sheet: the footnotes cite 1.0 for some rows and 0.9 for another, so the load column is a percentage of a kilovolt-ampere rating that is not one quantity from top to bottom.

The 6–11 kVA chart is tidier and just as silent. It is titled for Pf=0.9 loads, with columns at 10, 25, 50, 75 and 100 per cent (Eaton 9PX 6–11 kVA runtime chart). Standard internal-battery 6000: 57, 22, 8.5, 4.5 and 3 minutes. The same 6000 with four external battery modules: 755, 287, 133, 90 and 58. Standard 11000: 74, 25, 10, 5.5 and 3. Values printed in red are marked not recommended, the same plus or minus 15 per cent applies, and again no ambient is stated. At full load the standard configuration prints 3 minutes on the 3000 VA row, 3 minutes on the 6000 VA row and 3 minutes on the 11000 VA row, while the nominal energy behind those configurations differs by more than double — 900 Wh internal on the 5 and 6 kVA models against 2,160 Wh in a single external module of twenty blocks at 12 V and 9 Ah (Eaton 9PX 5–11 kVA technical specification). Mine, from the printed block counts and the printed minutes; it says the full-load row is a policy figure as much as a physical one.

Put a number under the minutes and the gap widens. Fifteen blocks of 12 V at 5 Ah is 900 Wh nominal. At 50 per cent of a 6000 VA rating on the 0.9 power factor the chart itself states, the printed 8.5 minutes is 2,700 W for about 0.142 hours, which is 0.38 kWh delivered — roughly 42 per cent of the nominal energy. Mine again, with the energy build from the specification and the minutes and power basis from the chart. A discharge curve that delivers two-fifths of the label at half load is not being coy; it is being a battery.

Now the room, which is where the seller's own pages stop agreeing on a single number. The 9PX specification puts the battery's ambient service temperature at +5 to +25 °C "without reducing battery life", with the power electronics rated 0 to +40 °C, and prints float temperature compensation of 3 mV per degree referred to 25 °C nominal when ABM is disabled — but no numeric temperature derating of runtime. The 9PX user guide is blunter: "For full battery life, keep the equipment at an ambient temperature of 77 °F (25 °C)", the VRLA blocks are rated at a 3 to 5 year service life with lifetime reduced above 86 °F (30 °C), and the owner is told to replace batteries at least every 4 years (Eaton 9PX 8–10 kVA user guide).

The three-phase range spreads the same field across four documents and never joins it. The 93PM 30–200 kW technical specification recommends +20 to +25 °C for optimised battery life inside a +5 to +40 °C operating range, derates output 1 per cent per additional 100 m above 1000 m of altitude — a number — and refers stored energy time to separate information (93PM 30–200 kW specification). The UL 924 guide specification is the only page in the set that ties retirement to a capacity fraction: the battery management system tests the string and alarms for attention or replacement when capacity falls below 80 per cent of new battery capacity, and the charger must restore 90 per cent of full capacity within 10 times the discharge time (93PM UL 924 guide specification). The APAC datasheet repeats the ten-times recharge basis and prints no minutes at all (93PM 80–200 kW APAC datasheet).

And then the row that gives the game away. In the 93PM 100–500 kVA and 100–400 kW technical specifications, both Rev010 and both stamped 6/11/2025, the IEC 62040-3 entry 5.4.2.2 f "Stored energy time" is printed as the words "See separate declaration" (93PM 100–500 kVA, 93PM 100–400 kW). The same wording sits on a 160–200 kW sheet hosted by a distributor (iso-dist.ru copy), which makes it a long-standing drafting habit rather than a recent gap. The declaration itself was not located on 26 November 2026.

The one 93PM surface that does print minutes is a 2015 runtime chart hosted outside eaton.com, and it is scrupulous about its own conditions: every table at +25 °C ambient and 1.70 VPC end voltage, batteries fully charged, measured after at least five full discharge cycles (93PM runtime chart Rev009). A 9 Ah internal battery at 30 kVA and power factor 0.8 gives 10, 16, 21 and 27 minutes across four string counts; the 10 kVA rows give 42, 65, 88 and 110. It also supplies no correction table for any other temperature, which is exactly the document the buyer needs and does not get.

The age axis is worse than missing, because it is stated four times in four currencies. A plus or minus 15 per cent footnote on the single-phase chart. A 3 to 5 year service life and a four-year replacement instruction in the user guide. An 80-per-cent-of-new capacity alarm in the UL 924 specification, and 80 per cent of rated capacity as the definition of end of life in the three-phase battery handbook (Eaton three-phase battery handbook BAT11LTA). None of those is a schedule a facilities team can measure in place.

Heat, at least, is priced. Eaton's single-phase battery technical brief states that "for every 8.3 °C (15 °F) average annual temperature above 25 °C (77 °F), the life of the battery is reduced by 50 percent" (BAT14FXA). The handbook repeats it, with the Fahrenheit parenthetical printed as "46.9 °F" in the retrieved text, which is the size of the document's own proofreading problem rather than a second physical finding. An Eaton replacement-battery document hosted on also.com prints the same claim as "50% for every 10 deg Celsius rise above 25 deg Celsius", adds that capacity and therefore available runtime falls at lower temperatures, and gives storage of about 12 months at 25 °C, 8 months at 30 °C and 4 months at 40 °C (also.com copy). Two steps, one baseline, one halving: at 35 °C the 8.3 °C rule implies more than one halving and the 10 °C rule exactly one. Mine, and the operands are those two sentences.

What that costs is easy to state and hard to sell. Apply one 8.3 °C step to a room averaging 33.3 °C and the printed 3 to 5 year service life becomes 1.5 to 2.5 years. Mine, with the step and baseline from the battery documents and the service life from the user guide. The kilowatt-hours in the room did not change. The number the buyer was given did.

A conference paper by an APC engineer, hosted on mathscinotes.com and kept here as context rather than as Eaton's position, explains why the two steps coexist: 8.3 °C is the VRLA figure, 10 °C the vented lead-acid figure, IEEE 1187 Annex C uses 50 per cent per 8.3 °C of electrolyte rise, and the literature is "all over the board" on which temperature is even being measured (APC paper). That is a third party speaking, not Eaton. It is also the only reviewed page that admits the ambiguity.

Eaton's own knowledge base, by contrast, points at "published battery time tables" as the sizing instrument, notes that lithium-ion autonomy is limited by cell temperature during discharge as well as by low cell voltage, and sends the customer to an application engineer (Eaton knowledge base). The US runtime landing page offers interactive per-model graphs and gave up no numbers to this reading (US runtime graphs).

Recharge closes the loop with the same split personality. Ninety per cent restored in 1.5 hours on the 9PX6Ki with the internal battery, rising to 27.4 hours with four external modules, and 1.43 hours to 15 hours on the 9PX11Ki. Against that, the 93PM rule: 90 per cent restored in ten times the discharge it must reverse, so a 30 minute discharge implies 300 minutes of charging. My arithmetic, both operands from the guide specification. One family quotes hours; the other quotes a multiple of a duration the buyer was never told.

Here is what all of it amounts to. To know what a UPS will actually give him, a reader has to supply four things the seller's pages spread across eight documents: his own watts behind a percentage of a kVA rating whose power factor changes by row, his own room temperature against a derating no runtime sheet prints, his own battery's age against a retirement criterion that is a calendar in one family and a capacity fraction in another, and his own reading of stored energy from a block count that the specification defers elsewhere. The minutes are exact to the digit.

Every operand that decides whether they are true is somebody's else's page.

Sources read, 26 November 2026. Eaton-hosted: 9PX 1–3 kVA runtime table, 9PX 6–11 kVA runtime chart, 9PX 5–11 kVA technical specification Rev 5, 9PX 8–10 kVA user guide, 93PM 30–200 kW technical specification, 93PM UL 924 guide specification, 93PM 80–200 kW APAC datasheet, 93PM 100–500 kVA specification, 93PM 100–400 kW specification, 93PM integrated battery cabinet manual, BAT14FXA technical brief, BAT11LTA battery handbook, Eaton knowledge base on battery sizing, US runtime graphs landing page. Hosted elsewhere, and graded as such: 93PM runtime chart Rev009 (poweram.ee), 93PM 160–200 kW specification (iso-dist.ru), 93PM user guide page 114 (manualslib mirror), replacement-battery life document (also.com). Eaton-branded and Eaton-authored where it sits on eaton.com; the four outside hosts are read as copies of Eaton documents and are named every time their content is used. Third-party context only, never Eaton's position: the APC conference paper on mathscinotes.com.

What this reading cannot tell you. Nineteen documents were read on 26 November 2026 and every absence here is a count over that set, not a claim about what exists anywhere. No test report, site log, failure record, service-level schedule or purchase contract was among them, so nothing below measures a UPS in service. The text came through search-result extraction rather than a rendered page, so merged cells and footnotes may be incomplete, and the handbook's "46.9 °F" is recorded as printed rather than corrected. The separate declaration the 93PM specifications point at was not located. No reviewed page prints a temperature derating of runtime in minutes, and no reviewed page states the interval over which an operator's own autonomy figure would be measured.