Summary

  • ARIN-prop-356 proposes that four noncontiguous /24 blocks satisfy a /22 waitlist request. The current rule requires a single continuous range, so ARIN may issue only one /24 and remove the request from the list.
  • The proposal register still lists prop-356 as a New Proposal. Its amended 4.1.8.2 text says “one or more contiguous blocks,” while its comments copy the 12-month transfer-hold explanation from prop-355.

The arithmetic in the proposal is blunt. Four /24 blocks hold the same 1,024 addresses as one /22. If ARIN has recovered four scattered blocks and a network is next in line for a /22, the problem statement says the registry can hand over only one /24 and considers the larger request finished. The rest of the approved need evaporates.

That is a concrete inventory problem. Section 4.1.8 permits an organization to qualify for an aggregate /22 and elect a smaller block down to /24. Section 4.1.8.2 says requests are not partially filled. When recovered space arrives in fragments, the words “do not partially fill” and “single continuous range” leave unused supply beside an unfilled request.

Wood’s proposal addresses that by changing Section 4.1.6. The added sentence says aggregation requirements do not preclude ARIN from issuing multiple noncontiguous blocks under 4.1.8.2. That directly permits the four-block example. It also says the combined space must equal the elected block size and leaves qualification, sequencing and request-size rules intact.

The next sentence creates the problem. The proposed 4.1.8.2 language says ARIN may fulfill a request with “one or more contiguous blocks.” Read literally, several individually contiguous blocks can still be noncontiguous with one another. Read conventionally, a multi-block allocation made only from contiguous ranges is one continuous range, which is the current restriction the proposal set out to remove. The text never supplies the bridge. It needs to say whether “contiguous” applies inside each /24, across the whole /22, or to neither requirement.

The comment block does not resolve it. Its two concluding sentences are identical to those on prop-355: the proposal is a PERWG response to the ARIN 58 Policy Experience Report, is not intended to change current practice, and aims to clarify the 12-month hold. Prop-355 is about transfer recipients and source eligibility. Prop-356 is about fragmented waitlist supply. The comment describes a different proposal’s issue while the actual policy sentence wobbles between the two address shapes.

No operator can reconstruct the intended allocator from this record alone. One reading frees recovered fragments; another preserves the single-range rule with more words. The proposal is still at New Proposal stage, so there is room to repair the text without pretending ARIN has changed policy.