Summary
- On every configuration of Tesla's Megapack 2 XL datasheet, printed energy divided by printed AC power is the duration written into the configuration's own name: 2.0000, 4.0000 and 4.0019 hours. The megawatt-hour is a product, not a measurement.
- The buyer is invoiced in megawatt-hours, permitted in megawatts and warranted in a third unit — kilowatt-hours discharged per kilowatt-hour of nameplate — whose only seller-printed ladder on the record ends at 70 per cent in year 15 and permits roughly 0.82 full cycles a day.
- The same release prints $10,086 million of energy-segment revenue beside 31.4 GWh of storage deployed and divides neither. The quotient is mine, both perimeters are named, and no reviewed page quotes a price per kilowatt-hour for any configuration.
The sheet performs one multiplication and calls it a specification
The current Megapack 2 XL datasheet, revision 1.9 of 12 February 2025, sits in a Connecticut siting petition as Exhibit B and opens with a sentence that sounds like a menu: "Megapack is configurable. Standard configurations are 2-Hour cell option C010 or C011, 4-Hour cell option C010 or C011, and 4-Hour cell option C012." The table beneath it then prints three pairs of numbers and leaves the arithmetic to whoever is paying attention.
| Configuration, per Megapack | AC power | Energy | Energy ÷ power |
|---|---|---|---|
| 2-Hour, cell option C010 or C011 | 1,927 kW | 3,854 kWh | 2.0000 h |
| 4-Hour, cell option C010 or C011 | 979 kW | 3,916 kWh | 4.0000 h |
| 4-Hour, cell option C012 | 1,042 kW | 4,170 kWh | 4.0019 h |
The divisions are mine; the cells are the sheet's. Two of them close to four decimal places and the third misses by 0.0019 of an hour. The energy does not sit beside the power as an independent fact about the hardware. It is the power times the hours in the product's name, and the one configuration that does not close exactly is the one whose cells were most recently added, which is what you would expect of a number that is generated rather than measured.
Run the same sheet the other way and the product being sold looks less like a battery with a capacity and more like a nozzle. Moving from two hours to four buys 1.6 per cent more energy — 3,916 kWh against 3,854, sixty-two kilowatt-hours — and gives up 49.2 per cent of the power, 979 kW against 1,927, a difference of 948 kilowatts. The enclosure is the same box. What changed is how fast the buyer is permitted to empty it, and the price of a slower nozzle is measured in megawatts, not megawatt-hours.
That would be a harmless convention if the sheet then told you what the cells deliver. It does not. Across four revision dates spanning 1,188 days, revision 1.6 of 21 April 2023, revision 1.5.1 of 10 February 2023 and revision 1.0 of 12 November 2021 print the same family of cells, and not one of the four prints a usable energy distinct from nominal, a depth-of-discharge percentage, a capacity-retention percentage or an augmentation interval. The megawatt-hour on the sheet is a nominal, which is to say it is what the box holds at 25 °C on the day it leaves the factory, computed from two other printed numbers.
The qualifier moved, and then it left
Revision 1.0 is worth reading for the words around the numbers, because they have been quietly demoted. It introduces its table by calling the rows minimums, not nominals:
Megapack is available in 2-hour and 4-hour configurations. Minimum battery AC power and energy specifications are listed below.
At 1,927.2 kW and 3,854.4 kWh for two hours, and 969.6 kW and 3,878.4 kWh for four, the first sheet is also the only one whose footnote names the day it is talking about: "Nominal energy and RTE at 25°C (77°F) including thermal management loads, Day 1". It carries the warning "Specifications are preliminary and subject to change." Later revisions keep the temperature and drop the day. The current sheet says only that nominal energy is specified at 25 °C, and its efficiency footnote reads:
Full-depth cycle including all power conversion and thermal system losses, at 25°C (77°F)
So a floor became a nominal, and a nominal stopped saying it was a Day 1 figure. Neither change is an error. Both move information from the seller's side of the desk to the buyer's, because a number that is a minimum, at the beginning of life, at a stated temperature is a different promise from a number that is merely nominal at the same temperature.
The inverter carries a larger number in a different unit
Underneath the energy rows sits a third quantity that the same sheet never divides against them. Inverter power per Megapack is printed as 2,400 kVA maximum at two hours and 1,320 kVA maximum at four, scalable from 400 kVA in 50 kVA steps (revision 1.9). Set the AC rating against that ceiling: 1,927 kW over 2,400 kVA is 80.3 per cent, and 979 over 1,320 is 74.2 per cent. The blanket is 24.5 per cent larger than the rating at two hours and 34.8 per cent larger at four.
The comparison assumes a power factor of one, because the sheet prints kilovolt-amperes for the inverter and kilowatts for the rating and prints no power factor anywhere. Every ratio in this paragraph therefore holds only under that assumption, which is mine.
Here the revisions move in the opposite direction from the efficiency. Revision 1.0 printed a four-hour inverter maximum of 1,632 kVA; revision 1.5.1 and everything after it print 1,320. The four-hour AC rating barely budged, from 969.6 kW to 979 kW, a rise of 9.4 kilowatts or 1.0 per cent, while the ceiling fell by 312 kVA, 19.1 per cent. In revision 1.0 the rating sat at 59.4 per cent of the inverter; from 2023 onward it sits at 74.2 per cent. The same cell, the same enclosure and the same four hours now come with less silicon behind them, and no reviewed page says why.
One thermometer, one cycle, and a percentage that drifted
The efficiency figure is the only place the sheet admits that energy is lost between the terminals, and its boundary sentence is one line long. It specifies a full-depth cycle including all power conversion and thermal system losses at 25 °C. The nominal energy is specified at the same 25 °C. The operating ambient range is printed as −30 °C to 50 °C on the same page (revision 1.6). Inside an ambient envelope eighty kelvin wide, one temperature carries an efficiency figure and no other temperature carries any.
The footnote also declines to name its terminals. "All power conversion and thermal system losses" tells a reader that converter and cooling losses are inside the measurement; it does not tell him whether the cycle starts and ends at the DC blocks or at the AC output, and the difference between those two boundaries is precisely the quantity a project financier would want held constant.
What the percentage did across revisions is the part worth memorising. On identical AC power and identical energy cells, the two-hour round-trip efficiency fell from 92.5 per cent in revision 1.0 to 92.0 per cent in revision 1.5.1 and to 91.7 per cent in revision 1.6 and revision 1.9. The four-hour figure went from 94 per cent to 93.7. No reviewed page says which of the three two-hour values a contract guarantees.
Convert the drift into electricity and it stops being a rounding fight. To return 3,854 kWh at 92.5 per cent you must put in 4,166.5 kWh. At 91.7 per cent you must put in 4,202.8. That is 36.3 kilowatt-hours more on every full cycle, my division of the sheet's own cells, and it is paid for at the buyer's tariff for fifteen years rather than at the seller's factory gate.
The warranty counts in a third unit and calls it a counter
Now leave the datasheet. The sheet's warranty block promises coverage described as "All-inclusive, equipment and energy retention" over a term of "15 years standard, extendable to 20 years". Retention of what, measured how, is not on the sheet. The only seller-printed document in this set that answers those questions is not a Megapack document at all: it is Tesla's Powerpack limited warranty for the United States, effective 2 August 2019, and it is worth reading closely because it shows the grammar of the guarantee the Megapack line inherited.
Its ladder runs from 94.0 per cent at year 1 to 80.0 per cent at year 10, and then continues in the low-utilization case at 78.0, 76.0, 74.0, 72.0 and 70.0 per cent for years 11 to 15 (Powerpack limited warranty). Each rung is tied to a throughput figure measured in kilowatt-hours per kilowatt-hour of nameplate energy capacity: 3,104 by year 10, then 3,391, 3,672, 3,945, 4,211 and 4,469. Aggregate Discharge Throughput is defined as discharge at the inverter AC output. The remedy for a shortfall is Energy Shortfall Damages capped at 5 per cent of System Price, or repair or replacement. There is no augmentation obligation anywhere in the text.
Those counters are cycle counts in disguise, and dividing them by their own clocks gives the cycling rate the guarantee is conditioned on. The year-10 rung of 3,104 kWh per kWh over ten years is 310.4 full cycles a year, 0.85 a day. The year-15 rung of 4,469 over fifteen years is 297.9 a year, 0.82 a day. The extension is stingier than the decade it extends: the last five years admit 1,365 more cycles, which is 273 a year, 0.75 a day, twelve per cent below the rate the first decade allowed. Both divisions are mine, on 365-day years.
For the Megapack itself, the only printed numbers in this set come from a customer rather than the seller. A staff memorandum of the Oro Loma Sanitary District dated 7 January 2026 reports that at the end of fifteen years the Megapack 2 is warranted to provide a minimum energy retention of 70 per cent for a four-hour system, subject to an "Aggregate Discharge Throughput Limitation (4-hour system): 4,372 (4,372 cycles at 2,262.4 kWh = 9,891,212.8 kWh)". It also records that the fifteen-year term begins at commissioning or ninety days after the original sale, whichever comes first, and that the warranty is conditional on buying Tesla's preventive maintenance agreement.
Two arithmetic consequences follow, and both are mine. First, 4,372 cycles over fifteen years is 291.5 cycles a year, 0.80 a day; an asset cycling once a day reaches 4,372 in 11.98 years, before the term expires, so a fifteen-year floor at 70 per cent belongs to the asset that under-runs the counter. Second, the memorandum's per-cycle energy of 2,262.4 kWh is 57.8 per cent of the 3,916 kWh the datasheet prints for a four-hour unit. At full nameplate, the same 4,372 cycles would come to 17,120,752 kWh, 1.73 times the memorandum's own total of 9,891,212.8. Which of the two quantities the warranty counts is not stated in the pages read.
The memorandum also says "Megapack 2" where the sheet says "Megapack 2 XL", and it is a paraphrase of an exhibit rather than the exhibit.
The schedule the contract numbers twice
Tesla's own published Megapack purchase agreement is where the missing table should live, and it is where the numbering comes apart. Clause 13.1 reads:
- Project Warranties. 13.1 BESS Limited Warranty. Tesla provides the manufacturer's limited warranty for the BESS as set out in Schedule 2 (the "BESS Limited Warranty").
The schedule index of the same document lists the BESS Limited Warranty as Schedule 4 (Megapack purchase and installation agreement), and the retrieved text carries the clause, the index and a fifteen-year maintenance term running from the Start Date, but not the retention table itself. So the datasheet promises energy retention, the purchase agreement points at the schedule that quantifies it, and that schedule is numbered two different ways in one document and printed in neither page read. The one number a buyer's financial model cannot be built without is the one the paperwork keeps pointing to.
Tesla prints both operands of a price and divides neither
The other half of the story is in the filings, and it is a pair of rows sitting in the same table. Tesla's quarterly update for the three months to 30 September 2025 prints energy generation and storage revenue of 2,376, 3,061, 2,730, 2,789 and 3,415 million dollars across five quarters, and storage deployed of 6.9, 11.0, 10.4, 9.6 and 12.5 GWh across the same five columns, both marked unaudited (Q3 2025 update, Exhibit 99.1). The annual filing prints the same kind of pair for a year: 31.4 GWh of energy storage products deployed in 2024 against energy generation and storage revenue of $10,086 million, a rise the filing attributes primarily to a 16.7 GWh increase in Megapack and Powerwall deployments (2024 Form 10-K). The segment schedule confirms the revenue line and adds cost of revenues of $7,446 million and gross profit of $2,640 million (segment schedule).
Now do the division nobody at the company does. Ten thousand and eighty-six million dollars over 31.4 million kilowatt-hours is $321.21 per deployed kilowatt-hour for 2024. For the third quarter of 2025 it is $3,415 million over 12.5 million kWh, or $273.20. For the third quarter of 2024 it is $344.35. The fall is 20.7 per cent. All four figures are mine, and the rounding in the printed rows puts roughly two dollars on each.
The third-quarter row also stages a reconciliation the filing does not perform. If the 16.7 GWh increase is like for like, then 2023 deployment was 31.4 minus 16.7, or 14.7 GWh, and $6,035 million over 14.7 million kWh is $410.54 per kilowatt-hour against $321.21 in 2024, a fall of 21.8 per cent. The filing prints no 2023 deployment total, so 14.7 is my subtraction under a stated assumption and not Tesla's number.
What those figures are not is a price list, and the difference matters. Tesla defines the deployment it counts to include "both customer units when installed and equipment sales at time of delivery". The numerator is revenue recognised; the denominator mixes installed capacity with equipment handed over; and the segment includes Powerwall and services. The quotient is an average across perimeters, and the perimeters are the buyer's problem, not the seller's.
Carry the average back to one unit and the geometry of the product appears. At $321.21 per deployed kilowatt-hour, a four-hour unit's 3,916 kWh carries $1,257,858 of revenue and, at the printed gross margin of 26.2 per cent, $329,243 of gross profit. A two-hour unit's 3,854 kWh carries $1,237,942. Expressed per kilowatt of AC rating those two numbers separate by a factor of two: $642.4 per kW for the two-hour unit, $1,284.8 per kW for the four-hour. The same money buys half the megawatts when the buyer orders four hours.
Every figure in this paragraph is mine, computed at segment averages that include products this datasheet does not describe.
Finally, the couple of rows reconcile to a unit count nobody prints. 31.4 GWh divided by 3,916 kWh is 8,018 four-hour units; divided by 3,854 kWh it is 8,147 two-hour units. Tesla publishes no unit count, so the count is the reader's.
The grid writes the same fraction
A grid does not buy a battery; it grants a permission and registers a resource, and the permission is written in the other unit. Minnesota's Public Utilities Commission docket 24-279 describes a project called Snowshoe as a battery energy storage system "with a nominal power rating of up to 150 megawatts (MW) alternating current (AC) with approximately 600 megawatt-hours (MWh) of energy capacity", on some 28 acres in Kalmar Township, Olmsted County, with an Order and Final Site Permit dated 22 September 2025 on the docket.
Divide the docket's two numbers and you get four hours: 600 MWh over 150 MW is 4.0. Divide them by the datasheet's own cells and you get a unit count that agrees with itself to the first decimal in both directions: 600,000 kWh over 3,916 kWh is 153.2 units, and 150,000 kW over 979 kW is 153.2 units. The permitting document's ratio and the product sheet's ratio are the same ratio, which is why the mandated energy duration of a storage interconnection is the quiet specification behind a great deal of procurement language.
The filing side never says this. The 10-K's only printed definition of the unit is a way of grouping boxes: Megapack is described as being groupable into "larger installations of gigawatt hours ("GWh") or greater capacity". That is an energy. The permit's permission is a power. The sentence that would join them — the one that says how many hours the installed fleet is expected to run — appears in no reviewed page.
Three units, three owners, one divisor
Put the documents end to end and the structure is plain. The seller invoices a nominal energy computed at one temperature and no longer labelled as beginning of life. The grid registers an AC power at the point of interconnection. The warranty counts aggregate discharge at the inverter AC output, caps it in cycles per kilowatt-hour of nameplate, and pays a remedy capped at 5 per cent of the system price. Those three quantities have different owners, different measurement boundaries and different clocks, and they are not convertible into one another by anything printed in any of the documents.
The conversion is the duration, and the duration lives in the purchase order — in the words "2-Hour" and "4-Hour" that name the cell option and set both the megawatt-hour and the megawatt.
That is why the marketing number is the least interesting number on the sheet. A buyer who asks what a Megapack holds gets a product of two other cells. A buyer who asks what it can deliver gets a permission in megawatts and an inverter rated above it in kilovolt-amperes. A buyer who asks what it will still deliver in year fifteen gets a percentage in a customer's memorandum, conditioned on a counter whose rate is under one full cycle a day, on a warranty term that starts ninety days after a sale whether or not the site is ready, and behind a maintenance agreement he must buy.
The other thing the structure explains is why nobody publishes the one figure that would settle a comparison. A price per kilowatt-hour by configuration would expose the factor of two between the two-hour and four-hour unit immediately, and the retention table would expose how much of that price is guaranteed. Both exist somewhere; the schedule is numbered and unprinted, and the price list is not in the pages read.
So here is the test I would put to any storage datasheet, including this one. Multiply the printed power by the printed duration and see whether the answer is the printed energy. If it is, the headline is a definition and the specification is elsewhere. Then find the temperature, the terminal, the year and the counter that the percentage is conditioned on, and check whether the warranty counts the same kilowatt-hour the sheet sells.
On this sheet, across eleven documents read on 26 November 2026, the multiplication closes and the rest does not have to: the same enclosure is a two-hour asset or a four-hour asset according to an order form, and the hours a buyer picks set the megawatts he is allowed, the cycles his warranty will tolerate and the dollars his project will be asked to carry for fifteen years.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.