Five hundred terabits per second is a beautiful number for a press release and a brutal one to audit. On 5 October 2026, e& said it would push its international connectivity capacity from a quoted 20 Tbps to more than 500 Tbps by 2030 — a 25-fold leap. What the announcement did not hand over is the one thing an auditor reaches for first: a ruler. No dated baseline, no fixed perimeter, no counting rules. Until those exist, “500 Tbps” is a slogan wearing a specification’s clothes.

What e& actually announced — and what it left out

The company said it planned to grow international connectivity capacity to more than 500 Tbps by 2030, describing the goal as more than 25 times current capacity, with a quoted statement putting the starting point at 20 Tbps. Those two figures establish the target e& has announced. The release does not provide the dated baseline, the technical perimeter or the counting rules needed to test progress against it. That gap is the whole story.

“Capacity” is five different things wearing one coat

The word hides a small crowd. A system can have a designed capacity, installed equipment that supports some of it, capacity lit on the network, capacity provisioned for a service, or capacity a customer can actually order under defined conditions. These are not interchangeable, and the distance between them is where marketing lives. A project can add theoretical or installed capacity long before it becomes usable; conversely, service capacity can lean on arrangements invisible on any physical cable map. e& has not said which stage its 20 Tbps baseline or its 500 Tbps target represents. Assigning either figure to a stage would go beyond the evidence.

Where does “international” end?

Geography and measurement points are just as consequential. “International” might be bounded by the UAE border, by named landing stations, by particular network endpoints, or by a wider set of markets. The number can also shift depending on whether it is measured at the cable, at a gateway, across a backbone, or at a customer-facing service boundary. A reproducible metric needs a fixed perimeter: which locations and links qualify, where throughput is measured, and how the operator aggregates those values. Without that perimeter, a later update could keep the same label while quietly counting a different network footprint.

The Capacity Hub is a menu, not a meter

e&’s own Capacity Hub page shows why a route list cannot stand in for a KPI. It describes access to more than 20 terrestrial and submarine cable systems and wholesale services on systems that do not necessarily land at e&’s own cable stations. That is useful context about the commercial footprint — but the page does not say that every listed system feeds the 20 Tbps baseline or the 500 Tbps target. Nor does it disclose the capacity assigned to each system or the point at which it is counted. Reading the target’s composition off the product page would be a guess dressed as arithmetic.

IRUs, leases and the ownership question

Rights to use infrastructure raise a separate accounting problem. e&’s 2025 Integrated Annual Report defines an indefeasible right of use, or IRU, as a fixed-term contractual right to use capacity on a transmission cable. That explains a category of access, not how IRUs are treated inside this target. An auditable disclosure should separate capacity owned outright from capacity available through an IRU, a lease, a consortium or another partner arrangement. All of them can carry service, but their duration, control and renewal exposure differ.

Counting them together is defensible for a measure of serviceable capacity — provided the basis is disclosed and held constant. Blur them without explanation and you obscure what e& controls versus what it merely rents.

Directionality and the double-count trap

Two more rules need air. A link’s capacity can be quoted per direction or as a combined bidirectional figure. A shared system might surface in more than one market or endpoint calculation. Capacity bought through a partner might also appear inside a system-level figure. None of this proves e& has double-counted anything; it proves the aggregation method should be published. The same methods must apply to the baseline and to every checkpoint, or the ratio between 20 and 500 Tbps means nothing over time.

Regulators do not fill this gap

The UAE Telecommunications and Digital Government Regulatory Authority’s 2022 international cable rules distinguish cables that transit, land, connect or terminate, and set out a licensing and permitting framework. They clarify regulatory concepts around cable works. They do not prescribe how to measure e&’s 500 Tbps company target, and they are not evidence that any particular component has been permitted or delivered. A disclosed regulatory filing could corroborate a specific milestone if it covered the same asset and stage — but the rules themselves do not validate the headline.

Cloudflare’s ruler does not fit e&’s hand

Cloudflare’s use of the same 500 Tbps magnitude offers a narrow methodological comparison. Cloudflare says its figure represents provisioned external interconnection capacity and distinguishes it from peak traffic — a clean example of a company stating what its number measures. It is not a definition transferable to e&: the networks, service boundaries and purposes differ. And capacity is not traffic. A network’s ability to carry data is not the amount customers are using at any given moment. Confusing the two is how a pipe becomes a promise.

What an auditable target would look like

For e&’s target to become a credible public commitment, the company would need to publish a dated 20 Tbps baseline, hold the perimeter constant, name the measurement layer and define which capacity stages count. It should state how owned, IRU, leased and partner capacity are treated; whether figures are per direction or combined; how shared capacity is de-duplicated; and which customer-available evidence backs each annual update. Independent assurance would not make the target achievable by itself, but it would make reported progress reproducible.

Until those rules are public, the 2030 number remains a company ambition — not a delivery record. The first ruler e& publishes will matter more than the last terabit it claims.

Sources