  • Ansys's verification manuals promise results within three per cent of a target solution — and print no reference value, no computed value, no formula and no uncertainty interval to check it against.
  • In the one lesson table that shows its work, the arithmetic reproduces one of three printed percentages; the other two don't survive either denominator.

The three per cent nobody can divide

Every simulation vendor sells confidence. Ansys sells it in one denomination: three per cent. The claim sits on the quality-assurance page of the Workbench Verification Manual in a single sentence — the general goal is an error of three percent or less (Ansys). What the page never hands you is the arithmetic behind it: no reference value, no computed value, no error formula, no uncertainty interval. A percentage with nothing to divide.

That is the whole trick, and it is worth naming plainly. A number that cannot be recomputed is not a measurement. It is a mood.

The same page is candid about what the published tests are: a partial subset of the full set Ansys developers actually run. The Fluid Dynamics Verification Manual goes further, repeating the goal — results within 3% of the target solution — and then undercutting it in its own words. The manual is a small slice of the quality-assurance library; its cases use one mesh, one turbulence model, one scenario; runtime limits can leave some cases short of grid independence; and, bluntest of all, "It should be noted that these are not validation cases of the models presented" (Ansys). The LS-DYNA introduction makes the same partial-subset confession (Ansys). Rocky's verification-and-validation page gets the definitions exactly right — verification against a conceptual description and its analytical solution, validation against experimental data with both computational and experimental uncertainty accounted for — and then posts no numerical agreement figure at all (Ansys).

The one table that shows its work

Then there is the exception. Verification and Validation Lesson 8, supersonic flow over a wedge, lays theory against Fluent three times: Mach 2.254 against 2.243, billed as 0.8%; static pressure 2.824 atm against 2.803 atm, billed as 0.7%; shock angle 32.22 degrees against 34.99 degrees, billed as 8.2% (Ansys Innovation Space). No formula, no denominator, no sign convention. Just four operands per row and a percentage that dares you to check it.

So check it. From those operands and nothing else: 100 × |2.243 − 2.254| / 2.254 = 0.488%; 100 × |2.803 − 2.824| / 2.824 = 0.744%; 100 × |34.99 − 32.22| / 32.22 = 8.597%. The pressure case rounds cleanly to the printed 0.7. The Mach case lands at 0.488 against a printed 0.8, and the shock angle at 8.597 against a printed 8.2. Flip the denominator to the computed value and you get 0.490% and 7.916%. Neither convention reaches either printed figure, and the page explains neither gap. Two of three percentages do not survive the arithmetic they invite.

What the standard actually measures

The standard those comparisons gesture toward is more interesting than the manual. ASME's public description of V&V 20 says the standard quantifies accuracy for a specified validation variable at a specified validation point, accounts for uncertainty in both simulation and data, and notes that extending accuracy to other points by interpolation or extrapolation needs problem-specific engineering judgment. It supplies no percentage-error equation (ASME). MARIN's explanation of the same standard fills in the form: validation produces an interval centred on the comparison error E = S − D — simulation result minus experimental measurement — with experimental, numerical and input uncertainties setting the width of that interval, and S and D defined on identical geometry, boundary conditions, material properties and heat-transfer coefficients (MARIN).

That is the pivot. In the standard's own arithmetic, the error carries the units of the variable it measures — pascals, degrees, kelvin — and what decides whether a result is good is the width of an interval built from named uncertainties. A per cent is a normalisation somebody chose afterward. Normalise, and you can drop the units; drop the units, and the uncertainty that shared them goes with them. Ansys's bare three per cent is not a rounding of the standard's interval. It is a different object entirely.

Three per cents, three different things

The three per cents in the read set are not one measurement wearing three costumes. Adaptive Convergence makes the criterion a prescribed percent change in results — default 20% — comparing successive adaptive-mesh solutions (Ansys). Discovery and LiveGX set a solution-stopping default of 0.01, or 1%, on percent change in solution, and carefully separate engineering convergence, numerical convergence and monitored-value convergence (Ansys). Both compare a solution with the previous solution of the same model. The three per cent compares a computed value with a stated target. No page in the read set states a relation among the three — which is precisely how a convergence tolerance gets quoted, by accident, as an accuracy guarantee.

The Mechanical APDL listing is the one place the divisor survives in public, and it survives because a human typed it: R1=FREQ(1,1)/7.938, the computed first frequency over an explicit target (Ansys). The detailed RESULTS COMPARISON output is configured to print TARGET, computed value and RATIO. The compact report prints computed value, RATIO and INPUT — with no TARGET column. The ratio is identical in both. The reader's ability to check it is not.

The corporate perimeter

The perimeter is corporate as well as numerical. Synopsys completed its acquisition of Ansys on 17 July 2025; the 16 January 2024 date still floating around was the announcement, not the close (Synopsys). The Form 8-K names the acquired corporation as ANSYS, Inc. and confirms Ansys survived the merger as a wholly owned Synopsys subsidiary (SEC). The site keeps the Ansys name, describes the business as part of Synopsys, and www.ansys.com redirects there (Ansys). The company BTW tracks is ANSYS, Inc..

Scope, honestly stated

Thirteen documents were read on 29 November 2026 — eight technical, two standards and third-party, three corporate — and every absence above is scoped to them. The page www.ansys.com/simulation-topics/what-is-verification-and-validation could not be retrieved at the review date, so nothing is claimed about its contents. The full normative text of ASME V&V 20 was not retrieved, so equation-level statements rest on ASME's own product description and MARIN's explanation. The equation embedded as an image on the Adaptive Convergence page was not read, so the 20% criterion's denominator is stated only as the page states it. No aggregate count of published Ansys verification cases appears in the read set; none is asserted, and none is inferred from the highest test identifier. Lesson 8 compares against an analytical reference, not an experimental dataset.

The single operand nobody prints is the uncertainty of the reference itself. If the target solution carries an uncertainty of the same order as the agreement being quoted, the percentage is reporting the resolution of a ruler whose graduations were never described. A simulation result was never on a meter. Its licence is a fraction whose denominator is somebody else's measurement — or, in the standard's own arithmetic, no fraction at all.