Summary

  • Brisanet carries its 5G spectrum at R$168,431 thousand, amortised at 5 per cent a year, against a total bid for the three lots of R$1,466,386 thousand.
  • The gap never became an asset: the company's own note says the balance was covered by service commitments to 2030, and the auction's coverage calendar puts the first step at 31 December 2026.

The note is unremarkable, which is the point. In Brisanet Serviços de Telecomunicações S.A.'s quarterly information for 31 March 2026, the line reads Licença de radiofrequência 5G, average annual rate 5 per cent, cost R$168,431 thousand, accumulated amortisation R$33,687 thousand at 31 December 2025 and R$35,792 thousand at 31 March 2026, with a quarterly charge of R$2,105 thousand. Total net intangível came to R$314,306 thousand at the 2025 year end and R$319,199 thousand a quarter later. https://vipfiles.valor.com.br/BDEmpresas/39d3f5d9-f4fa-4838-b726-34f7adf331f2.pdf

Now put the same transaction next to that line. The audited statements for 2023, in the company's own note on the auction, say the total offered for the three lots was R$1,466,386, that only R$168,360 of it would be disbursed, and that the remaining balance would be covered by commitments to offer the service in specified areas until 2030. https://vipfiles.valor.com.br/BDEmpresas/03be2049-4e60-46d2-b200-0b59f49ffa71.pdf Subtract the second number from the first and R$1,297,955 thousand of the disclosed bid value is not carried on the balance sheet as spectrum. That subtraction is mine. The statements do not perform it, and nothing in them calls the residue a liability.

The cash side has lot numbers, and they are easy to check. The licence publication, as reproduced from the Diário Oficial of 30 November 2021, lists C4 at 3,600 to 3,680 MHz for the Nordeste at R$13,442,866.72, C5 over the same band in the Centro-Oeste except PGO sectors 22 and 25 at R$43,602,999.48, and E4 at 2,300 to 2,350 MHz for the Nordeste at R$111,385,964.11 — a total of R$168,431,830.31 on 20-year terms. https://abratel.org.br/anatel-publica-licencas-do-espectro-arrematado-no-leilao-5g/ Anatel's own results deck places Brisanet in the regional 80 MHz 3.5 GHz rows for both the Nordeste and the Centro-Oeste, and in the 50 MHz 2.3 GHz Nordeste row. https://sistemas.anatel.gov.br/anexar-api/publico/anexos/download/8640e5ee7596164498004506dfeebdfd

The 4 November 2021 material fact gives the per-lot prices in the form the market first saw them, and the split deserves a slow read: the 3.5 GHz Nordeste block carried an offered value of R$1,250 million of which R$13.4 million was payable in Reais; the Centro-Oeste block R$105 million of which R$43 million in cash; the 2.3 GHz block R$111.4 million payable in Reais. The same document names the work attached to each: 5G coverage in 1,423 municipalities under 30,000 inhabitants by 2029 and 1,148 localities in 2030 on the first lot, 383 and 57 on the second, and on the 2.3 GHz lot 4G ERB coverage in 30 municipalities at 95 per cent plus roughly 2,767 uncovered localities, with the whole commitment estimated at approximately R$2 billion of investment through 2030. https://media.sumaq.report/brisanet-5118bfa2/docs/material-fact-brisanet-2021-11-04-57b17268.pdf Add Brisanet's own municipal counts across the two 3.5 GHz lots and you reach 1,806; across the two locality counts, 1,205. That is arithmetic over its figures, nothing more.

Who sets the dates matters, because the company does not. Anatel's page on the auction's coverage commitments fixes the national schedule for municipalities under 30,000 inhabitants at 30 per cent by 31 December 2026, 60 per cent by 31 December 2027, 90 per cent by 31 December 2028 and 100 per cent by 31 December 2029, with 1,700 non-seat localities to carry 5G by 31 December 2030. https://www.gov.br/anatel/pt-br/regulado/universalizacao/compromissos-do-leilao-do-5g Neither that 4,396-municipality figure nor those 1,700 localities are Brisanet's own obligation; its lots cite the smaller counts above, and reading the national numbers onto this company is the easiest error in the file. A client alert from Souto Correa Advogados reads the same obligations for the regional C1–C8 lots in the vocabulary of hardware rather than municipalities — at least one 5G ERB in 60 per cent of the Anexo XIV-B municipalities by 31 December 2027, 100 per cent by 31 December 2029, 100 per cent of Anexo XVIII-A localities by 31 December 2030, with backhaul at 1 Gbps under 20,000 inhabitants and 10 Gbps above. https://www.soutocorrea.com.br/wp-content/uploads/2021/10/Entenda-o-Leilao-do-5G-Blocos-e-lotes-licitados-sistematica-do-certame-e-compromissos-assumidos.pdf The two formulations are not the same claim, and the instrument that would settle it was only partly readable: the edital text retrieved in a hosted mirror establishes that Anexo XIV-B lists the municipalities behind lots C1 to C8 and D1 to D32, that Anexo XV carries the backhaul list, and that C5's minimum price was R$2,527,514.81 — but not the operative coverage clause itself. https://static.poder360.com.br/2021/09/EDITAL-5G-ANATEL.pdf

So there are two clocks, and they run in opposite directions. The asset shrinks on a straight line fixed at 5 per cent a year: five per cent of R$168,431 thousand is about R$8,422 thousand a year, and the reported quarterly charge of R$2,105 thousand annualises to about R$8,420 thousand — the same number at the precision printed. Accumulated amortisation of R$33,687 thousand is 20.0 per cent of cost, four years of a twenty-year schedule, although no document I read states when amortisation began, so read that as a consistency check rather than a start date. The obligation does not shrink on a straight line at all.

It steps: 30 per cent of a list by a date, then 60, then 90, then all of it — and the steps land while most of the licence's cost is still on the balance sheet.

Which is why the investment line deserves more attention than it usually gets. The 2025 audited statements report investments measured as additions to imobilizado and intangível of R$751 million against R$995 million in 2024, with R$588 million sitting in pre-operational assets at the year end and consolidated intangível at R$314,306 thousand against R$289,443 thousand. The cash-flow statement splits those additions as R$685,173 thousand to imobilizado and R$66,292 thousand to intangível, which sums to R$751,465 thousand and reconciles with the reported figure; the fall from R$995 million is R$244 million, or 24.5 per cent, and both those calculations are mine. https://vipfiles.valor.com.br/BDEmpresas/4577c7a9-3dd4-4c75-a2be-23176fbd38bb.pdf What the statements do not do is tie any year's additions to a coverage milestone. Nor may the 2021 estimate of approximately R$2 billion be set against one year of additions: that estimate spans 2021 to 2030, and comparing a nine-year figure with a twelve-month one is a category error wearing a chart.

A smaller arithmetic mismatch sits inside the documents themselves. The 2023 note says R$168,360 thousand would be disbursed; the licence publication as reproduced totals R$168,431,830.31; the intangible carries R$168,431 thousand. The three agree to about a tenth of a per cent and to nothing else. The material read on 18 November 2026 does not reconcile them, and I will not invent an indexation story to close a gap of roughly seventy-one thousand reais.

Three names do the work here and none should be collapsed into another. Brisanet Participações S.A. filed the 4 November 2021 material fact on the auction result; Brisanet Serviços de Telecomunicações S.A. is the issuer whose audited statements and quarterly information carry the licence intangible, the amortisation rate and the investment figures; and BRISANET SERVICOS DE TELECOMUNICACOES S.A is the directory entry this briefing is attached to, a LACNIC operator record. https://btw.media/en/directory/brisanet-servicos-de-telecomunicacoes-s-a-br The documents read do not state which legal person holds the authorisations, and no sentence here should be read as saying so.

Zoom out and the auction's own arithmetic repeats the pattern one level up. Anatel homologated the result by Acórdão nº 381/2021 on 23 November 2021, recording bids of R$47.2 billion with an average ágio of 211.7 per cent over the minimum, and an outorga payable to the Treasury of R$4.8 billion. https://www.gov.br/anatel/pt-br/assuntos/noticias/anatel-homologa-resultado-do-leilao-do-5g For Brisanet the same split appears at a smaller scale: a provider-supplied excerpt of the company's investor-relations page — the page itself was not opened on 18 November 2026 — puts the authorisations at 20 years renewable onerously for a further 20, and the outorga at R$168.4 million payable from December 2021 to December 2040. https://ri.brisanet.com.br/pt/a-companhia/estrategia-de-crescimento

What the material read on 18 November 2026 does not contain: the Termo de Autorização and the Diário Oficial original behind the licence table; the Portuguese original of the material fact; the current Formulário de Referência; the edital's operative per-lot coverage clause and the Anexo XIV-B municipality list; any sanction schedule, fine, forfeiture or remediation window attached to the coverage commitments; and any regulator assessment of progress against the December 2026 milestone. Those are absences from what I read. They are not findings about the company, and the difference is the whole discipline.

Both earlier BTW readings of this company were network artefacts — a prefix-and-interconnect count published on 10 November 2026, and an AS28126 registry reading published on 5 August 2026 — and neither opens a filing, a lot or an obligation date. This one does, and it ends on a question any reader can now ask without a spreadsheet: when a company reports an intangible amortising at 5 per cent a year and separately reports a coverage calendar whose first step falls on 31 December 2026, which of the two documents will tell you first if the build slips? Neither. The obligation is not in the ledger, and the asset is not on the calendar.

Somebody has to read both.