Summary

  • RIPE-868's screening table runs from 20/04/2022 to 01/10/2026. Total alerts rose from 766 to 2,339, confirmed and applicable cases from 4 to 53, and the alerts needed per confirmed case fell from 191.5 to 44.1, the lowest in the series.
  • The share of alerts cleared as false positive, not applicable, exempted or OFAC rose from 29.63% to a peak of 94.29% on 07/10/2025 and then slipped to 90.12% on 01/10/2026.
  • Open work — not yet started plus under investigation — fell from 535 to a floor of 84 in October 2025 and returned to 158 in October 2026, of which 39 had not been started; 158 is the highest since December 2024.

Nineteen quarters in one table

The report publishes its screening history as a quarterly snapshot, which is unusual and useful: most regulators publish a stock and no series. Read end to end, the table tells a story about a compliance machine that learned its job.

Total alerts: 766 in April 2022, 1,205 by July 2023, 2,057 in January 2026, 2,339 on 1 October 2026. Confirmed and applicable cases: 4, then 2 at the low point in mid-2023, 12 in October 2024, 24 in January 2026, 25 in July, and 53 in October 2026.

Divide one by the other and the efficiency claim becomes visible. Each confirmed case now sits behind 44.1 alerts; in April 2022 the same ratio was 191.5, and at the worst point, July 2023, it was 602.5. The direction is unambiguous: more alerts, better filtering, a growing confirmed count, and a falling cost per finding.

That is the good news, and it is real. It is also the only good news the series contains, because the two numbers that would turn it into management — how long an alert takes to clear, and how many holders are waiting behind one — are not in the report at all.

The backlog went to zero and came back

The "not yet started" column spent its first three years filling up: 362 in April 2022, 456 by July 2023, 414 in May 2024. Then it drained: 228 in October 2024, 23 in April 2025, zero from July 2025 through July 2026. And then, in the quarter ending 1 October 2026, it returned to 39.

That zero is a good headline and a misleading one. Under investigation never emptied: it read 173 at the start, 145 in mid-2023, 84 in October 2025, and then 87, 99, 110 and 119. Add the two columns and open work went 535, 601 at its peak in July 2023, 349 in July 2024, 257 in October 2024, 117 in April 2025, then 90, 84, 87, 99, 110 — and 158 now, the highest since December 2024.

So the backlog did not reach zero and come back. It reached 84, the lowest point in the series, and has risen for four consecutive quarters. Whether the report's own reading would call that a backlog is a fair question, and the report does not answer it: no target, no commentary, and no explanation of whether the 39 unstarted alerts are new matches, resumed work, or the other half of the 28 confirmed cases that appeared in the same snapshot.

The definition changed under the series

One line in the notes breaks the series in half. Up to 01/07/2024, "OFAC investigation cases were excluded" from the totals. Everything from 01/10/2024 onward includes them.

That matters for reading the trend, because the composition tables changed with it: Member alerts jump from 595 to 818 and End User alerts from 738 to 785 between 01/07/2024 and 01/10/2024, and the total goes from 1,338 to 1,608. Some of that is new work and some of it is a wider definition.

The report does not publish the number that would settle it: how much of each quarter's increase is new alerts and how much is scope. A reader comparing the ends of the series is comparing two different populations, which is why the 44.1 ratio should be read as "much better than 2022" and not as a rate.

Who the alerts are about

The composition column is the quiet part. Member alerts went from 343 to 1,098; End User alerts from 419 to 1,234; Inter-RIR transfers from 4 to 7. End Users have outnumbered Members since the snapshot of 07/10/2025, when they read 998 against 975, and the gap is now 136.

That inversion is worth stating plainly. The group that generates most screening work at RIPE is not the one with an account manager. End Users are holders with a contract, a registration and no LIR relationship of the kind that produces the newsletter, the portal tutorials and the audit visit. They are also the group whose cases are most likely to stall for lack of paperwork, which is where the on-hold count comes from: zero in 2022, 10 in March 2023, 6 through much of 2024, 16 from January 2026, 20 now.

What the report still will not say

Four figures would turn nineteen quarters of counts into a performance record, and none of them appears: the time to clear an alert, by median and by maximum; the split of the 2,108 cleared alerts between false positives, exemptions and OFAC-only matches; the number of holders behind the alert count, since one holder can generate several; and a target for the backlog, so that a zero quarter reads as a success rather than an accident.

The one that would change the judgment fastest is duration. If the cleared 90% are cleared in days, this is a well-run filter doing dull work. If they are cleared in months, then every one of the 158 open cases is a holder waiting for a decision about resources it is still using and cannot sell — and the improvement in the ratio is the improvement of a queue, not of an outcome.

Sources: RIPE-868, RIPE NCC Quarterly Sanctions Transparency Report (Q4 2026); RIPE-863, Due Diligence for the Quality of the RIPE NCC Registration Data; RIPE NCC Member Update: November 2026.