Skip to main content

Global Datacenter

Global Datacenter

Datacenter company intelligence covers data centre operators, colocation platforms, hyperscale campus developers, interconnection providers, and digital infrastructure investors worldwide, with enough context for readers to understand how these organisations build, operate, finance, regulate, and sell the infrastructure that supports digital markets.

Global Datacenter signal visual
Global DatacenterGlobal Datacenter

Latest Coverage

Latest from Global Datacenter

53 articles

Editorial illustration of a single luminous beam passing through a translucent prism and splitting into several thin diverging light paths of different cool hues

Global Datacenter

Who actually runs inside Datamatix's 212.236.10.0/24: the service layer the registry cannot answer

Who actually runs inside Datamatix's 212.236.10.0/24: the service layer the registry cannot answer intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure…

Oct 1, 2026
DDR5 UDIMM memory modules arranged in a dense grid on a dark navy background, one module highlighted in warm amber light, with no text or logos

Global Datacenter

Kingston's 62%: How a Private Memory Assembler Turned a Price Cycle Into Durable Dominance

Kingston Technology has held the number-one position in third-party DRAM modules for more than two decades. Its latest lead — an estimated 62% share of a $21.2 billion market that grew 59% in a single year — is less a story about memory prices than about what a private assembler…

Oct 1, 2026
Abstract routing topology illustration representing AS210973 (DATAMATIX) with BGP session lines toward peering points and RPKI certificate-and-shield motifs

Global Datacenter

Registered, authorised, and still unproven: what DATAMATIX's live posture says about operating a network

Registered, authorised, and still unproven: what DATAMATIX's live posture says about operating a network intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the…

Sep 30, 2026
Abstract network topology map of European routing infrastructure with one hollow, dimmed AS node among glowing peer connections, representing the registered but unrouted AS210860

Global Datacenter

AS210860 after the silence: what changed since September — and the answer is nothing

AS210860 after the silence: what changed since September — and the answer is nothing intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences…

Sep 29, 2026
Two separate stylized German corporate buildings divided by a wide vertical gap: a modest low-rise regional Siegen data-center winding down on the left and a detached retail-cooperative holding-structure campus on the right, illustrating that DINFRA GmbH and the DFINFRA registry identity are distinct

Global Datacenter

DINFRA and DFINFRA: correcting a name collision between a Siegen datacenter venture and EDEKA's registry role

DINFRA and DFINFRA: correcting a name collision between a Siegen datacenter venture and EDEKA's registry role intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the…

Sep 29, 2026
Interior of a modern colocation data hall: a row of sealed black server cabinets recedes down an aisle beside a glazed partition onto an electrical switchgear room, with overhead cable trays and a transformer section topped with insulator bushings visible through the glass.

Global Datacenter

Iron Mountain Data Centers: how 452 megawatts become $204 million a quarter — and where the chain stalls

A listed REIT's data-centre arm reports $204 million of quarterly revenue from a portfolio that is 97% leased, with 203 MW under construction and 685 MW still held for development. The interesting question is not the growth rate. It is what has to happen, in sequence, before an…

Sep 25, 2026
Equinix Fabric and the Limits of Programmable Interconnection

Global Datacenter

Equinix Fabric and the Limits of Programmable Interconnection

For more than a decade, Equinix has turned private connections between data centres, clouds, and network services into software-addressable products. The 2026 push into agent-assisted operations and geographic path control extends the platform's usefulness but also makes the…

Aug 15, 2026
Equinix Fabric and the Limits of Programmable Interconnection

Global Datacenter

Equinix Fabric and the Limits of Programmable Interconnection

Equinix has spent more than a decade turning private connections between data centres, clouds, and network services into software-manageable products. Its 2026 expansion into agent-assisted operations and geographically constrained routing pushes the platform into broader…

Aug 15, 2026
A registry records desk separated from independently operated network rooms.

Global Datacenter

AS31605 separates records, routes and facilities

AS31605 separates records, routes and facilities intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that may follow. The Global Datacenter…

Aug 12, 2026
An anonymous technician walks through an unbranded data-center aisle beneath sealed fibre conduits in an illustrative scene.

Global Datacenter

Titanium OU and AS31605: Registry, Routing, and Data-Center Evidence

Titanium OU and AS31605: Registry, Routing, and Data-Center Evidence intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that may follow.…

Aug 10, 2026
Abstract editorial still life with a blank ledger card, a separate punched index card and a detached collector aperture.

Global Datacenter

KIDC LIMITED’s AS137427 Separates Registry Identity from Routing Observation

KIDC LIMITED’s AS137427 Separates Registry Identity from Routing Observation intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that may…

Aug 7, 2026
Abstract editorial still life separating a blank registry archive, a sparse declaration rack and a sealed historic observation specimen.

Global Datacenter

Proximity Data Centres’ AS200427 Separates Registry Identity from Routing Evidence

Proximity Data Centres’ AS200427 Separates Registry Identity from Routing Evidence intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that…

Aug 7, 2026
Equinix data centre connected to cloud, network and security services through Equinix Fabric

Global Datacenter

Equinix Fabric and the limits of programmable interconnection

Equinix has spent more than a decade turning private connections among data centres, clouds and network services into software-addressable products. Its 2026 push into agent-assisted operations and geographic path controls makes the platform more useful, while making the ports…

Aug 5, 2026
A late-2010s carrier interconnection room with routing racks, patch panels and dense fibre distribution.

Global Datacenter

Safe Host's 2019 Route Leak Made Peer Filtering a Cross-Border Accountability Test

The Safe Host routing incident of 6 June 2019 showed how an export mistake can become an international infrastructure event when another network accepts and propagates routes outside their intended relationship scope. The durable accountability question is not whether one…

Jul 29, 2026
Unbranded infrastructure scene illustrating the article's evidence boundary

Global Datacenter

Datacenter on demand's AS35930 footprint shows a handoff, not a proved cloud estate

Datacenter on demand's AS35930 footprint shows a handoff, not a proved cloud estate intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the infrastructure consequences that…

Jul 21, 2026
Technicians conduct a generator and transfer-switch load test outside a Honduran data-centre building during tropical rain, with cooling equipment and two separated fibre approaches visible.

Global Datacenter

Cable Color's dual AC bus leaves the decisive resilience question outside the cabinet

Cable Color markets a Tier II colocation room with 48 hours of energy, an N+1 backup generator and two AC buses at every cabinet. The public record does not show whether those paths remain independent through utility loss, cooling, fuel, building entrances, external carriers, the…

Jul 16, 2026
AI-generated editorial reconstruction: a facilities technician inspects a cooling-water pump and adjacent electrical distribution cabinet in a maintained data-centre plant room.

Global Datacenter

Acer eDC markets 61,500 square metres at Longtan, but discloses no powered-capacity figure

Acer e-Enabling Data Center's own pages describe a six-storey Longtan facility with two claimed Taipower supply loops, a claimed 23,200-square-metre single hosting room and an active regional network. The missing number is the one a capacity buyer needs most: how much IT load is…

Jul 15, 2026
Photorealistic editorial risk and accountability image for Equinix made ransomware disclosure a colocation-continuity accountability test

Global Datacenter

Equinix made ransomware disclosure a colocation-continuity accountability test

Equinix is a risk and accountability case because its 2020 ransomware disclosure tested whether a global colocation operator could prove that compromised corporate systems were separated from the customer-facing continuity surfaces that keep data-centre, interconnection, managed…

Jul 15, 2026
Editorial infrastructure image for PT Mataram Data Center

Global Datacenter

PT Mataram Data Center has to prove whether marketed data-centre capacity can survive power and carrier constraints

PT Mataram Data Center has to prove whether marketed data-centre capacity can survive power and carrier constraints intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market exposure, and the…

Jul 15, 2026
Technician inspects power and fibre beside mixed server racks in a compact regional hosting room with visible spare capacity.

Global Datacenter

LuraHosting LuraHosting Datacenter LTDA has to prove whether marketed data-centre capacity can survive power and carrier constraints

LuraHosting LuraHosting Datacenter LTDA has to prove whether marketed data-centre capacity can survive power and carrier constraints intelligence summary explains the development, the public evidence available to readers, the organisations involved, the regional context, market…

Jul 13, 2026