Trends

EXA launches new Low-Latency fibre route across Europe

EXA Infrastructure has deployed a new 1,200 km low-latency fibre route linking London, Frankfurt, Amsterdam, and Brussels.

eva

Headline

EXA Infrastructure has deployed a new 1,200 km low-latency fibre route linking London, Frankfurt, Amsterdam, and Brussels.

Context

EXA Infrastructure , Europe’s largest dedicated digital infrastructure provider, has deployed a new 1,200 km fibre route connecting London (UK) with Frankfurt (Germany), Amsterdam (the Netherlands) and Brussels (Belgium). The project comprises 1,085 km of new low‑loss G.652D terrestrial fibre and a 115 km G.654C ultra‑low‑loss subsea section under the North Sea, from Margate (England) to Ostend (Belgium). EXA is the sole telecom consortium member responsible for landing and backhaul services on this consortium submarine cable, marking its 21st and 22nd global cable landing stations. The build upgrades In‑Line Amplifier facilities across the UK, Belgium and the Netherlands.

Evidence

Pending intelligence enrichment.

Analysis

Steve Roberts, EXA’s SVP of Strategic Network Investments, highlighted that this is the “first new subsea cable on this complex corridor—in the North Sea—for 25 years,” complementing existing Channel Tunnel routes. COO Ciarán Delaney noted the regulatory and seabed challenges required on‑region expertise and sophisticated installation methods to future‑proof connectivity. Also read: EXA Infrastructure strengthens C-suite with strategic leadership Also read: Exa and Ultranet to build Milan-Genoa fibre route This new route offers significantly lower latency and more resilient connectivity between major financial centres. It supports Europe’s digital infrastructure at a time when traffic between these hubs—and across transatlantic segments such as EXA Express, Dunant, Havfrue and Amitié—is surging. The deployment also bolsters continental capacity by complementing EXA’s recent 1.2 Tbps terrestrial upgrades in partnership with Nokia’s ICE7 coherent optics—bringing efficiency and power‑per‑bit reductions of up to 50 per cent.

Key Points

  • Ultra‑low‑loss subsea and G.652D/G.654C terrestrial fibre ensures minimal latency
  • Expands EXA’s global network and bolsters Europe’s digital resilience

Actions

Pending intelligence enrichment.

Author

Jocelyn Fang