Summary

  • GÉANT's annual report prints one dated traffic volume — 3.6 exabytes moved across the network in calendar 2025 — and the same public record also carries an undated +30 per cent average annual growth rate, a capability sentence about multiple 100 Gbps per fibre link, and a procurement objective expressed in multiples of 100 Gbps.
  • The connected-network count appears as 34, 37, 38, 42, 43 and 44 on six surfaces because six surfaces count six different objects, and no document read prints per-link utilisation, an averaging window, a peak or a reference date for any capacity figure.

The one number with a period attached

The clearest sentence in the set sits in the annual report: the backbone "saw continued growth in traffic levels, with 3.6 exabytes of data moved across the network in 2025" (GÉANT Annual Report 2025). That is a measurement in the only sense a reader can audit — a quantity, a unit, a counting layer (the network as a whole) and a calendar period. It is also self-reported, and no independent metering of it was read.

It is worth doing the division the report does not do, because the result shows what kind of number this is. Three point six exabytes across a 365-day year is about 9.86 petabytes a day, about 114 gigabytes a second, or roughly 0.91 Tbps averaged across the entire network. That is my arithmetic, and it measures no link and no peak: an average over a year across a whole backbone will always be far below what any single circuit carries at any moment.

The rate with no window

The second register is a rate. On the GN4-3N project page, a headline reads "+30%" over the line "Average annual increase in network traffic over last five years" (GN4-3N project page). The page prints no publication date, no base year, no starting volume, no closing volume and no method, so "last five years" is relative to an undated page. As a reported reading of that page rather than a verbatim table, the figure stands alone: a percentage with no denominator anywhere beside it.

It is a traffic-growth rate, not a capacity increase, and it is not a Tbps quantity. Compounding it shows how much work the missing base does: at 30 per cent a year for five years the fifth year would be about 3.7 times the first — again my arithmetic — and without a starting volume that multiple cannot be checked against a single byte on the wire.

The design sentence

The third register is a capability. The GN5-1 compendium report states that "the core backbone is capable of multiple 100 Gbps over each fibre link, and Terabit connectivity can be achieved by a single node" (GN5-1 Compendium Report). That is an engineering statement about what the plant can do, and it is the sentence most likely to be read as a measurement by someone skimming for capacity. It is not one. A link capable of multiple 100 Gbps and a link currently carrying a stated load over a stated window are different claims, and only the second one answers the question a buyer of capacity actually asks.

The same compendium was reported to give an aggregate international capacity of nearly 1.9 Tbps, including 1 Tbps toward the USA and Canada, and to record 44 NRENs interconnected during GN4-3. Those are a capacity stock and an earlier interconnection count; neither is a per-link rate.

The instrument

The fourth register is money and dates, and here the record is at its most precise. CORDIS records GN5-2, coordinated by GÉANT Vereniging, running from 1 January 2025 to 30 June 2027, with an EU contribution of €80,000,000.00 against a total cost of €115,314,953.75 (CORDIS GN5-2). The same fact sheet lists 38 participants and states the objective as capacity ahead of demand in the backbone and NREN access in multiples of 100 Gbps, targeting Terabit/s connectivity where needed. That is a procurement target, dated and priced.

The predecessor is printed the same way: GN5-1 ran from 1 January 2023 to 31 December 2024, with €55,000,000.00 of EU contribution against a total cost of €82,769,532.50 (CORDIS GN5-1). The EU share works out at about 69.4 per cent for GN5-2 and about 66.4 per cent for GN5-1 — my arithmetic on the publishers' own two figures — and about €2.67 million a month for GN5-2 across its 30 months. A grant is a grant: it is not a price, and it is not a cost per unit of traffic carried.

One label in this register does not close. The main GN4-3N impact page was read as printing €50.5M as a total budget, while a second GÉANT page separates "Total budget: €63.125M" from "EC contribution: €50.5M" (GN4-3N: building the future). The €50.5M EC contribution is consistent across both pages; the undifferentiated total-budget label is not. I report the two readings and adopt neither.

Six counts, six nouns

Then there is the count of the network itself, which is where a reader is most likely to feel a contradiction and least likely to find one. On the surfaces read: 34 connected countries on the GN4-3N page, in a project that ran 2019–2023; 37 National Research and Education Networks, one representative member and associates on the membership map (GÉANT Membership map, November 2026); 38 partners including the Association plus one associated partner and 43 countries on the project page (The GÉANT Project); 42 country labels in the extracted text of the November 2026 topology map (GÉANT Topology Map, November 2026); 43 European NRENs on the vision page (Vision, mission, strategy); and 44 NRENs interconnected during GN4-3 in the compendium.

Six numbers, six counted objects: connected countries inside a closed project, association members, project participants, map labels, countries counted at project level, and an earlier era's interconnection tally. The vision page's 43 can be reconciled with the membership map's 37 by adding the five Nordic NRENs represented through NORDUnet and one associate — that reconciliation is my arithmetic, not a published formula, and no page I read prints it. A count is only a claim about the set it names, and these pages name different sets.

What the map does grade

The November 2026 map is a footprint diagram, and the property it grades on its links is tenure rather than speed: fibre, spectrum, leased capacity, or connected via NORDUnet. That is a real and useful distinction — it tells you who holds the glass — but tenure is not volume, and a legend that says how capacity is held says nothing about how much of it there is. The map's extracted text carries no per-link bit rate. Its legend could not be read, so per-link capacity is neither confirmed nor excluded here.

The document that would close it

Put the four registers side by side and the shape of the record becomes clear. A dated annual total. An undated rate. A capability. A target with a price and an end date. Only the first is a measurement of what the network did, and even that one measures the whole network over a year, not a link over a window.

The document that would close the gap is unglamorous: a periodic capacity and utilisation report, per link, with a stated averaging window and a reference date, published on a schedule. Nothing exotic — the kind of report an operator writes for its own engineering meetings. Without it, every capacity statement in the public record is either a capability or a commitment, and a reader who wants to know what the backbone is carrying this quarter has to divide an annual total by the number of seconds in a year and pretend the answer is a link.

Boundaries

  1. Eleven GÉANT and European Commission documents were read on 24 November 2026 through provider-reported extracts, and nothing else is a source.
  2. Direct retrieval of several GÉANT pages and PDFs returned an access error, so their wording comes from extracts of the same URLs; the topology map's legend could not be read, and per-link capacity is neither confirmed nor excluded.
  3. The figure of 42 is a count of country labels in extracted map text, not a count of connected countries.
  4. The NREN page returned no text at all to this reading, so no count is attributed to it.
  5. The five-year window behind the +30 per cent rate is undated, because the page that prints it prints no publication date.
  6. No document read prints a per-link utilisation, an averaging window, a peak, or a reference date for any capacity figure.
  7. The 3.6 exabytes is a self-reported annual total for calendar 2025; no independent metering was read.
  8. The €50.5M "total budget" on the GN4-3N impact page is a reported reading of a label, not a proven error; the €63.125M total with €50.5M EC contribution is printed verbatim on a second GÉANT page.
  9. The reconciliation of 43 from 37 + 5 + 1 is my arithmetic, not a published formula.
  10. No link, capacity, transit or grant was bought, ordered, measured or tested by me.