Summary
- The IANA naming function's service levels are printed on the operator's own page: each row carries a threshold, a Max or Min type, an aggregate compliance percentage and a period of one month. The page is marked last updated 2 July 2020.
- The duty to publish a monthly finding sits in the Customer Standing Committee's charter, the consequence for a missed level sits in a separate Remedial Action Procedures document, and the condition on the operator's duty to comply sits in one contract clause. No document read here prints all four for the same level.
- The August 2026 finding reports 100 per cent and all 64 thresholds met. That percentage counts thresholds, not requests, which is a different quantity from the 95, 99 and 100 per cent printed in the table beside it.
The standard is on the operator's page
The service levels are published by Public Technical Identifiers, the contractor that performs the naming function under the IANA Naming Function Contract. The page says what it is: these agreements "describe the expected level of performance of the IANA Naming Functions, as required by Annex A, Section 2(c) of the IANA Naming Function Contract". It is marked "Last updated 2 July 2020" and it is the page the amendment process points at, stating that the service levels "are memorialized at" it "and are incorporated by reference in the obligations of the IANA Naming Functions Contract" (PTI service level agreements, amendment process).
Every row carries five fields: Metric, Threshold, Type, Compliance, Period. The printed examples do the work of a specification. Root zone changes must be published within 72 hours of validations and reviews being completed, Type Max, Compliance 99 per cent. A ticket confirmation must reach the requester within 60 seconds of an automated change request, Max, 95 per cent. Dashboard updates are capped at 30 minutes, Max, 100 per cent. Root zone management system availability is set at 99.0 per cent as a minimum, with the compliance entry printed as a trigger below 99 per cent.
Two root zone accuracy metrics sit at 100 per cent as minima and carry a compliance entry printed as "<100%".
Period deserves its own sentence, because it is the field that makes the rest mean something: every row on that page measures a month. Compliance is defined there as the percentage that the target goal in aggregate must be met or exceeded within the specified period for all requests in the category. The integrated contract text supplies the formal vocabulary, defining Period as the time over which compliance is measured and Type as whether the threshold is a floor or a ceiling (integrated contract through Amendment 2).
The 100 per cent that is not the compliance percentage
Here is where a careless reader loses the thread. The August finding prints 100 per cent and, in the same breath, 64 of 64 thresholds. The two belong together: the percentage counts thresholds. The percentages in the service level table count requests. On a 99 per cent metric, one request in a hundred may miss and the metric still passes. On a 95 per cent metric, five may. So a finding of 100 per cent says every threshold cleared its own compliance level, which is a demanding claim; it does not say every request cleared every threshold.
Neither document puts the two quantities side by side, and this distinction is my reading of two printed definitions rather than a contrast either publisher draws. It matters anyway. A customer who takes "100%" as per-request performance will expect a month without a single late root zone change. A customer who reads the table will expect a month in which no more than one request in a hundred was late on that metric, and will be right to.
The duty to publish sits in the customers' charter
The Customer Standing Committee was established to perform the operational oversight previously performed by the National Telecommunications and Information Administration, effective 1 October 2016, for the direct customers of the naming services. Its amended charter was adopted 3 May 2026 and took effect 3 July 2026. The operative sentence for our purposes is that the committee "monitors performance against agreed service levels on a monthly basis and publishes its findings monthly" (amended charter).
The same charter prints the committee's working rules: all four members present for quorum, an alternate counting toward it, minutes published within five business days, at least monthly meetings by teleconference, and at least two meetings a year with the operator's Board. Nobody wrote that last provision for decoration. A body that must sit with the operator's directors twice a year has a room in which to say a number out loud.
The publication record backs the duty. The index of findings runs from a report on October 2016 published on 30 November 2016 to the August 2026 finding published 16 September 2026. Ten years of monthly findings is not a press release; it is an institution with a habit.
The consequence sits in a joint procedure
The Remedial Action Procedures of 19 February 2019 open by describing themselves: they "have been developed and agreed to by the Customer Standing Committee (CSC) and PTI in accordance with the provisions of the CSC Charter and the IANA Naming Function Agreement" (remedial action procedures). They define a performance issue by reference to the ICANN Bylaws definition and then print clocks.
The committee informs the operator's liaison and invites the PTI President to comment within ten business days. The committee transmits a written Remedial Action Request Report to the PTI President, copying the ICANN GDD President, within ten business days of finalising its review. The PTI President convenes a meeting or call within ten business days of receiving the report. A corrective action plan arrives within ten business days of that meeting. The committee approves or rejects within ten business days and may require one revision, itself ten business days.
Add those clocks and you get five successive ten-business-day steps before a decision on a corrective action plan: fifty business days, roughly ten working weeks, sixty with one revision round. Then three escalation rungs, the PTI Board, the ICANN CEO and the ICANN Board, each with its own ten-business-day steps. The totals are mine, summed from the printed clocks.
One clause in that procedure is stranger than the rest. The document is to be reviewed twelve months after first initiation and every twelve months after a subsequent invocation. On its own wording, a procedure never initiated has never started that clock.
The consequence is filed on a page that will not date itself
The committee's Other Procedures page hosts the adopted remedial action procedures and the process for amending the service levels. It prints a heading and two links. It prints no version number and no effective date for either. So the page that tells a reader which remedial procedure is adopted cannot tell them when it was adopted. The 19 February 2019 text is the adopted text because a page says so, and the date is on the PDF, not on the decision to adopt it.
The condition sits in one contract clause
Section 8.2 of the contract, the IANA Problem Resolution Process, obliges the Contractor to work cooperatively with the committee to develop remedial action procedures for addressing performance issues, and to comply with them where the committee also complies. Read the second half slowly. The operator's duty to follow the procedure is conditioned on the committee doing the same.
The record read for this briefing contains no instance of that condition being invoked. It stands as a qualification on an obligation, neither a live defence nor an empty formality, and the difference cannot be settled by the text alone. The clause-level wording also carries a caveat of its own: the integrated version is marked "For Information Only" and states that the executed agreement and its published amendments control. The agreements index dates the executed contract 30 September 2016, with Amendment 1 of 7 May 2019 and Amendment 2 of 30 June 2024. The URL tried for the executed contract itself returned a 404 on 25 November 2026, so the executed wording of Section 8.2 was not obtained in this review.
The one consequence the committee does not have
The charter hands the committee remedial authority and a referral route to the ccNSO and GNSO Councils for an unremedied issue. It then states the limit: the committee "is not authorized to initiate a change of IANA Functions Operator via a Special IANA Function Review". Everything else in this chain ends above the operator. The remedial ladder climbs to the PTI Board and then the ICANN Board. The referral route ends at two supporting organisations that can raise the matter elsewhere.
Only the operator-change mechanism, and the contract cycle, reach the question of who holds the function, and the committee's own charter says that route is not its to open.
What a customer should ask
A TLD registry operator, a root server operator or a government that depends on the naming function is not short of numbers. Sixty-four thresholds, monthly periods, a compliance percentage on every row, and a decade of monthly findings. The awkward question is which document turns a measured month into a finding, and which turns a finding into an obligation. Today that is four documents: the operator's page for the standard, the customers' charter for the duty to publish, a jointly agreed procedure for the clocks, and one contract clause for the condition on the operator's duty. Read the IANA directory entry for the function's public record, and read the table before the finding. A customer who reads only the finding is reading the middle of a chain whose ends are filed elsewhere, and the operator's own performance hub, which reports naming at 100 per cent of service levels met from August to October 2026, will not tell them where those ends are either.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle