Skip to main content

North America Trends

North America Trends

North America market trend intelligence tracks cloud service, regional ISP, national telecom, data centre, and institutional infrastructure signals across North American internet infrastructure markets. BTW.

North America Trends signal visual
North America TrendsNorth America Trends

Latest Coverage

Latest from North America Trends

1,343 articles

Unpowered data-centre project models queue behind an interconnection gate beside a live residential grid model

North America Cloud Services Trends

PG&E’s 12 GW data-centre pipeline is a queue, not yet a load forecast

PG&E says prospective data-centre projects in its service area now exceed 12 GW. Its estimate that each additional 1 GW could cut monthly customer bills by 1% or more depends on “appropriate pricing”—the condition that decides whether new load shares grid costs or transfers them.

Jul 28, 2026
Researchers compare one physical network-routing workload across an annealing apparatus and a conventional validation rack

North America National Telecom Trends

AT&T’s sub-15-second result proves one optimisation path, not quantum advantage

AT&T has signed an agreement to expand its work with D-Wave after one network-optimisation workload fell from about one hour to under 15 seconds. The initial focus is annealing inside tools that support agentic AI; outage, routing, build and traffic uses remain candidates to…

Jul 28, 2026
One neutral account hub connects several consumer devices while technicians integrate a small section of mobile network equipment behind glass

North America National Telecom Trends

T-Mobile’s accounts slowed while revenue per account kept rising

T-Mobile US added 277,000 postpaid accounts in the second quarter, 13% fewer than a year earlier, but monthly postpaid revenue per account rose 2% to $152.91. The company’s raised cash guidance therefore rests more on monetising a larger relationship than on accelerating the…

Jul 28, 2026
A technician upgrades a suburban cable cabinet beside a home containing an unused gateway, several mobile devices and a streaming television

North America National Telecom Trends

Comcast’s broadband cash engine is shrinking as its alternatives demand more capital

Comcast lost 167,000 domestic residential broadband customers in the second quarter while wireless added 448,000 lines and Peacock reached a quarterly Adjusted EBITDA profit. The portfolio is diversifying, but the replacement businesses do not yet erase the pressure on broadband…

Jul 28, 2026
A newly landed submarine cable enters a beach vault and joins several inland backhaul ducts on Puerto Rico's southern coast

North America National Telecom Trends

Claro’s $35 million Ponce landing adds a route without proving independence

Claro Puerto Rico has funded a $35 million extension of the AMX-1 submarine system to Ponce, creating the island’s first reported cable landing on the southern coast. The new geographic entry point can diversify access and support wholesale capacity, but it does not by itself…

Jul 28, 2026
A developer watches a managed build queue where most jobs run and a small group waits in amber

North America Cloud Services Trends

GitHub's 3% hosted-runner delay reveals the cost of a shared execution queue

For 85 minutes on 22 July, about 3% of GitHub-hosted Actions runs took more than five minutes to start, and a small portion could fail after an extended delay. The incident was narrow, measured and resolved. It nevertheless shows why teams that buy managed execution capacity must…

Jul 23, 2026
Two operational data-hall buildings connect to electrical and water utility work in a central Texas landscape

North America Datacenter Trends

Meta's Temple opening turns a construction promise into operating load

Meta has opened its Temple, Texas data centre after four years of construction, moving the project from a planning claim to a live operating facility. That transition makes jobs and infrastructure measurable, but the eventual $1.2 billion-plus value, renewable-energy matching and…

Jul 23, 2026
A mature central computing cabinet is serviced while newer distributed server rows are commissioned

North America Cloud Services Trends

IBM's software mix is carrying a slower operating machine

IBM raised the floor of its full-year constant-currency growth outlook after a quarter in which software expanded but consulting stalled, infrastructure contracted and free cash flow declined. The stronger guidance is credible as a portfolio-mix signal; it is not yet proof that…

Jul 23, 2026
Operating server rows stand beside technicians installing the next data-centre expansion

North America Cloud Services Trends

Alphabet’s $112bn quarter is mostly an investment gain, not operating cash

Alphabet reported extraordinary second-quarter profit, but the number that matters for its infrastructure build is less flattering: $44.924bn of capital expenditure exceeded $39.069bn of operating cash flow. Google Cloud is growing fast enough to support the investment case…

Jul 23, 2026
An engineer inspects the logic chips and modules inside an opened wireless communications device

North America National Telecom Trends

The FCC has moved Covered List risk inside the device

The Federal Communications Commission has closed a route by which a product could obtain a new US authorization even when its essential logic came from a company already judged a security risk. The rule changes the compliance question from who assembled the finished device to who…

Jul 23, 2026
An intact disclosure card stands between a fading data grid and archive boxes

North America National Telecom Trends

Broadband labels survive, but their bulk-data shadow does not

The FCC has kept consumer broadband labels while removing the separate machine-readable spreadsheet and the two-year archive for discontinued plans. Providers lose two compliance systems; comparison tools and researchers lose structured and historical evidence. The 3–0 decision…

Jul 22, 2026
Two orderly document review lanes stop at a gate overlooking a launch complex

North America National Telecom Trends

The FCC has redesigned the satellite-licensing queue, not removed it

Part 100 turns satellite licensing into a more explicit sorting system. Applications that fit standard, presumed-acceptable conditions should move through a predictable lane; exceptions receive targeted review. The gain is administrative sequence, not permission to ignore…

Jul 22, 2026
Satellite dish and mobile tower beside an airport approach at dusk

North America National Telecom Trends

FCC’s Upper C-band winners will inherit the bill for clearing it

The FCC has adopted rules for a future auction of 160MHz between 3.98GHz and 4.14GHz. The spectrum is valuable because it can extend the existing C-band mobile ecosystem, but it is not empty: satellite users must move and aircraft altimeters must be upgraded. Future licensees…

Jul 22, 2026
Five service waveforms show two separate error clusters divided by a narrow calm interval

North America Cloud Services Trends

Anthropic closed one incident 28 seconds before opening another

Anthropic resolved elevated errors on Opus 4.8 and Haiku 4.5 at 15:23:37 UTC, then opened a Sonnet 5 error record at 15:24:05. Both minor incidents named the same five service surfaces. The 28-second gap creates operational continuity for customers, but it does not prove one…

Jul 22, 2026
Surveyors review plans in an undeveloped Georgia field with transmission lines far in the background

North America Datacenter Trends

OpenAI has a 3.2GW power contract before Project Camellia has a final design

OpenAI says it is contracting with Georgia Power for 3.2 gigawatts to be delivered in phases from 2028 to 2032 for Project Camellia in Effingham County. The scale is material, but it describes a future power-supply plan, not commissioned computing load today. Financing, design…

Jul 22, 2026
Completed liquid-cooled compute rows end at an unfinished data-centre construction zone

North America Cloud Services Trends

AMD bought an option on Anthropic’s deployment, not two gigawatts of certainty

AMD and Anthropic have agreed on an accelerator programme of up to 2GW, beginning with as much as 1GW of MI450 capacity in the first half of 2027. AMD may also invest up to $5 billion as deployment milestones are met. The scale is large, but every headline number is conditional…

Jul 22, 2026
Technician working on fibre beside a suburban home with fixed-wireless equipment and a distant mobile tower

North America National Telecom Trends

AT&T’s million-add quarter was really three different network bets

AT&T added more than one million advanced-connectivity customers across fibre, fixed wireless and postpaid phones in the second quarter. The total is impressive, but the useful signal is the mix: the operator is using several access technologies to widen its addressable market…

Jul 22, 2026
File tiles paused at an upload gateway beside a partially materialized blank image canvas under amber processing light

North America Cloud Services Trends

OpenAI's new file-and-image incident was still live at the reporting cutoff

At 09:40:04 UTC, OpenAI had identified elevated errors affecting file uploads and image generation and was implementing a mitigation. A monitoring update arrived four minutes and thirty-seven seconds later, but it belongs to the next reporting state. The cutoff preserves what…

Jul 22, 2026
Planner gestures over an unlabeled data-centre scale model separated from homes by a broad green buffer

North America Datacenter Trends

Nashville turns data-centre resource costs into permit conditions

Nashville's Metro Council has approved a data-centre zoning package and a temporary permitting moratorium. The new framework bars facilities above 500,000 square feet, sends smaller proposals through special-exception review and places siting, generation and water-cooling…

Jul 22, 2026
Editorial illustration of one active AI-system assembly cell beside a prepared but idle parallel cell

North America Datacenter Trends

Wistron opened the Texas factory; now the production ramp has to earn the $700 million commitment

Wistron's first United States plant is no longer a site plan. Its Fort Worth D1 factory is open, one manufacturing cell is producing NVIDIA GB300 systems, and a second is intended for Vera Rubin. The operating milestone is real. The harder economic question is whether local…

Jul 21, 2026