Summary

  • Globe Telecom sold 7,506 towers to four buyers and leased them back for an initial 15 years; its audited accounts show PHP 85,842,274 thousand of net proceeds across 2022–2025 against PHP 129,245,456 thousand of lease liabilities at 31 December 2025, so the recorded obligation is 1.51 times everything the programme raised.
  • The sale price per tower is printed and almost immovable — about PHP 12.84 million, within 0.4 % across three issuer documents — while the annual rent per tower appears on no page of the eight documents read on 27 November 2026; the nearest bound, PHP 2.10 million a tower a year, is a ceiling built from a payments line that covers every lease class Globe has.

Two numbers, one object

Start with the only sentence in the file that explains the whole structure. In the disposition disclosure it filed with the Philippine Stock Exchange, Globe Telecom, Inc. states the manner of its tower transaction: the sale and leaseback terms, including closing conditions, are subject to confidentiality, and the deal was negotiated between the parties. That sentence is why a reader can find the price of a Philippine tower to the peso and cannot find its rent at all.

What the same disclosure does print is the transaction as announced. On 11 August 2022 the board approved the sale of 5,709 telecommunication towers and related passive infrastructure for approximately PHP 71 billion: 2,180 towers to MIESCOR Infrastructure Development Corporation for about PHP 26 billion and 3,529 to Frontier Tower Associates Philippines, Inc. for about PHP 45 billion, with an estimated post-tax gain of PHP 13.5 billion, subject to the carrying amount at actual sale. The first closing followed on 23 September 2022 with 800 Frontier towers for roughly PHP 10.2 billion, the second on 14 October 2022 with 701 MIDC towers for roughly PHP 8.4 billion, and the eighth and final Frontier closing on 23 July 2024 with 1,037 towers for roughly PHP 13.17 billion, completing 3,529 of 3,529 (https://edge.pse.com.ph/downloadHtml.do?file_id=1545590).

Two more portfolios followed or expanded. The August 2022 release fixed the programme's shape — over 7,000 towers, 66 % in Luzon, 19 % in Mindanao, 15 % in Visayas, 79 % ground-based and 21 % rooftop, each portfolio leased back for an initial 15 years, with roughly 75 % of proceeds earmarked for capital expenditure and 25 % for 2023 debt servicing (https://www.globe.com.ph/sites/default/files/reports/secpse/2022/C.%20Other%20Reports/V.%20Other%20Disclosures/GLO-Press-Release-220811_v3.pdf). The September 2022 release added the third portfolio: 1,350 towers to Phil-Tower Consortium, Inc. for PHP 20 billion, 90 % ground-based and 10 % rooftop, primarily in Visayas and Mindanao, leased back for an initial 15 years, with an expected post-tax gain of PHP 5.2 billion and a programme total, at that date, of 7,059 towers and about PHP 91 billion (https://www.globe.com.ph/sites/default/files/reports/secpse/2022/C.%20Other%20Reports/V.%20Other%20Disclosures/GLO-17C-Press-Release-on-PhilTower-v3-PSESECReceived23Sep2022.pdf). Unity Digital Infrastructure's 447 towers completed the set, and the fourth-quarter 2024 release records the tally: 7,506 towers sold, 6,672 turned over by 31 December 2024, about PHP 85.7 billion raised, 88.9 % of the total deal, with 2,410 towers transferred in 2022, 2,057 in 2023 and 2,205 in 2024, plus Unity's last two closings of 25 towers for about PHP 300 million on 28 October 2024 and 19 towers for about PHP 228 million on 19 December 2024, taking Unity to 326 of its 447 (https://www.globe.com.ph/sites/default/files/reports/secpse/2024/B.%20Quarterly%20Reports/IV.%20Quarterly%20Results%20Press%20Release/glo-4q24-press-release.pdf). Five months earlier the same count had stood at 6,628 of 7,506 towers and about PHP 85.2 billion, with 2,161 towers transferred in the year to that date for about PHP 27.8 billion and a final Frontier tranche of 84 % ground-based and 16 % rooftop sites (https://www.globe.com.ph/sites/default/files/reports/secpse/2024/C.%20Other%20Reports/V.%20Other%20Disclosures/GLO_Press-Release_Frontier-Towers-8th-closing_0723.pdf).

The obligation outgrew the sale

Now the other printing. The audited consolidated statements of financial position carry lease liabilities in two rows, current and non-current. Add them and the obligation to keep standing on the steel ran PHP 88,724,482 thousand at 31 December 2023, PHP 116,107,874 thousand at 31 December 2024 and PHP 129,245,456 thousand at 31 December 2025 — PHP 5,899,426, 8,175,643 and 9,067,593 thousand of it current, and PHP 82,825,056, 107,932,231 and 120,177,863 thousand of it beyond the year (https://www.globe.com.ph/sites/default/files/reports/secpse/2024/A.%20Annual%20Reports/II.%20Audited%20Financial%20Statements/globe-2024-conso-afs.pdf, https://www.globe.com.ph/sites/default/files/reports/secpse/2025/A.%20Annual%20Reports/II.%20Audited%20Financial%20Statements/pse-disclosure-globe-telecom-inc-and-subsidiaries-2025-consolidated-fs-redacted.pdf).

The proceeds sit two lines above in the same statements, in investing activities, labelled net. They were PHP 29,940,218 thousand in 2022, PHP 24,858,693 thousand in 2023, PHP 27,821,162 thousand in 2024 and PHP 3,222,201 thousand in 2025. That is PHP 85,842,274 thousand in total, and the arithmetic of the whole commission is this: the obligation recorded at the end of 2025 exceeds every peso the programme raised by PHP 43,403,182 thousand, or 1.51 times the proceeds, with the excess alone equal to 50.6 % of the proceeds. Both operands are printed cells of the same issuer's audited statements. Neither page performs the division.

The quotient is mine and it is stated as mine.

The gain line is printed beside the proceeds, likewise labelled net, and it runs the other way. The net gain on sale and leaseback of telecom towers was PHP 8,260,927 thousand in 2022, PHP 7,258,378 thousand in 2023, PHP 3,482,083 thousand in 2024 and PHP 380,717 thousand in 2025 — PHP 19,382,105 thousand in all, which is 22.6 % of the proceeds. So the transaction is not a piece of accounting that flatters one year and burdens nothing. It is a trade: a fifth of the cash comes back as reported profit, immediately, and the obligation to keep the towers standing arrives in full, afterwards.

The rent line that never decays

Payments of lease liabilities are in the cash flow statement, in financing activities, and they were PHP 6,878,960 thousand in 2022, PHP 15,841,394 thousand in 2023, PHP 17,035,519 thousand in 2024 and PHP 15,731,076 thousand in 2025. Set them against the gain booked in the same year and the ratio moves from 0.83 to 2.18 to 4.89 to 41.3. The first number is small for a mechanical reason worth stating: 2022's payments cover only the part of the year after the first two closings of 23 September and 14 October, and the payments line covers every lease class the company has, not only the towers. The direction survives both caveats.

The gain decays towards zero as the programme completes; the rent does not decay at all.

In the last year of the programme the same comparison is brutal in a way that needs no interpretation. Globe raised PHP 3,222,201 thousand from tower disposals in 2025 and paid PHP 15,731,076 thousand on leases in the same twelve months — 4.88 times what the sale raised. Whatever else the programme did, in 2025 the towers were no longer funding the company; the company was funding the towers.

What entered the liability

A reader can go one step further and watch the obligation grow rather than merely stand. Across 2024 and 2025 the lease liability rose from PHP 116,107,874 thousand to PHP 129,245,456 thousand, an increase of PHP 40,520,974 thousand, while PHP 32,766,595 thousand of principal was paid (PHP 17,035,519 thousand in 2024 and PHP 15,731,076 thousand in 2025). Add the principal back and PHP 73,287,569 thousand of new lease obligations and accretion entered those two years, against PHP 31,043,363 thousand of net proceeds from the same two years — 2.36 times.

The read set does not split accretion from newly recognised obligations, so 2.36 times is stated as what it is: a composite, and the honest reading is that the liability grew faster than the sale that was supposed to be financing it.

The right-of-use asset tells the same story from the other side. Net right-of-use assets were PHP 69,538,796 thousand at the end of 2023, PHP 90,464,458 thousand at the end of 2024 and PHP 99,418,585 thousand at the end of 2025. Divide the liability by that asset at each date and the answer is 1.276, 1.284 and 1.300 — a stable relationship, drifting gently upwards. This is not an accident of one year's measurement. It is what a lease portfolio built on a 15-year initial term with a 20-year asset life looks like once it matures: the obligation and the right to use the asset march together, and the obligation stays a little ahead.

The clock the lease changes

That gap between 15 and 20 years deserves its own paragraph, because it is the clearest thing the structure does to the asset. Globe's accounting policy gives telecommunications equipment a tower a useful life of 20 years, and buildings 20 to 25. The leaseback of the towers runs for an initial period of 15 years, by the company's own description in two release documents. Depreciate owned steel over 20 years and it costs 5.00 % a year. Amortise the right to use leased steel over 15 and it costs 6.67 % a year — 1.33 times as fast.

The same physical object consumes its place on the income statement a third quicker after the title moves than before it. That is not a criticism of the accounting; it is what the contract says, and the difference is the price of having converted an owned asset into a timed one.

A price that barely moves

Here is the number the company is happy to have read. At 31 December 2024, 6,672 towers had generated about PHP 85.7 billion: PHP 12,844,864 a tower, or about PHP 12.84 million. At 23 July 2024, 6,628 towers had generated about PHP 85.2 billion: PHP 12,854,556 a tower, about 0.08 % apart. And the programme's own expectation, 7,059 towers for about PHP 91 billion, implies PHP 12,891,344 a tower, which the realised figure at the end of 2024 sits 0.36 % below. Three documents, one arithmetic, and a unit price that moves by less than half of one percent across five months of closing and two years of programme.

Both operands of each of those quotients sit on one page of the document that prints them; the division is mine.

That stability is worth pausing on, because it is the strongest evidence that the buyers were pricing the same thing. Philippine tower assets changed hands in 2022, 2023 and 2024 at a price the seller can compute to the peso and a rent the seller does not print. The price series is a fact about the market. The missing rent is a fact about the disclosure.

Three buyers, three prices

Within that stability there is a spread, and it runs in one direction. MIDC paid about PHP 26 billion for 2,180 towers: PHP 11,926,606 each. Frontier paid about PHP 45 billion for 3,529: PHP 12,751,487. PhilTower paid PHP 20 billion for 1,350: PHP 14,814,815, which is 24.2 % above MIDC's unit price. Three agreements signed within six weeks of each other, three prices per tower, and the last of them the highest. Everything after that is inference and I will flag it as such: PhilTower's portfolio was smaller, weighted towards Visayas and Mindanao, and carried a slightly higher ground-based share (90 % against the programme's 79 %).

Whether the premium paid for geography, for portfolio size, or for a different tenancy assumption is not stated on any page read here. What is stated is the sequence.

What the pages do not print

This is the boundary, and it needs a date and a document set rather than a rhetorical flourish. Across the eight documents read on 27 November 2026 — the 2024 and 2025 consolidated financial statements, the exchange's disposition disclosure, four issuer releases and one exchange summary page — no page prints the annual rent for one tower, the rent per tenancy, the incremental borrowing rate, the interest charged on lease liabilities, the maturity ladder by year, or a split of the liability and the right-of-use asset by asset class.

The bodies of note 11, note 13.1, note 13.2, note 24 and note 25 were not opened in this reading; their contents are unread, not absent, and the boundary is a count over the documents actually inspected.

The reason for the gap is not mysterious, because the issuer said so: the terms, including closing conditions, are confidential. What follows from that is the interesting part. Confidentiality was applied to the unit rent. It was not applied to the total. An auditor cannot sign a balance sheet without quantifying the obligation, so the obligation is printed in full — while the price per unit of it stays inside a negotiated contract. The seller controls which of the two numbers a reader meets first, and the one met first is the flattering one.

One number can still be bounded, and it should be labelled a ceiling rather than a measurement. Divide the 2025 payments of PHP 15,731,076 thousand by the 7,506 towers sold and you get PHP 2,095.8 thousand a tower a year, about PHP 2.10 million, equal to 16.3 % of the PHP 12.84 million realised price. Because the payments line covers every lease class Globe has — land, offices, vehicles and network equipment as well as the sold towers — PHP 2.10 million is a ceiling on the tower rent, not the tower rent.

Set that ceiling against the sale price and the price pays itself back in 6.13 years of rent before a single peso of operating cost on the tower. Two limits, both named in the same paragraph, so the reader can see which way each one runs.

Two portfolio-wide quotients are worth having for the same reason, each carrying its caveat in the sentence. The whole programme's proceeds, PHP 85,842,274 thousand, are worth 5.46 years of 2025 lease payments; the recorded liability, PHP 129,245,456 thousand, is worth 8.22 years. The second is an indicator rather than a measurement, because the liability is discounted and the payments are not, and the undiscounted obligation is larger — so the true remaining term is longer than 8.22 years, not shorter.

What the audited figures do and do not reconcile

The audited net proceeds and the investor-facing gross figure are two different objects and should stay that way. The 2022–2024 audited net lines add to PHP 82,620,073 thousand; the release told investors about PHP 85.7 billion of gross proceeds at the end of 2024. The gap is PHP 3,079,927 thousand, or 3.6 % of the gross, and it carries both transaction costs and the timing of receipts. The documents never distribute it between them, so neither do I.

The realised gain and the promised gain are also two different objects, on two different tax bases. Globe told investors to expect PHP 13.5 billion for the first two portfolios and PHP 5.2 billion for the third: PHP 18.7 billion for 7,059 towers. The audited net gain across 7,506 towers came to PHP 19,382,105 thousand. Realised slightly exceeds promised, and the comparison is offered as a comparison of bases and nothing more, because the read set does not reconcile the tax treatment of the two figures.

And one line rises where a reader might expect it to fall. Assets classified as held for sale went from PHP 64,199,816 thousand at the end of 2023 to PHP 69,569,171 thousand at the end of 2024, an increase of PHP 5,369,355 thousand, in the very year the programme transferred 2,205 towers. The read set does not say what sits in that line. It is an open question on the record, not a finding, and it is put here so that nobody later reads a rising held-for-sale balance as evidence about towers when the documents never say so.

The balance sheet after the programme

The programme is nearly done, and the obligation outlived it. The programme arithmetic closes exactly: 5,709 towers from the first two portfolios plus 1,350 from PhilTower plus 447 from Unity gives 7,506, which also equals the 7,059 announced in September 2022 plus Unity's 447. Of those, 6,672 were transferred by the end of 2024 — 88.9 %, reproducing the printed percentage to the digit — leaving 834 towers, 11.1 % of the programme, still to move.

What the balance sheet looks like afterwards is on the exchange's own summary page, and it is worth reading as a single identity rather than three facts. At 30 September 2026 total assets were PHP 680,053,333 thousand against PHP 655,991,907 thousand at 31 December 2025; total liabilities PHP 512,671,078 thousand against PHP 481,472,893 thousand; stockholders' equity PHP 167,382,255 thousand against PHP 174,519,014 thousand (https://edge.pse.com.ph/companyPage/financial_reports_view.do?cmpy_id=69). The identity closes to the thousand: assets rose PHP 24,061,426 thousand, liabilities rose PHP 31,198,185 thousand, equity fell PHP 7,136,759 thousand, and 31,198,185 minus 7,136,759 is 24,061,426. The direction of travel after the last tower closes is therefore issuer-sourced: nine months, thirty-one billion pesos more liabilities, seven billion less equity.

The quotient nobody needed

Six parties touch this transaction and not one of them needs the division. The buyer needs a yield on a single-tenant asset with a fifteen-year contract attached. The seller needs a gain and a pile of cash in the year the board promised it. The auditor needs the discounted total, which is what a lease liability is. The exchange needs the disclosure it asked for, which the confidentiality clause satisfies. The lender reads the lease in the maturity analysis it is already buying. The rating analyst reads the ratio of lease liability to right-of-use asset, which reproduces at 1.276, 1.284 and 1.300 and needs no tower count at all.

Each of the six gets its number. The one figure nobody in the chain requires — the annual rent of one tower as a share of the price that tower fetched — is the figure that tells a stranger whether the sale was a sale.

So compute it and say whose arithmetic it is. One tower sold for about PHP 12.84 million and is rented back for no more than about PHP 2.10 million a year: 16.3 %, repaid in 6.13 years at the ceiling. The steel is depreciated over 20 years and the lease runs 15, so the right to use it costs 6.67 % a year against 5.00 % owned. The obligation on all lease classes is 1.51 times everything the programme raised. The gain booked across four years is 22.6 % of the proceeds, and the rent paid in the final year of the programme was 4.88 times what that year's disposals raised.

Every one of those numbers is built from printed cells, every division is marked as mine, and the only cell that would turn the ceiling into a measurement — the annual rent of one tower, per the contract — is the cell the contract chose not to publish.

Globe Telecom Inc. is in the directory with its own record of what it operates and what it holds: https://btw.media/en/directory/globe-telecom-inc-ph. The record will keep saying it owns a network. The accounts say it now rents part of what the network stands on, and that the rent, capitalised, is worth more than the steel fetched. Both statements are true. Only one of them is printed per unit.