Summary
- Iridium's own technical paper separates conjunction data messages from alerts — an alert is the subset of that data above a probability-of-collision threshold — and prints the thresholds: 2.0 × 10⁻⁴ non-catastrophic and 1.0 × 10⁻⁴ catastrophic, or a 100-metre miss, for Block 1; 1.2 × 10⁻⁴ and 6.0 × 10⁻⁵ for Block 2.
- The one printed pairing of burns to warnings for a named period is 41 collision-mitigation manoeuvres from 46 close-approach warnings between February 2009 and February 2011, and its stated source is an Iridium presentation of 9 March 2011.
- The only refined post-manoeuvre assessment in Iridium's own record belongs to a station-keeping burn on Iridium 33 eight hours before it was destroyed, which is why a reader can audit that burn and no other.
On 10 February 2009, at 1656 GMT, Iridium 33 and Cosmos 2251 met at 790 kilometres above extreme northern Siberia. The Iridium satellite was operational and the Cosmos was dead. Their planes crossed at nearly a right angle — 86.4 degrees against 74.0 — and the closing speed was above 11 kilometres a second. By the end of March 2009 the U.S. Space Surveillance Network had catalogued 823 of the larger fragments; a year later the two clouds stood at 1,228 and 512 pieces, 1,740 in all, with roughly 400 more identified for future cataloguing (NASA Orbital Debris Quarterly News, April 2009; the same quarterly, April 2010).
That debris field is the reason to ask this operator about avoidance. About 3,300 further catalogued objects pass through the constellation's altitude regime, and the agency's contemporaneous account says close approaches with Iridium spacecraft are common. The hazard is not historical. The record of what the operator does about it is.
Start with the vocabulary, because the vocabulary is the instrument. Ryan Shepperd of Iridium wrote the line in a 2024 conference paper: "Conjunction data messages are appropriately named as data and should not be conflated with alerts, which are the subset of those data that exceeds a probability of collision threshold" (How to Categorize an Avoidance Maneuver: Untangling the Iridium Experience). Data, alert, burn: three stages, and the publisher of the middle one is the party the first one is about.
The same paper prints the thresholds in a table, for the mission and spare phases of the vehicles at under 72 hours to closest approach. Block 1: 2.0 × 10⁻⁴ for a non-catastrophic event; 1.0 × 10⁻⁴, or a miss distance under 100 metres, for a catastrophic one. Block 2: 1.2 × 10⁻⁴ and 6.0 × 10⁻⁵. A 100-metre miss distance also sits under the table as a safety net for large secondary objects, a hedge against covariance-realism problems. The paper says the numbers are approximately the 1 × 10⁻⁴ of published best practice but were originally derived from control-box and service-disruption constraints.
No regulator set them, and no document among the ten read for this article assigns them to one.
Then the workload, which is the operator's own and is the only defined figure about volume in anything reviewed here. A 2025 poster by Shepperd and William Boyce III states that at a mean altitude near 775 kilometres each Iridium satellite averages about 40 conjunctions inside a 25-kilometre in-track, 25-kilometre cross-track, 2-kilometre radial screening volume over seven days (Iridium's Use of Mean Elements in Collision Assessment). Sixty-six operational satellites, on the architecture Iridium Communications Inc. describes in its most recent annual report (Form 10-K for the year ended 31 December 2025), multiply out — my arithmetic, not the operators' — to about 2,640 conjunctions a week for the constellation, or roughly 137,650 in a year on a 52.14-week basis. That is traffic. It is not alarms, and it is not burns.
The pairing a reader would want is burns against the alerts they answered. It exists once, for a two-year window, and the carrier is a National Research Council report rather than an Iridium publication: "Between February 2009 and February 2011, Iridium made 41 collision mitigation maneuvers based on 46 close approach warnings; however, all of these actions were integrated into normal constellation maintenance actions and so had little impact on Iridium operations" (Limiting Future Collision Risk to Spacecraft). Footnote six attributes the figures to J. Campbell of Iridium, at a workshop held on 9 March 2011 in Washington. My conversions: 0.89 burns per warning, five warnings in the window that produced no burn, 20.5 burns a year. The report also says the actions were folded into ordinary constellation maintenance, which is where the cost of avoidance would hide if the operator ever published the cost of avoidance.
For anything after February 2011 the operator's own series stops being a number. Figure 2 of the 2024 paper is titled "Internally assessed alerts": 90-day bins, bars split into posigrade, retrograde and no manoeuvre, a left axis running 0 to 40, a right panel normalised per operational vehicle with the F10.7 solar flux index overlaid. The values of those bars are not in the text layer that a reader or a search engine receives, and no annual total appears beside them.
What the paper says about its own series is more useful than any figure I could lift from it: the screening volume has not been constant and has grown over time at operators' request, so today's volumes include far more conjunctions than those that could be a concern, and counts are not comparable across years. It adds that avoidance manoeuvres bear an approximate inverse relationship with solar activity. An operator telling you its own time series is not a trend is doing the reader's work; a reader should take it.
The operator also argues the volume is a virtue — that a large unfiltered screen matters and that many conjunction data messages should not be read as false alarms rather than data. That is a defensible position about data handling. It does not restore the denominator.
Where a total is published, it belongs to someone else. A Viasat white paper carries one row for Iridium: 778 kilometres, 86.4 degrees, 75 satellites, 725,000 warnings, 80,400 manoeuvres, 2 collisions, over 15 years (Managing Mega-Constellation Risks in LEO). The retrieved table prints no definition of "warning" or "manoeuvre" and no window boundaries. Read as printed it would mean 5,360 manoeuvres a year, which is 261 times the 20.5 a year the 2011 count implies — and its 48,333 implied warnings a year sit below my 137,650 conjunctions a year from the operator's own screening volume, so the two published quantities cannot be the same thing. One of these figures counts something else. I print the pair and decline the quotient, because a rate built across two undefined units would be a number no document contains.
A comparison inside one publisher is safer. NASA's inspector general reported in January 2021 that to avoid debris larger than 10 centimetres the agency had the International Space Station conduct approximately 27 collision-avoidance manoeuvres since 1999, the most recent in September 2020, and that the Department of Defense screens designated NASA assets three times daily, every eight hours for human spaceflight (NASA's Efforts to Mitigate the Risks Posed by Orbital Debris). Twenty-seven burns across twenty-one years for a crewed station is not a benchmark for a 66-satellite constellation, and that is the point: the only programme with a public burn history and a public screening cadence also has a public account of each decision. Nothing comparable exists for this operator.
Now the check that decides whether any burn worked. It appears once in Iridium's own technical record, and it is not about a collision-avoidance manoeuvre. Iridium 33 fired its hydrazine thruster twice eight hours before the conjunction, raising the semimajor axis by 8.3 metres for station-keeping. A batch estimate on the three passes available afterwards gave an 11.8-metre miss distance and a 56 per cent chance of being inside the combined hard-body radius, at 11.6 kilometres a second (Subsequent Assessment of the Collision between Iridium 33 and COSMOS 2251). Section 6 of that paper is headed "The refined post-maneuver assessment"; Table 3 is headed "Post-maneuver refined probability of collision". It is a rigorous, humbling document, and it exists because the satellite was destroyed.
The National Research Council adds the sentence that makes the irony exact: before that collision Iridium had never manoeuvred in response to a close-approach prediction, and the prediction for 10 February 2009 was a 584-metre close approach which was not among the top predicted close approaches for that week. The one burn the operator has publicly checked afterwards was a station-keeping burn on a satellite that no manoeuvre saved.
For scale on what a threshold means physically, NASA's own training material puts an approach inside a 4-kilometre by 10-kilometre by 4-kilometre box at a collision risk on the order of 1 in 100,000, after which a manoeuvre is further evaluated (Orbital Debris Management and Risk Mitigation). That is a general construct; the excerpt carries no date and does not state that these are this operator's or the 18th Space Defense Squadron's current parameters, and I do not read it as either.
So the boundary, stated where it belongs. Across the ten documents read on 25 November 2026 — the annual report, three Iridium conference papers, the National Research Council chapter, two NASA debris quarterlies, the NASA inspector general's audit, the NASA training material and the Viasat paper — exactly one prints burns against warnings for a named period, and it is fifteen years old. None prints the cost of avoidance in any unit: not propellant mass, not service interruption, not satellite life. None prints a post-manoeuvre re-assessment of a collision-avoidance burn.
The most recent annual report was available only in part, so what I can say about it is that its retrieved business overview carries the 66-satellite architecture and no collision-avoidance figure — not that the filing is silent.
The falsifiable test is this: if the burn count is published while the alert count for the same period survives only in a 2011 footnote and no post-burn check of a collision-avoidance manoeuvre appears in any document read, then the published record establishes that Iridium moved and cannot establish whether the move was needed or whether it worked. Publish one alert total and one refined post-burn miss distance for the same quarter, and this article's finding expires.
Our own coverage of this operator has followed its registry record, its chip partnership, its voice-messaging demonstration, its industrial internetworking work and the bid to acquire it. None of it asked what a burn count divides. IRIDIUM SATELLITE,LLC sits in our directory as Iridium Satellite, LLC, and the question is filed against the operator, not against the engineers. Iridium is one of the few companies in this business that publishes its thresholds at all. The 41 and the 46 were given to a workshop in 2011, in a room full of people who wanted the number. Fifteen years later the industry still quotes that room. That is not a failure of candour; it is a failure of renewal — a publisher that stopped printing the one pair of numbers that would let a stranger check whether the last fifty burns were worth making.
Member Briefing
Read the full trend briefing
Members read the full briefing with the source notes behind every finding.
Strategic Circle
A daily briefing in your language, built from changes we have verified.
Join for USD 20/monthCancel anytime.
Members also get the full research library, a daily briefing on the networks they follow and the private forum.