Summary
- France publishes its copper retirement twice: a national ledger of telephone lines still on copper, and a timetable of communes with closure dates. The two never share a page.
- The count for a named commune is not withheld. A local authority may request it from Orange from twelve months before the technical closure, under a signed confidentiality agreement — which makes it administratively available and publicly absent.
On 8 October 2026 ARCEP published its quarterly market observatory for the second quarter of 2026. One table, headed "Lignes supportant le service téléphonique (réseaux fixes) (millions)", carries five quarterly columns and, beneath them, this row: "Lignes sur réseau cuivre 8,982 8,279 7,487 6,753 6,162 -31,4%". (Observatoire des marchés, 2e trimestre 2026)
Those are millions of lines, at the end of each quarter, for the whole country. In twelve months 2,820 million copper telephone lines left the count, which is my subtraction from two printed endpoints. Over the two quarters from 31 December 2025 to 30 June 2026 the fall was 1,325 million, an average of about 662 500 lines a quarter, which is my division. And the series revises: the edition published on 15 January 2026 put copper at 8,339 million lines at 30 September 2025, while the October 2026 edition gives 8,279 million for the same reference date — 60 000 lines of difference between two editions, and the subtraction is mine. (Observatoire des marchés, 3e trimestre 2025)
Two other objects sit in that table and must not be exchanged for the first. Copper DSL broadband subscriptions came to 3,1 million at the end of June 2026, nine per cent of all internet subscriptions and six points lower in a year. Total fixed telephone lines of all technologies were 35,509 million, down 1,3 per cent. (Les chiffres au 2e trimestre 2026)
Then the timetable, which is a different instrument.
ARCEP's page on the organisation of Orange's copper closure, dated 26 January 2026, opens with the sentence that governs everything after it: "La commune comme maille opérationnelle principale de la fermeture du réseau cuivre". Lots are annual, each perimeter announced by default at least three years ahead, and the commercial closure dates were fixed at 31 January 2026 and 31 January 2027, with successive annual technical closures by lot running to 2030. (L'organisation d'Orange pour la fermeture de son réseau cuivre)
The lots, counted the way that page counts them. Lot 1: 162 communes, 209 000 premises. Lot 2: 829 communes, nearly one million premises. Lot 3: 2 138 communes, about 2,5 million premises. Lot 4: 6 894 communes, about 8,3 million premises, commercial closure carried out in January 2026 on part of them and planned for January 2027 for the rest, technical closure in three sub-lots in January, May and October 2028. Lot 5: 10 470 communes, about 11,7 million premises, technical closure in January, May and October 2029. Lots 6 and 7, in the page's own words, "sont encore à déterminer".
Every quantity attached to a lot is a count of communes and a count of premises. The page prints no count of copper lines for any lot, and none for any commune.
Read as an instrument, the page also disagrees with itself. Lot 3 covers 2 138 communes; the same sentence states that commercial closure was carried out in 2 097 communes and postponed for 44. 2 138 minus 44 is 2 094, not 2 097, and the three-commune gap is unexplained on the page. ARCEP's guide for local authorities gives 2 097 for lot 3, 6 843 for lot 4 and 10 488 for lot 5, where the organisation page prints 2 138, 6 894 and 10 470. (La fermeture du réseau cuivre : quels enjeux pour la connectivité de mon territoire ?) Orange Business's own calendar prints a fourth figure: 2 145 communes for lot 3, 2,5 M premises, technical closure 31 January 2027, with a warning that the initial calendar may change. (Calendrier fermeture cuivre) Four lot-3 counts circulate — 2 138, 2 097, 2 145 and the page's internal 2 094 — and no reviewed page prints a revision history. I print all four and adopt none as the lot's size.
Sum the five lot counts printed as commune counts — 162, 829, 2 138, 6 894, 10 470 — and you get 20 493. The guide says commercial closure of the majority of French communes, around 25 000, took effect at the end of January 2026, with the remainder planned for the end of January 2027, and that around a thousand communes had been technically closed under lots 1 and 2. The difference of roughly 4 500 is consistent with lots 6 and 7 being undetermined. Because no reviewed page prints their commune counts, my sum is not a national total and I do not offer it as one.
Now the condition. The operative text is the consolidated version of decision n° 2023-2802 dated 15 May 2025. Article 9 requires Orange, before the commercial closure of its copper local loop in a given zone, to establish that the FttH local loop is complete in the sense of section 2.2.1a of Annex 2a on the zone concerned, outside very dense zones. Article 10 allows a new commercial closure date with at least three months' notice, and closure at the latest within 24 months of the initially announced date where an alternative very-high-speed solution and an effective commercial offer exist. Article 11 requires the Article 9 criteria to have been met at least 12 months before technical closure, at least 15 months' notice for a new technical date, and a maximum 24-month deferral. (Version consolidée du dispositif au 15 mai 2025)
Read as a test, that is a test of fullness: is the new network complete on this zone? The reviewed excerpt prints no copper line count as a closure condition — no floor below which closure is refused, no minimum share of migrations completed. A commune can be placed in a lot according to how much copper is still live in it and closed according to whether fibre reaches the premises, and those two facts are never printed side by side.
The commune-level dataset shows what is publicly joined. It carries one row per commune or arrondissement, 34 922 rows, plus a 103-row departmental file and a change-history file, last updated 24 November 2026; its description lists closure dates, the ANCT fibre connectability share, postal codes, population, department and region. (Fin du réseau cuivre commune par commune) The publisher's column documentation, dated 23 November 2026, lists the documented fields in full — code_insee, nom, type, code_insee_ville, departement, region, codes_postaux, population, lot, fermeture_commerciale, fermeture_technique, statut, locaux_fibre, locaux_raccordables_ftth, taux_fibre, trimestre_fibre, page, locaux_sans_fibre, locaux_base_adresses, trimestre_adresses — and none of them is a copper line count. (Les données de la fin du cuivre, commune par commune) The date field is itself hedged: "date de coupure prévue du réseau cuivre, sous réserve des critères de l'Arcep ; vide si pas encore fixée".
So a reader can learn the date for any commune and the fibre share beside it, and cannot learn the copper count. That count is not withheld. It is granted. ARCEP's page on Orange's obligations, dated 9 July 2026, states verbatim: "Les collectivités peuvent ainsi solliciter auprès d'Orange, à partir de 12 mois avant la fermeture technique, l'information relative au nombre de lignes cuivre ou au nombre de lignes cuivre inactives depuis plus de 24 mois sur le périmètre de leur commune, sous réserve de la signature d'un accord de confidentialité." (Les obligations d'Orange dans le cadre des différentes phases du plan de fermeture du cuivre)
Twelve months before the technical closure, the mayor may ask, sign, and learn two numbers: how many copper lines stand in the commune, and how many have been inactive for more than 24 months. Everyone else gets an arithmetic exercise. 6,162 million national lines divided by 20 493 listed communes gives about 301 lines per listed commune. I print that quotient only to refuse it: the numerator covers every commune in France and the denominator covers lots 1 to 5, so it mixes two perimeters and is not a per-commune line count.
The same page says the commune is the reference mesh, and that one of Orange's criteria for forming lots is the volume of copper accesses still active on the commune. The count is therefore an input to the schedule and an output of the request right, and the operator holds it at both ends. ARCEP's 2026 annual territories report adds a related disclosure: Orange's trajectory file, updated every six months, includes twelve months before the technical closure "l'information de la part des lignes cuivre encore actives sur la commune". (Rapport annuel territoires connectés 2026, Tome 2) A share is a rate, not a count, and I did not verify that field's name or coverage in the PDF itself.
One date conflict is recorded rather than resolved. ARCEP's copper pages anchor the closure conditions in the market analysis decisions "adoptées le 14 décembre 2023". Its synthetic table of market analyses dates the seventh cycle, those decisions included, to 18 December 2023. (Le 7e cycle d'analyses de marchés, 2024-2028) Both are ARCEP printings. I adopt neither.
What remains is a retirement administered at commune level and measured at national level, with the join held under signature. A commune's date is public, its fibre share is public, its lot is public. Its copper line count on that date is available to one class of recipient, for one window, on one condition. If you are pricing a migration, writing a market study, or bidding against a local operator, the number that would let you size the change is not on the page — and the fact that it is granted rather than withheld is the finding, not a grievance. Ask the commune for its extract. Ask ARCEP for a departmental table.
Either answer would turn this absence into a dated one.
Every absence asserted here is a count over the documents listed below, read on 24 November 2026, and over nothing else. All source text in this piece is provider-reported: the quarterly observatory PDF was reached through a search index's extraction of the exact PDF URL, so its table may be imperfectly linearised. The absence of a communal or departmental copper table is verified for the retrieved section 1.2.1 and its associated table, not for every page of that document. The absence of a copper column in the commune dataset is confirmed against the publisher's documented schema, not by parsing the CSV files.
Nothing here alleges that a closure was premature, that ARCEP or Orange withholds a number, or that an operator failed an obligation. Commercial closure ends the sale of new copper offers; technical closure ends existing copper service, and one is not the other.
Prior coverage: a BTW article of 18 July 2026 on France's copper shutdown read the dependency compact — alarms, lifts, emergency calls, public services — and cited ARCEP's guides. This piece reads the lot arithmetic, the conditions decision and the national series, and asks who can see a commune's count.
Documents read on 24 November 2026
- Observatoire des marchés, 2e trimestre 2026
- Observatoire des marchés, 3e trimestre 2025
- L'organisation d'Orange pour la fermeture de son réseau cuivre
- Les obligations d'Orange dans le cadre des différentes phases du plan de fermeture du cuivre
- Version consolidée du dispositif au 15 mai 2025, décision n° 2023-2802
- La fermeture du réseau cuivre : quels enjeux pour la connectivité de mon territoire ?
- Rapport annuel territoires connectés 2026, Tome 2
- Fin du réseau cuivre commune par commune
- Les données de la fin du cuivre, commune par commune
- Calendrier fermeture cuivre, Orange Business
- Marché des communications électroniques, les chiffres au 2e trimestre 2026
- Le 7e cycle d'analyses de marchés, 2024-2028
- ARCEP in the BTW directory
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.