  • The NRO Number Council, which is also the ASO Address Council, handed the ASO AC Recommended RIR Governance Document to the NRO Executive Council on 28 July 2026 and published it on 1 September. Approval and adoption fall in Q4 2026 and belong to the NRO EC and ICANN.
  • Version 3 sets a five-year audit cycle, requires four of five registries to recognise a new one, allows derecognition on three of the four registries that are not the subject, and lets an affected registry initiate its own Temporary Emergency Continuity Arrangement for 90 days.
  • Chair Hervé Clément, a RIPE NCC board appointee, was reappointed on 17–18 October 2026 for a seat running to 2029. Six other members' terms end on 31 December 2026, so 40 percent of the council changes in January.

The delivery

The document arrived on 28 July 2026, and the NRO published it on 1 September. Its title is long, its filename is longer, and the sentence that matters sits in a bullet list: the number council "handed over the third version of the draft RIR Governance Document to the NRO Executive Council in July 2026."

That is a handover between two bodies most network operators have never heard of. The NRO EC is the five registry chief executives, meeting by consensus. The NRO NC is fifteen volunteers, three per registry, and it doubles as the ASO Address Council inside ICANN. For almost three years the volunteers did the drafting; in July they stopped being the owner.

The NRO's own timeline page, last modified on 4 September 2026, lists step ten as "Approval and Adoption - Q4 2026" with the status "Upcoming", and says the NRO EC and ICANN "will determine the procedures for approval and adoption." It is the fourth quarter of 2026 now. As of 27 November the page still said upcoming, and no adoption notice had appeared on the NRO's site.

Fifteen volunteers and their electorates

The council is built out of five registries. Each RIR appoints three members: two chosen by its community and one appointed by its Executive Board. The published roster gives the arithmetic away at a glance. Saul Stein, Maemura Akinori, Kevin Blumberg, Esteban Lescano and Hervé Clément carry the asterisk that means board-appointed. The other ten came through community processes.

The chair is one of the five board appointees. Hervé Clément, of the RIPE NCC, chairs the council; Amy Potter of ARIN and Esteban Lescano of LACNIC are vice chairs. The council therefore wrote the rules for recognising, auditing and, if it comes to it, removing registries, and one third of its own seats was filled by the boards of those registries.

The community side was not decorative. The council published principles first, then ran a questionnaire from 8 October to 6 December 2024, and 298 individuals from the RIR communities submitted answers. The first draft went out for comment from 14 April to 27 May 2025. The second went out from 28 August to 7 November 2025 and was presented at APNIC 60 in Da Nang, the Africa Internet Summit in Accra, LACNIC 44 in San Salvador, RIPE 91 in Bucharest, ICANN 84 in Dublin and ARIN 56 in Arlington.

In 2026 the drafting moved to an in-person workshop in Montevideo, meetings at ICANN 85 in Mumbai in March, and a final workshop in Seville during ICANN 86 in June, with status reports in February and May.

Almost three years, two consultation rounds, six regional meetings in one autumn, two status reports, and 298 questionnaire responses. Then the document went to the five people who run the registries.

What version 3 actually does

The NRO's summary of differences lists seven clusters. Four of them change who can do what.

Recognition gets a restructured process: more detailed proposal and review requirements, conflict-of-interest disclosure, clearer ICANN responsibilities, published assessments and rationales, and a two-thirds RIR support threshold. Five registries exist, and two thirds of five is 3.33, so recognition needs four of five.

Derecognition gets the same shape, with one exception that matters: the two-thirds threshold excludes the subject registry. That leaves four voters, two thirds of four is 2.67, and three registries can remove a fourth. Rehabilitation is written in as the preferred path before removal, and decisions and supporting documents must be published.

Audit becomes a routine. Version 3 sets a five-year regular audit cycle, separates a Compliance Review process with "safeguards against misuse", and routes the outcome through a Rehabilitation Plan where needed. A registry that fails an audit now has a named procedure and a named document instead of a silence.

Emergency continuity gets the clause that will be quoted in every future dispute. The terminology is cleaned up, and the affected registry may initiate a Temporary Emergency Continuity Arrangement for its own services. Alternatively the initiation threshold is ICANN plus two thirds of the registries, which is ICANN plus four of five. The arrangement keeps a 90-day limit and adds transparency safeguards, including, elsewhere in the summary, a rule that the document cannot be amended while an arrangement runs or while a derecognition proposal is pending.

The 90-day door

Read those two provisions together and you get a mechanism nobody has tested. A registry that believes its services are at risk can open its own continuity arrangement, and for as long as it runs, the rulebook is frozen. The same freeze applies while a derecognition proposal is pending. The shelter has a clock on it, 90 days, and the clock is the only hard limit written into the emergency machinery.

The clause is defensible. If a registry's staff, records and reverse DNS are about to fail, the last thing anyone needs is a simultaneous argument about amending the criteria. The clause also hands the party in difficulty a procedural advantage: a 90-day window in which the text cannot move, followed by a decision process that needs three of the other four registries to remove it.

AFRINIC is the case everyone will read into the text. The council did not name it, and the summary does not mention any registry by name. The definitions do the work: Temporary Emergency Operator, Transition Plan, Rehabilitation Plan, Compliance Review. A registry that needed a receiver in 2024 now has a vocabulary for what happens next, written by fifteen people who watched it happen.

January arithmetic

Seven published terms end on 31 December 2026: Stein, Nicole Chan, Maemura, Blumberg, Lescano, Villa and Clément. On 17–18 October 2026, meeting by email, the RIPE NCC Executive Board unanimously reappointed Clément to its board-appointed NRO NC seat for a term running from 1 January 2027 to 31 December 2029, after a nomination call that produced exactly one confirmed nominee — the incumbent.

ICANN 87 in Bali on 17-22 October and RIPE 93 in Sofia on 26-30 October came and went; neither produced an adoption notice. The council's membership page, last modified on 12 August 2026, still shows Clément's term ending on 31 December 2026; the page has not caught up with the October appointment.

Six seats still turn over on 1 January: one AFRINIC community seat, two APNIC seats, one ARIN board-appointed seat, two LACNIC seats. That is 40 percent of the council, including one of the two vice chairs, Esteban Lescano. The six who arrive inherit a document they did not draft, in the quarter it is supposed to be adopted, with a 2027 audit cycle waiting to be scheduled.

What to watch

Watch the instrument. "The NRO EC and ICANN will determine the procedures for approval and adoption" is a sentence that can produce a resolution, a board paper, a joint statement or a signature page nobody publishes. The next version of the timeline page will show which one was chosen, and whether the procedure was announced before the decision or after it.

Watch the first use of the 90-day arrangement. A self-initiated continuity arrangement is the cheapest test of whether the document means anything, because it needs only the registry's own decision plus whatever the transparency safeguards require. If none appears in 2027, the emergency machinery is decoration; if one does, the freeze on amendments becomes the most valuable clause in the text.

Watch the audit calendar. A five-year cycle implies a first audit date, and a first audit date implies an auditor, a scope and a report. None of those are public yet.

Watch the six new members. Their first substantive act will be to decide whether the recommended draft is final. A council that reopens the text in 2027 undoes three years of consultation; a council that defends it becomes the body that certifies the registries which appointed a third of its predecessors.

Sources