Summary
- RIPE Policy Proposal 2025-02, co-authored by Job Snijders and Nick Hilliard, revokes a delegated CA's resource certificate when the RIPE NCC cannot read its current Manifest and CRL "for more than three months" — a clock that starts from the registry's own observation, not from a date.
- The same author's APNIC proposal uses 60 days, his ARIN proposal ends 24 months after Board adoption, and an earlier RIPE draft discussed 100 days. On the record read here, the RIPE review and implementation clocks were met at every printed step.
Start with the sentence that does the work. RIPE Policy Proposal 2025-02, "Revocation of Persistently Non-functional Delegated RPKI CAs", carries two authors — Job Snijders and Nick Hilliard of INEX — and prints its obligation in one line: the RIPE NCC shall revoke a delegated CA's resource certificate when it has been unable to discover and validate that CA's current Manifest and Certification Revocation List "for more than three months" (proposal 2025-02).
Read it twice and notice what is absent: a date. The clock begins when the registry cannot see something, and the same registry is the party instructed to revoke. Nothing in that sentence lets a reader outside the RIPE NCC establish the day the three months started. The published RIPE Document that followed, ripe-847 of 15 October 2025, carries the identical text (ripe-847).
Months are not a unit an operations team can hold, and the RIPE NCC said so before anyone else did. Its impact analysis states that "because months do not have a constant length, the RIPE NCC will use 90 days as a threshold rather than three months" (proposal 2025-02). That is a second number, published alongside the first, and the two are not the same promise. Three months is what the policy says; 90 days is what the registry will do.
There is a third number in the drafting record. A February 2025 discussion draft of the same idea, circulated on the working-group list, had used 100 days. Same problem, same author, three durations before the proposal even reached Review Phase.
The procedural clock is the easier one to audit, and the record leaves it open. On 7 August 2025 the RIPE NCC announced the Review Phase, describing its purpose as continuing "the discussion of the proposal taking the impact analysis into consideration", asking for comments before 5 September 2025 and leaving rough consensus to the Routing Working Group chairs at the end (review phase). On 10 September the chairs closed it: the phase "ended on 5 September", ten participants fully supported the proposal, no objections were raised, and the Policy Officer was asked to announce Last Call (end of review).
Four weeks announced, four weeks used, one working day before the result was posted. That is a clock met — worth stating plainly, because the failure worth hunting in policy documents is usually the opposite.
Implementation took longer, and it is documented in two places that do not tell you the same amount. The RIPE NCC's policy implementation status page records that updated Certification Service Terms and Conditions were published on 6 May 2026 and take effect on 8 June 2026, after which the NCC monitors delegated CAs and revokes after 90 days of non-functionality; as retrieved, that page carries no page-level publication or last-updated date (implementation status). The dated statement lives elsewhere: a policy-announce message of 8 June 2026 opens, "We are pleased to announce that we have implemented the RIPE Policy Proposal 2025-02" (implementation announcement). If you want one fixed timestamp for completion, the mailing list has it and the status page does not.
Then the operational clock started, and the first batch is on the record. A routing-wg post of 24 September 2026 reports that tracking of non-functional delegated CAs began on 9 June 2026, that the first batch was warned on 14 September 2026, and that 35 still-non-functional CAs were revoked on 23 September 2026; from then on, notifications go out at 7, 30 and 60 days and revocation follows the 90-day period (revocation started). Snijders replied in that thread noting a decrease. Nothing in the reviewed set shows the RIPE clock missed.
Now set the same author's other RPKI text beside it. APNIC prop-166, "Revocation of Persistently Non-functional RPKI Certification Authorities", lists Snijders as its author and binds APNIC through the APNIC Parent CA, with a threshold of more than 60 days; because months have no fixed length, APNIC says it will use 60 days rather than two months (prop-166). Its printed history runs from version 1 on 31 July 2025, through an impact analysis on 15 August 2025 and consensus at APNIC 60 on 11 September 2025, to an EC endorsement on 4 December 2025 and technical implementation complete on 11 February 2026, with CPS and RPKI terms updates still pending. The status line reads "Reached consensus at APNIC 60". Same architecture as RIPE, narrower duration: the condition is observed by the registry, the registry acts, and the period is a translation of months into days.
The ARIN instrument is the outlier, and it is the one that changed shape. ARIN-prop-304, submitted by Snijders on 7 July 2021, proposed removing NRPM Section 3.5 and the "OriginAS" field, and its implementation timetable reads "TBD by ARIN" — timing handed to the registry outright (ARIN-prop-304). The later Recommended Draft Policy ARIN-2021-8 replaces that with a fixed interval, "Removal of the OriginAS field from the database: 24 months after ARIN Board adoption", with the Board adopting the draft on 18 July 2023, and an earlier revision having used a fixed date of 31 December 2024 (ARIN-2021-8). Board adoption is an event with a date and a minute behind it. Anyone can count 24 months from there.
Line the four clocks up. RIPE: three months from the registry's inability to see a Manifest and CRL, operationalised as 90 days. APNIC: two months, operationalised as 60. ARIN: 24 months from a board decision. Behind the RIPE text, an early draft at 100 days. The durations differ because the registries differ, which is ordinary. The anchoring does not differ by accident: in both RPKI instruments the trigger and the remedy sit inside the same institution, while in the ARIN instrument the anchor is an external decision the drafter named in advance.
That is where the person becomes load-bearing, and the swap test says so precisely. Put another proposer's name on the RIPE template and the page reads exactly the same — on its own, it is a policy-process document and nothing more. Put another name across all four instruments and the comparison vanishes, because the comparison is the finding: one drafter, four clocks, one of them dated. A byline is not a pattern. Four texts by the same hand choosing where to put the anchor is.
Two limits belong beside the claim. The evidence is provider-reported page text retrieved for the ten documents named here on 24 November 2026; no page images, PDF renderings or signature blocks were inspected. And the identity link across the three instruments rests on each one's own printed author or originator line, not on a biographical record. Nothing in the reviewed set alleges that any proposal was mishandled or any deadline breached; the RIPE clock, on the record read here, was met at every step.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.






