Summary

  • The abandoned mine land reclamation fee is the lower of a per-ton rate and a percentage of the coal's value, so a year's printed dollars set a floor on that year's tonnage and no ceiling at all.
  • The dollars reconcile to the cent while the quantity enters the fund only as an operator's signed declaration, and the office that collects it publishes a compliance rate above 99 per cent without publishing either count that would produce it.

Start with the money, because the money is the part that behaves. The office's own grant distribution for the current cycle prints total fee collections of $81,902,209.42, a state and tribal share of $40,951,104.71, and a thirty per cent line of $24,570,662.83 (Fiscal Year 2026 AML Fee-Based Grant Distribution). Those three figures are not approximations of a ratio; they are the ratio. $40,951,104.71 divided by $81,902,209.42 is exactly 50.00 per cent, and $24,570,662.83 divided by the same total is exactly 30.00 per cent to the cent. Subtract both from the total and $16,380,441.88 remains, exactly 20.00 per cent, which is the Secretary's share from which the $3 million floor for small programmes is funded (30 CFR Part 872). The arithmetic is mine; the three printed numbers are the office's, and they were printed on the same page.

The same page's unappropriated balance behaves identically. At 30 November 2025 it stood at $3,026,684,476.49, allocated as $1,608,218,361.28 of historic coal, $132,088,894.26 of federal expenses, $1,192,224,765.32 of UMWA reserve and $94,152,455.63 of state share. Add the four lines in that order and you get the printed balance to the cent — my arithmetic, and it is the kind of arithmetic a fund produces when someone inside it cares about reconciliation. Within that balance, the UMWA reserve is 39.4 per cent and the historic coal line is 53.1 per cent, both operands on one page, both quotients mine.

The fund also publishes its balance at a second cut-off. On 30 September 2025 the statement of the Abandoned Mine Reclamation Fund put cumulative fees plus interest at about $14.233 billion — $10.455 billion collected in fees and $3.778 billion in interest — with about $11.302 billion, or 79 per cent, appropriated or awarded and $2.931 billion, or 21 per cent, unappropriated (Status of the Abandoned Mine Land Reclamation Fund, 30 September 2025). The same document explains why the November figure is larger: collections spike in the final two months of the collection cycle, which is why annual formula grants are computed after 30 November. Between the two cut-offs the unappropriated balance moved about $95.7 million. That difference is mine, and it is good to about a million dollars and no further, because the September figure is printed to three decimal places in billions; it is a movement across the two-month tail both documents describe, not a trend. The September statement also excludes the Bipartisan Infrastructure Law and AMLER money by its own text, so its balance is not on the same basis as the November grant distribution.

Now look for the tons. They are not there. Across the thirteen pages reviewed for this piece — the fee statute, four sections and the whole of two parts of the fee regulations, the fund-status statement, the current grant distribution, the compliance programme page, the office's chronology of the statute, the current budget justification and two inspector-general documents — no page prints the tonnage of coal produced in the year for which fees were collected. The office's own budget justification contains a table titled "Coal Production and AML Fee Collections", listed at page 102 of its table of contents.

That document, and a separate file of its tables, could not be opened as documents by this reading: the first came back too large to open and the second carried no readable text, so the table's existence, title and page come from its own contents list and no cell of it is quoted here. A second trap sits beside the first: table numbering shifts between editions. In the current justification, Table 8 is a table of state, tribal and federal responsibilities with no tonnage column at all, so a citation to a numbered table means nothing without its edition.

The missing tonnage is not a gap that a bigger search would fill in an afternoon. It is the shape of the instrument. Read the fee as the statute writes it: 22.4 cents per ton of coal produced by surface coal mining and 9.6 cents per ton of coal produced by underground mining, or 10 per cent of the value of the coal at the mine as determined by the Secretary, whichever is less; for lignite, 2 per cent of the value or 6.4 cents per ton, whichever is less (30 U.S.C. 1232). Because the charge is the lower of two products, no ton can ever pay more than its category rate — and a ton can pay arbitrarily little, because the second branch prices coal at a percentage of a value that can itself be low. Divide the printed dollars by the highest rate the statute allows any ton to pay and you get the floor: $81,902,209.42 at 22.4 cents implies at least 365,634,863 short tons, about 365.6 million. That is my division, with its assumption stated in the same sentence — every ton paying the surface rate is the most any mix of coal could have paid per ton. There is no ceiling, and there cannot be one, because a ton sold cheap enough pays almost nothing.

The division I would rather perform is the one the reviewed pages do not permit. Fee dollars divided by fee tons, as an effective charge per ton, is a quotient I refuse: the tonnage is printed nowhere in the thirteen pages, and the ad valorem branch leaves the divisor unbounded, so the quotient would carry two unknowns and one number. What survives the refusal is the floor above, and the floor is worth more than a false point estimate, because it is the one statement about the year's quantity that the printed dollars actually prove.

The regulation, meanwhile, publishes a division it never shows its working for. 30 CFR 870.13 converts "whichever is less" into three prices: for surface-mined anthracite, bituminous and subbituminous coal, a fee of 22.4 cents a ton where the value is $2.24 a ton or more and 10 per cent of the value below that; for underground-mined coal, 9.6 cents above $0.96 a ton and 10 per cent below; for lignite, 6.4 cents above $3.20 a ton and 2 per cent below (30 CFR 870.13). Each of those three thresholds is the printed rate divided by the printed percentage: 22.4 cents over ten per cent is $2.24, 9.6 over ten per cent is $0.96, 6.4 over two per cent is $3.20. The regulation publishes the quotient as a price and leaves the division to the reader. Mine, and the only reason it matters is that the threshold moves whenever either limb moves — which makes the three prices a thermometer of the fee schedule rather than a fixed feature of the coal trade.

The office's chronology page confirms the current schedule and the surviving alternative: for coal sold, transferred or used on or after 1 October 2021, 22.4 cents a ton for surface-mined coal except lignite, 9.6 cents for underground-mined coal except lignite, 6.4 cents for lignite, and the ad valorem alternative of 10 per cent of value for surface or underground coal and 2 per cent for lignite continuing in effect (Chronology of Major SMCRA-Related Events). Two limbs, one line, one filing. Every quarter, both numbers are computed somewhere and the smaller one is paid.

Where the fee attaches matters as much as its rate. 30 CFR 870.12 fixes the measurement point at the weight and value of the coal at the time of the initial bona fide sale, transfer of ownership, or use by the operator — the first transaction or use immediately after the coal is severed or removed from a reclaimed coal refuse deposit. Value is determined F.O.B. mine; weight is the actual gross weight; impurities not removed before that first transaction, excluding allowable excess moisture, are not deducted. An operator selling on a clean-coal basis must keep records showing run-of-mine tonnage and the basis for the clean-coal transaction, and insufficient records subject it to fees based on raw-tonnage data; if surface-mined and underground-mined coal are combined before weighing, the higher fee applies unless the operator substantiates the surface-mined amount through engineering calculations or other reports the Director requires (30 CFR 870.12). Read that as a sentence about evidence: the price that decides which limb binds is a price at the mine, fixed at a transaction the operator arranges, and the deduction that reduces the tonnage is a subtraction the operator makes and must be able to defend from its own books.

One limb does carry a third party. The same regulation sets in-situ fees of 9.6 cents a ton for coal other than lignite and 6.4 cents for in-situ lignite, based on British thermal units per ton in place equated to the gas produced at the site, certified through analysis by an independent laboratory. It is the only place in the reviewed set where the conversion from one unit to another is certified by someone who is not the operator and not the office, and it is worth naming precisely because it is the exception.

The filing itself is unremarkable and that is what makes it total. The fee is based on calendar-quarter tonnage and must be paid no later than 30 days after the end of each calendar quarter, and with any payment the operator must submit a completed Coal Sales and Reclamation Fee Report — the OSM-1 Form. The form reports the tonnage of coal sold, used or transferred, the name and address of any person or entity owning 10 per cent or more of the mineral estate for a permit, and of any purchaser of 10 per cent or more of that permit's production in the quarter; where no single owner or purchaser meets the threshold, the operator reports the largest single one; and the operator may designate the ownership and purchaser information confidential at the time of reporting (30 CFR 870.15). The statute adds the fields that let a stranger cross-check the operation — the permittee, any operator in addition to the permittee, the owner of the coal, the preparation plant, tipple or loading point, the person purchasing the coal, the SMCRA permit number and the mine safety and health identification number — and requires the statement's accuracy to be sworn to by the operator and notarized (30 U.S.C. 1232).

Then the regulation offers an alternative to the seal. An electronic filer must either maintain a properly notarized paper copy of the identical OSM-1 for review by fee-compliance auditors, or submit an electronically signed and dated statement made under penalty of perjury that the information is true and correct; a paper filer may submit either a notarized copy or the form with a signed and dated statement under penalty of perjury reading, in the regulation's own words, "I declare under penalty of perjury that the foregoing is true and correct" (30 CFR 870.17). Two evidentiary standards now stand behind one filed number, and no reviewed page dates the alternative or names the rulemaking that produced it. The difference between a notarial seal and a self-declaration is not a difference in the penalty for lying — it is a difference in who, if anyone, looked at the document before it entered the system.

What the office says it checks is narrower than the form. A compliance audit is defined as an examination of records and other competent evidential matter to determine whether the tonnage reported on the OSM-1 Form is fairly presented and whether the operator complied with the reclamation fee provisions; permittees and operators must keep records for at least six years from the end of the calendar quarter in which the fee was due or paid and make them available to auditors; and the office states that books and records should substantiate the tonnages, moisture deductions and fee calculations reported on the form (Compliance Management). The same page supplies the number everyone quotes and the two numbers nobody does: collection and compliance "consistently exceeds 99%", audits follow Generally Accepted Government Auditing Standards and have received the highest ratings in independent peer reviews — and the page prints no count of returns filed and no count of returns examined. Across the thirteen reviewed pages, neither count appears anywhere.

A rate without its operands is a claim, and the reviewed set does contain one document that once printed the paired counts. The Department of the Interior's inspector general surveyed the fee compliance programme in 1997 and reported, for fiscal year 1996, 383 audit reports identifying about $4 million in underreported or unreported reclamation fees, against 989 reporting coal operators and 7,960 fee collections totalling $255 million. The inspector general sampled 30 of the 383 reports, covering about $24,000 of the roughly $4 million. In that year 278 of 989 operators paid by electronic transfer, $238 million, or 93 per cent of fees paid; hard-copy OSM-1 forms went to a contractor lockbox in Pittsburgh and were keyed into the Fee Billing and Collection System in Denver; and the inspector general did not verify whether all producing operations subject to the fee had been identified, because that would have required reviewing state records (Survey Report on the Fee Compliance Program, 97-I-1303).

Three quotients from that document are mine and all three are orders of magnitude rather than rates, because both dollar figures are rounded on the page: $4 million of identified underpayment against $255 million of collections is about 1.6 per cent; 383 audit reports against 989 reporting operators is 0.387 reports per operator, roughly one audit product for every two and a half operators; and the 30 sampled reports covered $24,000 of the $4 million, about 0.6 per cent of the underpayment the sample was drawn from. Fiscal 1996 is not current coverage, and I do not present it as such.

It is, however, the only reviewed page where an audit count and a filing count meet, and its shape is instructive: near one audit report per operator in a world of 7,960 quarterly collections.

The mechanism under test has two places to hide a gap and neither of them is fraud. A tonnage declared low enough is a fee that was never owed, and the declaration is the only place the number appears. A distribution keyed to a base year is a payment that describes the past rather than the present, and the distribution is where the money leaves. Hold both in mind and the rest of the instrument reads as a single design: price the declaration, sample the declarant, and spend the proceeds on a map.

The map is precise. The state share is 50 per cent of the reclamation fees collected from within the state, excluding fees collected on Indian lands, for coal produced in the previous fiscal year, going to states with approved reclamation plans that are not certified; the tribal share is 50 per cent of fees for coal produced in the previous fiscal year from Indian lands; historic coal funds are 30 per cent of annual fee collections for coal produced in the previous fiscal year plus 60 per cent of any other revenue to the Fund, distributed by a formula based on coal historically produced before 3 August 1977, to uncertified states and tribes with unfunded Priority 1 and Priority 2 coal problems; minimum program make-up money brings an eligible state or tribe up to $3 million each federal fiscal year from the Secretary's 20 per cent share; and certified in-lieu payments come from the general funds of the Treasury at 50 per cent of the previous fiscal year's fees, with an equivalent amount in the Fund transferred to historic coal when they are distributed (30 CFR Part 872).

The grant distribution names its own base. It states that fees counted for the year are those received from 1 December 2024 to 30 November 2025 rather than in the federal fiscal year, and that the historical coal production tonnage percentages are derived from the office's 1980 Environmental Impact Statement for coal produced before the Surface Mining Control and Reclamation Act's enactment on 3 August 1977 (Fiscal Year 2026 AML Fee-Based Grant Distribution). From 3 August 1977 to 30 November 2025 is 48 years, 3 months and 27 days — my count — so the largest top-up term in the distribution is keyed to coal dug more than forty-eight years before the fees it helps divide. The percentages that turn that history into a split were fixed by an environmental impact statement issued in 1980, which means they cannot be re-derived from anything a reader can open today.

The liability the fee pays against is stated just as plainly. The inspector general estimates $8.1 billion to address the remaining Priority 1 and Priority 2 coal-related sites, plus an estimated $5 billion of Priority 3 features, for about $14.1 billion of unfunded abandoned mine land features, and records that the federal inventory is not comprehensive: it provides limited information on non-coal features, excludes indirect costs such as planning, design and permitting, and states did not record all features in it, so the federal inventory did not match the states' own (Final Inspection Report, 2022-CR-022). Set $14.1 billion against the $3,026,684,476.49 unappropriated balance and you get about 4.7 times. That quotient is mine and it is a comparison of magnitudes, not a solvency test: one side is a state-and-tribe-supplied planning estimate that includes Priority 3 and excludes indirect costs, the other is an unappropriated fund balance. It tells you the two numbers are not the same order of thing. It does not tell you when the fund runs out, and no reviewed page does.

The forward schedule is short. The fee is due within 30 days of each quarter's end and the collection authority ends 30 September 2034 (30 U.S.C. 1232). The Bipartisan Infrastructure Law extended that authority through 30 September 2034 and reduced the fee amounts by 20 per cent; the current justification describes the fee compliance programme as two integrated components, collections and audits, requests $5.9 million for the financial management function that carries collections, compliance and audits together with grants financial management and investment of the fund balance, and lists among its initiatives maintaining systems for collections, fee rates, tonnage and violations and increasing automation in fee compliance audits (Budget Justifications and Performance Information, Fiscal Year 2026). If the printed per-ton rates are the printed 20 per cent reduction applied to an earlier schedule, that earlier schedule was 28.0, 12.0 and 8.0 cents — 22.4, 9.6 and 6.4 each divided by 0.8, all three exact, mine, derived from two pages and printed on neither.

Five divisions that the record invites and I refuse are worth stating, because each refusal is a fact. The current cycle's $81,902,209.42 against the receipts line of $93,183 thousand for fiscal 2024 is not a year-on-year change: the first is struck on a 1 December to 30 November collection cycle and the second as of 30 September, missing the tail, so they are two perimeters and not a decline. The fiscal 1996 underpayment share of about 1.6 per cent against anything modern is refused, because it comes from a sample of 30 reports and a fee schedule no reviewed page prints.

The $3 million minimum against a named recipient's actual grant is refused, because the reviewed set prints the floor and the aggregate shares and no per-recipient amount. The 50 per cent state share of current fees against a named state's payment is refused, because the share is computed on coal produced in the previous fiscal year and no state-level row is printed. And the effective charge per ton is refused for the reasons already given.

What remains on the table is the four quotients the pages do support to the cent, the three break-even prices the regulation publishes without showing the division, and one floor on tonnage with no ceiling above it.

This is where the reading stands against what BTW had already published. A search of the record on 26 November 2026 over the word "mining" returned twenty results, published between 5 August 2024 and 7 October 2025, and they are corporate, private-network, cryptocurrency and data-mining pieces; none opens a statutory per-ton charge, a tonnage declaration, a value ceiling or a distribution formula.

The same day's directory searches for "mine safety" and "mining", returning three and twenty-five candidate identities, contain no Mine Safety and Health Administration, and the Federal Mine Safety and Health Review Commission, which carries one of my own articles, tested an adjudicative body's case flow rather than a money instrument. The nearest adjacent edge in my own index is the Union Pacific reading, where a reportability threshold was itself a product of a printed multiplier and a printed base.

Here the charge is the lower of a rate and a percentage, its quantity is a declaration, and its proceeds are distributed on a map drawn before the coal being charged was dug.

One sentence of housekeeping, because a directory is a filing cabinet and not an argument. The entry that anchors this reading, the Office of Surface Mining Reclamation and Enforcement, is the routing handle under which this publication tracks the office; what is read here is the fee it collects and the distribution it administers, and nothing in this piece describes a network or an addressing role, because the reviewed pages do not.

What would settle it is one page, and it is worth describing exactly, because the office already knows how to write every column. A single table that printed, for one year, the declared tonnage by category, the rate applied to each category, the share of tonnage on which the value branch bound instead, the dollars collected, and the dollars distributed would turn the floor into a point and turn 99 per cent into a computable rate.

Until someone reads that page, the record supplies the money to the cent and the quantity not at all, and the compensating discipline is to stop printing a rate above 99 per cent without the two counts that produce it.