Summary

  • A Korean fire extinguisher carries a type-approval number, and the Korea Fire Safety Institute's own lookup screen takes that number as its search term and answers with five columns, none of which says whether the approval still stands.
  • The cancellation list prints the same approval number beside a cancellation date but no approval date, so the two tables each hold one end of the interval a buyer needs; the statute that orders publication names the maker and the defect, and never the number.

The Institute publishes a screen built for that number. 승인번호조회 takes the approval number itself as the search term — the page's own example is a string in the form 약 13-6 — and returns five columns: company, item category, approval number, approval date, type (KFI, 승인번호조회). Under the table sits a sentence that repays a second reading: the service is offered for a customer's convenience and cannot be used as legal proof. The catalogue beside it answers the same way, sorting by item category and date range and returning the same five columns, with Excel and CSV download and an open API on offer (KFI, 소방용품 형식승인 정보).

Now the register. The Institute's cancellation list prints six columns: company, item category, approval number, cancellation date, type, reason (KFI, 소방용품 형식승인 취소정보).

Set the two tables side by side and count, as I did on 27 November 2026. Five columns for the buyer, six for the register. Four are shared: company, item category, approval number, type. One belongs only to the buyer's screen, and it is the approval date. Two belong only to the register: the cancellation date and the reason. Columns on the buyer's screen that state whether the approval is still in force: none of the five. On the register none is needed, because the presence of a row is the statement.

The interval between a grant and its withdrawal is what a buyer wants and what neither page prints. The lookup holds the start. The register holds the end. The approval number is the only field that could join them, and it is the single field printed on both. No page in the set I read performs that join.

The register's header row opened for me on 27 November 2026 and its data rows did not, which is a fact about the copy I read rather than about the register. So the only available count of cancellations is the public-data portal's: 11,641 rows, six fields, registered on 22 May 2014 and last modified on 31 July 2025 (공공데이터포털, 소방용품 형식승인 취소정보). That description also says what the rows cover — cancellations of type approval, of performance certification and of KFI certification together. Three schemes, one total, no split printed. I will not divide 11,641 by three: the three populations are not stated to be of similar size, and a quotient would invent the thing the page omits.

The statutes are where this stops being a filing complaint. Article 12(1) of the Enforcement Rule of the Act on Installation and Management of Fire-Fighting Systems hands the criteria for cancelling a type approval, and for suspending a product inspection, to 별표 6, and cites Article 39 of the Act as the provision it serves (소방용품의 품질관리 등에 관한 규칙). The annex draws a two-track ladder (별표 6): an approval, or a product inspection, obtained by fraud or other improper means goes straight to cancellation; falling short of the test-facility standard or of the technical standard earns a correction order, then a suspension of three to six months, then cancellation on the third violation.

Article 12(2) and (3) add a quieter route. The holder of an approval may ask for its own cancellation, filing the prescribed form with the certificate it was issued, and may not do so while a cancellation proceeding is already under way. The register's six fields include a reason and no separate field for who moved — the instrument distinguishes a company's own withdrawal from a regulator's decision, and the public list does not.

Who cancels is worth reading twice. Article 39 of the Act places cancellation with the Commissioner of the National Fire Agency, 소방청장, and Article 50(2)(4) permits that cancellation work to be delegated to the Institute (소방시설 설치 및 관리에 관한 법률). My reservation for this piece assumed a single hand: the body that grants also withdrawing. The current text is more interesting, and the mistake in my assumption is worth naming because it is a common one. The Commissioner cancels. The Act allows the Commissioner to hand that work to the Institute. The Institute publishes the record either way. Reading a publisher's custody of a list as proof of its power to make the entries is the error; custody is not power, and a directory that answers one question perfectly gets read as answering the next one too. A 2015 legal interpretation by the Ministry of Government Legislation had held that the Institute, delegated only the approval and changed-approval work, could not cancel at all (법제처 법령해석). It was written against the numbering of its own period, citing Article 38 and naming a minister who no longer holds the office; whether the present enforcement decree exercises the new permission to delegate is not established by any page I read.

Then the notice. Article 45(4) of the Act requires the Commissioner to publish the fact of a recall, exchange, disposal or sale-suspension order, or of the cancellation of a type approval or performance certification, on the Agency's homepage (소방시설 설치 및 관리에 관한 법률 제45조, a secondary compilation whose text agrees with the rule). The detail is left to the ministerial rule, and Article 40(7) of that rule fills it in with four items (소방용품의 품질관리 등에 관한 규칙 제40조): the matters concerning the product's type approval and performance certification; the fact of the serious defect; the manufacturer's or importer's name, representative and location; and whatever else the Commissioner considers necessary. Four items. Items among them that name the approval number: none. Items that could carry the identification without naming it: at least two.

So the notice the statute orders, published by the office that cancels, may identify the product by its maker, its defect and the general heading of type-approval matters, while the object in a buyer's hand carries a number the notice never has to print.

A number checked once and then trusted is precisely the arrangement a 2020 audit described. A trade paper reported on 1 April 2020 that the Board of Audit and Inspection had found a company under administrative disposition carrying on the sale of the same product within the same item by moving to a different approval number, and concluded that this must not be allowed to recur (FPN Daily, 1 April 2020).

The test that would settle the classification is one page, and I can state it as a condition with its consequence. Give the buyer's screen one more column, carrying the cancellation date where a row exists in the register, and the interval stops being an exercise: the number stamped on the cylinder becomes a question with an answer, and the fourth column of the notice becomes unnecessary. Leave the notice to carry the number instead, and the same thing happens from the other end, in a document addressed to the trade. Either way, the join that the approval number already makes possible becomes a page.

The Korea Fire Safety Institute is the institution that tests and approves these products, and it is one actor in a chain this text spreads across three offices; the directory card behind this piece sits at Korea Fire Safety Institute and anchors the approving and publishing function, not the canceling one. Across the twelve pages I read on 27 November 2026, no page computed the interval between the grant of a type approval and its cancellation, no notice page from the National Fire Agency was located to test against, and the open API attached to the cancellation dataset was identified but never queried. The number, meanwhile, stays where it was stamped.