Institution Profiling / Digital infrastructure institution

AD MEPSO JSC

MEPSO operates the national high-voltage electricity transmission grid under a mandate confirmed by ENTSO-E and the national energy regulator. Its internet presence is minimal, with an ASN registration that places it on the public routing map, though no active IP prefixes are currently evident.

AD MEPSO JSC
Caption: AI-generated BTW editorial image for AD MEPSO JSC, grounded in public source context: Registry RDAP / WHOIS record; RIPE registry record; Operator website; Operator website. · Source context: Registry RDAP / WHOIS record; RIPE registry record; Operator website; Operator website. · Relevance reason: The image must visually connect AD MEPSO JSC to its public operating context, using the verified source context rather than generic network art: MEPSO is the sole transmission system operator in North Macedonia, responsible for planning, construction, and operation of the national high-voltage grid. · Image provenance: Registry RDAP / WHOIS record; RIPE registry record; Operator website; Operator website.

Sources

Public references used for this article.

  • Registry RDAP / WHOIS recordpublic-source identity and registry context for AD MEPSO JSC. (source risk: low)
  • RIPE registry recordRIPEstat provides a public overview page for ASN AS210865, corroborating that the ASN exists in RIPE-related routing/registry systems. (source risk: low)
  • Operator websiteMEPSO describes itself as the electricity transmission system operator in the Republic of North Macedonia. (source risk: low)
  • Operator websiteThe company publishes official contact details and confirms use of the domain mepso.com.mk. (source risk: low)
  • entsoe.euENTSO-E identifies MEPSO as the transmission system operator for North Macedonia. (source risk: low)
  • erc.org.mkThe Energy, Water Services and Municipal Waste Management Services Regulatory Commission of North Macedonia provides regulatory context for electricity market and transmission licensing relevant to MEPSO’s operating environment. (source risk: low)
CategoryInstitution

MEPSO operates the national high-voltage electricity transmission grid under a mandate confirmed by ENTSO-E and the national energy regulator. Its internet presence is minimal, with an ASN registration that places it on the public routing map, though no active IP prefixes are currently evident.

RegionNorth Macedonia

As the sole electricity transmission operator in North Macedonia, any observable change in its internet-facing posture—such as new prefix announcements, registry alterations, or domain modifications—offers a signal that could indicate shifts in network dependency, infrastructure reach, or operational continuity relevant to infrastructure risk mapping.

Signal FocusDigital infrastructure institution

As the sole electricity transmission operator in North Macedonia, any observable change in its internet-facing posture—such as new prefix announcements, registry alterations, or domain modifications—offers a signal that could indicate shifts in network dependency, infrastructure reach, or operational continuity relevant to infrastructure risk mapping.

Content TypeProfile

MEPSO operates the national high-voltage electricity transmission grid under a mandate confirmed by ENTSO-E and the national energy regulator. Its internet presence is minimal, with an ASN registration that places it on the public routing map, though no active IP prefixes are currently evident.

Primary DomainInfrastructure

Changes in AD MEPSO JSC’s public internet records directly alter the baseline for assessing this critical energy operator’s network dependencies. A newly announced IP prefix or a reassigned ASN could reflect a material expansion or reconfiguration of its digital control surface, impacting how external parties evaluate interconnected infrastructure risk.

TopicDigital infrastructure institution

AD MEPSO JSC is identified in public internet registries as the holder of AS210865 and is the legal name for North Macedonia’s electricity transmission operator. Six official sources—including RDAP, RIPEstat, operator website, ENTSO-E, and national regulator—confirm the organization’s identity and TSO mandate. No IP prefix announcements are currently observable, so the public footprint is limited to the ASN registration. The key uncertainty is the absence of a direct corporate registry extract and prefix data; watchpoints center on changes to AS210865 records, new prefix announcements, or domain modifications. This profile is useful for infrastructure dependency mapping but does not capture internal network topology or financial structure.

ImpactMedium

Changes in AD MEPSO JSC’s public internet records directly alter the baseline for assessing this critical energy operator’s network dependencies. A newly announced IP prefix or a reassigned ASN could reflect a material expansion or reconfiguration of its digital control surface, impacting how external parties evaluate interconnected infrastructure risk.

Confidence?Confidence Grade
0.90–1.00AHigh — direct sources
0.75–0.89A/BStrong
0.55–0.74B/CMedium
0.35–0.54C/DWeak–medium
0.10–0.34DWeak signal
0.00–0.09DInternal monitoring
High confidence (95%)

Several public sources

AD MEPSO JSC is identified in public internet registries as the holder of AS210865 and is the legal name for North Macedonia’s electricity transmission operator. Six official sources—including RDAP, RIPEstat, operator website, ENTSO-E, and national regulator—confirm the organization’s identity and TSO mandate. No IP prefix announcements are currently observable, so the public footprint is limited to the ASN registration. The key uncertainty is the absence of a direct corporate registry extract and prefix data; watchpoints center on changes to AS210865 records, new prefix announcements, or domain modifications. This profile is useful for infrastructure dependency mapping but does not capture internal network topology or financial structure.

AD MEPSO JSC

AD MEPSO JSC is the legal name used in internet number registry records for North Macedonia’s electricity transmission system operator. The organisation holds autonomous system AS210865 and maintains an official website at mepso.com.mk. Public evidence confirms it is the sole national TSO, a critical infrastructure role.

Why It Matters

Changes in AD MEPSO JSC’s public internet records directly alter the baseline for assessing this critical energy operator’s network dependencies. A newly announced IP prefix or a reassigned ASN could reflect a material expansion or reconfiguration of its digital control surface, impacting how external parties evaluate interconnected infrastructure risk.

What Public Sources Show

AD MEPSO JSC is the legal name tied to North Macedonia’s electricity transmission system operator (TSO) in public internet registry records. The organisation holds autonomous system AS210865 and runs the official website mepso.com.mk. Its role as the sole national TSO is corroborated by ENTSO-E, the country’s energy regulator, and its own corporate disclosures.

MEPSO plans, builds, and operates the high-voltage grid that delivers electricity across North Macedonia. This places it at the heart of the nation’s critical infrastructure. While its core mission is physical grid reliability, the existence of a registered ASN signals that the entity maintains at least one point of connection to the global routing system.

The public evidence, however, does not currently include any IP prefixes announced by AS210865. This means that the observable internet control surface is limited to the ASN registration and the corporate domain. Without prefix data, analysts cannot map which networks the TSO directly exchanges traffic with or how extensively it uses internet connectivity for operational purposes.

What matters for infrastructure dependency monitoring is the potential for change. A new prefix advertisement, a reassignment of AS210865, or an alteration in the RIPE registration could signal a reconfiguration of MEPSO’s network architecture. Such shifts might reflect new internal IT projects, supplier changes, or expansions of its digital footprint that could affect the risk surface of the power grid.

The key uncertainty lies in the absence of a direct corporate registry extract from North Macedonia’s commercial register. While the website and ENTSO-E listing confirm the operating role, the exact legal form and ownership structure behind AD MEPSO JSC remain unverified from the open sources assembled here. This gap limits the depth of financial or governance analysis.

Watchpoints for this profile include any updates to the AS210865 records in RIPE or RDAP, new BGP announcements observed from that ASN, changes to the mepso.com.mk domain registration, and any revisions to MEPSO’s status on the ENTSO-E TSO page. Each of these can serve as a low-effort early-warning indicator for an analyst tracking critical infrastructure internet change.

The profile is built on six low-risk public resources: the RDAP entry for AS210865, the RIPEstat overview, MEPSO’s own about-us and contact pages, the ENTSO-E TSO listing, and the pages of North Macedonia’s Energy Regulatory Commission. All are accessible online and were current as of the profile date.

Operating Surface

MEPSO operates the national high-voltage electricity transmission grid under a mandate confirmed by ENTSO-E and the national energy regulator. Its internet presence is minimal, with an ASN registration that places it on the public routing map, though no active IP prefixes are currently evident.

As the sole electricity transmission operator in North Macedonia, any observable change in its internet-facing posture—such as new prefix announcements, registry alterations, or domain modifications—offers a signal that could indicate shifts in network dependency, infrastructure reach, or operational continuity relevant to infrastructure risk mapping.

Watchpoints

AD MEPSO JSC’s observable internet footprint is currently a thin but stable signal: an ASN registration with no active prefixes. Its role as sole national TSO gives any change in its network posture disproportionate importance for infrastructure dependency models. Monitoring its registry records and domain changes provides a low-cost early-warning indicator for this critical energy actor.

Changes to AS210865 (holder, contact, status), new IP prefix announcements, alterations to mepso.com.mk registration, or updates to its ENTSO-E listing are the observable triggers. A sudden reconfiguration could indicate new connectivity requirements, partnership changes, or internal IT restructuring.

Missing: a direct corporate registry extract confirming the legal entity details, any routing policy or PeeringDB entry, active BGP prefix evidence, and financial or customer data. Without prefix visibility, the full extent of its network participation cannot be assessed from public sources alone.

Sources

  • Registry RDAP / WHOIS record - public-source identity and registry context for AD MEPSO JSC.
  • RIPE registry record - RIPEstat provides a public overview page for ASN AS210865, corroborating that the ASN exists in RIPE-related routing/registry systems.
  • Operator website - MEPSO describes itself as the electricity transmission system operator in the Republic of North Macedonia.
  • Operator website - The company publishes official contact details and confirms use of the domain mepso.com.mk.
  • entsoe.eu - ENTSO-E identifies MEPSO as the transmission system operator for North Macedonia.
  • erc.org.mk - The Energy, Water Services and Municipal Waste Management Services Regulatory Commission of North Macedonia provides regulatory context for electricity market and transmission licensing relevant to MEPSO’s operating environment.

Domain of operation

AD MEPSO JSC is the legal name used in internet number registry records for North Macedonia’s electricity transmission system operator. The organisation holds autonomous system AS210865 and maintains an official website at mepso.com.mk. Public evidence confirms it is the sole national TSO, a critical infrastructure role.

  • Registry RDAP / WHOIS record: public-source identity and registry context for AD MEPSO JSC. Evidence basis: source-25ba5efc9b82

Timeline

  1. AD MEPSO JSC public evidence observed

    As the sole electricity transmission operator in North Macedonia, any observable change in its internet-facing posture—such as new prefix announcements, registry alterations, or domain modifications—offers a signal that could indicate shifts in network dependency, infrastructure reach, or operational continuity relevant to infrastructure risk mapping.

At A Glance

  • Name: AD MEPSO JSC
  • Type: Digital infrastructure institution
  • Base: North Macedonia
  • Profile focus: Institution

What It Does

  • public operating records
  • official service pages
  • source-backed relationship updates

Why It Matters

  • Changes in AD MEPSO JSC’s public internet records directly alter the baseline for assessing this critical energy operator’s network dependencies. A newly announced IP prefix or a reassigned ASN could reflect a material expansion or reconfiguration of its digital control surface, impacting how external parties evaluate interconnected infrastructure risk.
  • Operational criticality: Medium
  • Time horizon: Next quarter

What To Watch

  • official company sources
  • public registries
  • operator-published records
NowMedium priority

Track verified source updates, role changes, and current public evidence.

QuarterMedium policy sensitivity

Changes in AD MEPSO JSC’s public internet records directly alter the baseline for assessing this critical energy operator’s network dependencies. A newly announced IP prefix or a reassigned ASN could reflect a material expansion or reconfiguration of its digital control surface, impacting how external parties evaluate interconnected infrastructure risk.

YearNext quarter outlook

Longer-term relevance depends on verified operating, policy, and relationship changes.

Member Briefing

Deeper Profile Context

Login is required to unlock the full profile briefing and source notes.

Only for Strategy Circle

Strategic Circle Access

Open to all readers. Unlock profile briefings after joining and logging in.

Join Strategic Circle

Only for Leadership Alliance

Leadership Alliance Access

For owners and management of IP-holding companies. Login required to unlock.

Join Leadership Alliance

Public View

Changes in AD MEPSO JSC’s public internet records directly alter the baseline for assessing this critical energy operator’s network dependencies. A newly announced IP prefix or a reassigned ASN could reflect a material expansion or reconfiguration of its digital control surface, impacting how external parties evaluate interconnected infrastructure risk.

Watchpoints

  • AD MEPSO JSC’s observable internet footprint is currently a thin but stable signal: an ASN registration with no active prefixes.
  • Its role as sole national TSO gives any change in its network posture disproportionate importance for infrastructure dependency models.
  • Monitoring its registry records and domain changes provides a low-cost early-warning indicator for this critical energy actor.

Caveats

  • Public evidence is used only for source-backed claims.
  • Private control or contract claims require separate public support.

FAQ

Why does BTW track AD MEPSO JSC?

As the sole electricity transmission operator in North Macedonia, any observable change in its internet-facing posture—such as new prefix announcements, registry alterations, or domain modifications—offers a signal that could indicate shifts in network dependency, infrastructure reach, or operational continuity relevant to infrastructure risk mapping.

What evidence supports the profile?

public-source identity and registry context for AD MEPSO JSC.

What should readers watch next?

AD MEPSO JSC’s observable internet footprint is currently a thin but stable signal: an ASN registration with no active prefixes.

← BackAll Companies