• Orascom Construction operates in more than 25 countries, with a core focus on infrastructure, industrial, and commercial projects across the Middle East, Africa, and the United States.
  • The company owns 50% of BESIX Group and holds significant investments in building materials, facility management, and equipment services.

Osama Bishai runs a company that has been pouring concrete under Cairo's skyline since 1950. His most consequential project right now is making sure a little less of that concrete gets poured in Egypt.

That is not retreat. It is arithmetic — and it is the story of how a family-founded Egyptian contractor turned itself into one of the few Middle Eastern builders that can bid in Abu Dhabi, Riyadh, and the American South without changing its letterhead.

Orascom Construction: 75 years from Cairo to 25 countries

Founded in 1950, Orascom Construction has grown into a global heavyweight of the engineering and construction sector, dual-listed on the UAE and Egyptian stock exchanges and consistently ranked among the world's top contractors. Its portfolio reads like a tour of modern Egypt: the Grand Egyptian Museum, the Greater Cairo Metro, and the monorail threading through the New Administrative Capital.

That is the résumé. The interesting part is what happens next, because the company's own leadership has stopped pretending the home market is a growth engine.

Osama Bishai and the Egypt problem

Currency fluctuations and inflation have made Egypt a hard place to hold a margin. Bishai's answer has been a deliberate strategic tilt toward international markets — the UAE and Saudi Arabia first among them — so that Egyptian exposure becomes one leg of a stool rather than the whole piece of furniture.

It is the unglamorous discipline that separates contractors who survive cycles from contractors who become case studies. Diversification is not a slogan on a slide; it is the difference between a backlog that pays and a backlog that merely exists.

The New American University contract and Egypt's education build-out

Orascom has not walked away from Egypt — it has become pickier about what it builds there. In 2024 the company secured a significant contract to deliver the New American University in Cairo campus expansion, comprising five state-of-the-art buildings plus the infrastructure works beneath and between them.

Educational infrastructure is a smart place to be selective. The projects are visible, the clients are institutional, and the work compounds: a campus built well becomes a reference for the next campus, and the next one after that.

Also Read: Transforming big tech: UK's CMA empowers rivals with data access
Also Read: Big Tech faces tougher UK scrutiny with new competition rules

Red Sea wind: 650 MW, six months early

Then there is the project that best explains why Orascom keeps winning work outside its comfort zone. In 2025 the company began commercial operations on the 650 MW Red Sea Wind Farm — six months ahead of schedule.

Six months early is not a rounding error in this industry. It is the clearest possible signal that a contractor can execute at scale, on time, in a hostile desert, on a renewable asset that advances Egypt's energy goals. Deadlines are the only press release construction companies ever really issue.

The 2026 target: shrink Egypt to a third

Looking ahead, Orascom Construction aims to reduce its Egyptian operations to roughly a third of the business by 2026, redirecting weight toward international markets. The logic is straightforward: diversify revenue streams, spread currency risk, and strengthen the company's position in a global construction industry where the biggest contracts increasingly sit outside the Middle East.

Add the 50% stake in BESIX Group and the side bets in building materials, facility management, and equipment services, and you get a company that has quietly assembled the parts of a construction group that does not depend on any single government's balance sheet.

Seventy-five years in, Orascom has already proved it can build in Egypt. The next chapter is about proving it can build without needing to — and that is a harder, better story than any skyline.