Summary
- Seattle Internet Exchange runs core switches in three buildings — the Westin Building, KOMO Plaza and Sabey Intergate — and prints its port prices as one-time charges, from $100 at 1GbE to $15,000 at 400GbE, with a recurring payment available at 12 per cent of the one-time fee.
- The fibre joining those buildings is recorded on SIX's own contributors page as donated in 2026 by Astound, Zayo Group and Level 3 Communications / Looking Glass Networks, and the April 2024 annual-meeting minutes report that all three locations with SIX-managed switches are covered by zero-cost agreements.
A price list that stops at the cross-connect
The joining page wastes no words on the geography. "The SIX Core switches are located at KOMO Plaza, Sabey Intergate, and the Westin Building. The KOMO Plaza uplink is 3x400G. The Sabey Intergate uplink is 3x100G" (join the SIX). Three rooms, one fabric, and an uplink figure beside two of them.
The money on that page is one-time money. A 1GbE port is printed at $100, a 10GbE port at $1,500, 40GbE and 100GbE at $7,500, and 400GbE at $15,000, with the 400GbE port listed at KOMO Plaza and the Westin Building. Above $1,500 the page offers an alternative: 12 per cent of the one-time fee per month with a ten-month minimum, printed as $180 a month at 10GbE, $900 at 100GbE and $1,800 at 400GbE (join the SIX).
Two SIX pages describe this differently and mean the same thing. The about page says: "The SIX does not charge recurring fees, but they are offered as a payment option" (about the SIX). That sentence and the 12 per cent table are one schedule with two faces, and the arithmetic is mine, not SIX's: 12 per cent times ten months is 120 per cent, so paying the minimum term costs 1.2 times the one-time fee (ARITH-3).
The FAQ then hands part of the bill to somebody else. Building management or the colocation provider, it says, may charge for the labour and materials of a cross-connect and may charge a recurring fee of its own, and it sends the reader to the joining page for connection fees (frequently asked questions). The physical location is printed there too: the Westin Office Building, 2001 6th Avenue, Seattle (frequently asked questions).
So the published price list covers a port and points at a cross-connect. It does not cover the thing that makes three rooms into one exchange.
The carriers are on a page of their own
They are named on a page that is easy to miss, in entries headed by a year. The 2026 entries read:
2026: Astound donated fiber between the Westin Building and KOMO Plaza and Sabey Intergate.
2026: Zayo Group donated fiber between the Westin Building and Sabey Intergate.
2026: Level 3 Communications / Looking Glass Networks donated fiber between the Westin Building and KOMO Plaza.
Read the routes rather than the names. Astound is recorded on both legs, Westin to KOMO Plaza and Westin to Sabey Intergate. Zayo Group is recorded on the Sabey leg. Level 3 Communications / Looking Glass Networks is recorded on the KOMO Plaza leg. The Westin Building appears in all three sentences, which is consistent with the FAQ calling it the physical location and with the topology page giving it the 400GbE switch (topology).
What the page prints is a year, an organisation and a route. What it does not print is a term, a renewal date, an expiry, a maintenance obligation, or an escalation path. "Donated" is the page's own verb, and no document I read states a consideration, a condition or a counterparty duty attached to it.
The minutes put the rooms in the same column
SIX publishes its annual-meeting minutes, and the April 2024 record carries the sentence that makes the pricing page legible:
Chris added that KOMO Plaza is also covered by an agreement. Thus all three locations with SIX-managed switches are covered by zero cost agreements.
The speaker is named only as Chris. The document is a record of a meeting, not a contract, and it says what it says: the three locations that hold switches SIX operates were, in April 2024, covered by agreements at zero cost. The rooms and the span that joins them are therefore outside the invoice in the same way. A member's one-time port fee buys a port; it does not buy floor space, power, a cross-connect, or carriage between buildings.
What the span did, year by year
The fabric has a maintenance history, and it is published as milestones rather than as a service description. In March 2018 the Sabey Intergate switch was replaced and its inter-switch link increased from 20 Gbps to 300 Gbps — my division, not SIX's, puts that at fifteen times the earlier capacity (ARITH-4) (about the SIX). In April 2022 the minutes recorded that "The Inter-Switch Link (ISL) between the Westin and KOMO Plaza will soon be 3x400G (1.2 Tbs)" (minutes, 20 April 2022). In April 2023 the next minutes reported it done: "In the last year, the ISL between then Westin and KOMO Plaza was upgraded to 1.2 Tbps. It consists of three 400G circuits. The old 1RU switch at KOMO Plaza was retired" (minutes, 20 April 2023).
The topology page carries the same capacity in a table row: "SIX Core: KOMO Plaza 1/10/100/400GbE | KOMO Plaza | 1.2 Tbps | Arista 7504R3" (topology). Sabey Intergate is printed at 300 Gbps. The two pages reconcile exactly under my own multiplication and under no printed sentence of SIX's: three 400G circuits make 1.2 Tbps (ARITH-1) and three 100G circuits make 300 Gbps (ARITH-2) (join the SIX, topology).
One figure is absent from the text I received. The Westin Building hosts the 400GbE switch and is printed as the physical location, and no inter-switch capacity is printed beside it. Nothing follows from that absence except the absence itself.
What the span is made of was described publicly seven years before the 400G upgrade, in a deck SIX keeps in its own archive: "Solid dark-fiber interconnect over short metro distance" (NANOG 70 presentation, 2017). Dark fibre over a short metro hop, in a city where three buildings sit within a few blocks of each other, is the least surprising architecture available. The surprising part is how it is paid for.
The sentence that is not there
I read nine documents for this piece: the contributors page, the topology page, the joining page, the FAQ, the about page, the minutes of three annual meetings, and the 2017 presentation. Across those nine, the inter-building span appears as a route, a capacity, an upgrade date and a donor. It does not appear as a contract.
No page states who maintains the fibre, who repairs a cut, how quickly anyone must respond, when a donation ends, or what replaces it if it does. That is a bounded absence, scoped to the nine documents captured on 20 November 2026, and it is not a claim that SIX publishes no such terms anywhere. It is a claim about what a member, a prospective member or a competitor can learn from the operator's public surface: the carrier is visible, the consideration is not.
The topology page also draws a line that matters here. "The SIX topology consists of a set of core switches managed by the SIX ops team, along with a number of extension switches (extensions) operated by third-parties" (topology). Extensions are a commercial product run by someone else; the core span is infrastructure SIX describes and does not sell. The joining page charges $100 to connect via an extension and leaves the extension operator's own port fees to that operator (join the SIX). The distinction is the whole article: the exchange prices the extension, prices the port, and does not price the fabric.
What a member is actually buying
Consider the decision in front of a network buying a port at Sabey Intergate. The price list is unambiguous: $100 one-time for 1GbE, $1,500 for 10GbE, $7,500 for 100GbE. The about page confirms a recurring option and no recurring charge (about the SIX). The FAQ warns that the building may bill for the cross-connect (frequently asked questions).
What the buyer cannot read anywhere in these nine documents is the standing of the 300 Gbps trunk that carries that port's traffic to the rest of the exchange. It exists, it is named as a 2026 donation from Zayo Group and Astound, it was upgraded from 20 Gbps in 2018, and its terms are not printed. The port price does not move if the arrangement does. Nothing in the price list is a hedge against the span.
That is not a scandal, and this piece does not allege one. Exchanges have been built on donated fibre, donated rack space and donated goodwill since the first of them, and a community fabric that runs on contributions is doing what community fabrics do. The point is narrower and more useful: when the geometry is a gift, the priced instrument stops at the cross-connect, and the thing the member is really relying on is the one thing the operator's public surface describes but does not contract.
BTW has read this exchange four times already this autumn, and each reading took a different object. On 17 October 2026 the case file argued that buying the port is not the end of connecting, because the route in and the networks that agree to exchange decide the value. On 19 October the briefing recomputed the published capacity sum against the five port classes and found it closing exactly beside a peak traffic figure with no stated basis.
On 21 October the research piece showed the price freezing at the authorisation letter while the documents that would say who may change it stayed unread, and a second piece that day read the obligations referred to a rules text beside a participant roll exported in five formats. None of them asked what the span between the buildings is made of, who put it there, or on what terms. The gift ledger and the minutes answer the first two.
Boundaries
- Everything here was read in two retrieval passes on 20 November 2026 — six pages at 09:01:52 UTC and six further documents at 09:07:13 UTC — and every passage is a provider-reported excerpt from returned page text. No page was opened in a browser session and no PDF was read as a page image.
- The contributors page is undated as a document; its newest entries carry the year 2026. "Donated" is that page's verb.
- No document read states a consideration, a motive or a counterparty obligation attached to any donation, and none is inferred.
- Donated fibre does not establish who lights, maintains, insures or repairs the span. Dark-fibre strands, an indefeasible right of use and a gift of capacity are different objects, and the pages read do not say which is on offer.
- The bounded absence is scoped to the nine documents listed above. It is not a claim that SIX publishes no transport terms anywhere.
- The April 2024 minutes are a meeting record, not a contract, and the zero-cost sentence is attributed to a speaker named only as Chris.
- Minutes for 2025 and 2026 were not read; the 2022 and 2023 minutes describe a plan and its completion.
- No inter-switch capacity is printed for the Westin Building in the text received, and nothing is inferred from that.
- The link figures are capacities, not measured traffic, and no utilisation is claimed.
- Three 400G circuits to 1.2 Tbps and three 100G circuits to 300 Gbps are my multiplications reconciling two printed pages, not statements by SIX (ARITH-1, ARITH-2).
- 12 per cent times ten months to 120 per cent is my arithmetic on two printed numbers and says nothing about what spreading payment is worth (ARITH-3).
- 300 Gbps divided by 20 Gbps to fifteen is my division on the March 2018 entry (ARITH-4).
- Port fees are quoted as printed, per port and per speed class, with no annualisation, averaging or conversion between classes.
- No claim is made that any donation is a subsidy, a discount, a favour or a marketing arrangement, and no impropriety is alleged against SIX, any carrier, any landlord or any member.
- No BGP session, looking glass, route collector, cross-connect order or traffic measurement was run for this article.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.